Schedule_of_Items.xls

XLS spreadsheet 39 KB Posted

Attached to
Witch Fire Road Repair Federal contract opportunity
Solicitation number
AG-9A40-S-16-0005
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Fillable Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Witch Fire Road Repair, newest first.
File Type Posted
Revised_SF-30.pdf PDF
Section_L_and_M_(Part_IV).pdf PDF
SF-30.pdf PDF
Revised_Schedule_of_Items.xls XLS spreadsheet
Contract_Map_(North_Map_2).pdf PDF
RIPRAP_rev.pdf PDF
Pre-Bid_attendance_Sheet.pdf PDF
Pre-Bid_Mtg_Notes.pdf PDF
Revised_Road_Logs_.pdf PDF
SPS.pdf PDF
Drawings.pdf PDF
Maps.pdf PDF
Statement_of_Work.pdf PDF
Witch_Fire_Road_Logs.pdf PDF
Fire_Plan_.pdf PDF
Wage_Determination.pdf PDF
Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate

SCHEDULE OF ITEMS
WITCH FIRE ROAD REPAIR
PALOMAR RANGER DISTRICT
CLEVELAND NATIONAL FOREST
Item NumberDescriptionMMPay UnitEst QuantUnit PriceTotalMaterialsEquipmentLabor
QTYcosttotalQTYcosttotalQTYcosttotal
BASE BID
819 (1)Riprap for Drainage Armor, Class IIAQTon70$________$________
819 (1)Riprap for Hardened Crossing, Class IIAQTon320$________$________
819 (1)Riprap for Overside Drain Outlet, Class IIAQTon29$________$________
832 (2)Furnish and Install 18" Over-side Drain w/ 10' FlumeAQEach140$________$________
$________$________
839 (01)Restore Drainage FunctionAQMile29.58$________$________
839 (02)Construct Rolling DipAQEach103$________$________
839 (03)Construct Rolling Dip with Lead Off DitchAQEach1$________$________
$________$________
842 (01)Outlet Structures - Repair/Reinstall Overside DrainAQEach4$________$________
881 (02)MobilizationJOBLSQ1$________$________
Total Base Bid$______________35cy @1.7ton/cy=60
ADDITIVE ITEM 1 (BLACK MTN. SPUR)
819 (1)Riprap for Hardened Crossing, Class IIAQTon12$________$________
839 (01)Restore Drainage FunctionAQMile0.77$________$________
881 (2)MobilizationJOBLSQ1$________$________
Total Option 1$______________
ADDITIVE ITEM 2 (BODEN CANYON ROAD)
832 (2)Furnish and Install 18" Over-side Drain w/ 10' FlumeAQEach21$________$________
834 (4)Drainage Structure Mtc. - Furnish and Install 24" Flared EndAQEach1$________$________
839 (01)Restore Drainage FunctionAQMile1.6$________$________
839 (02)Construct Rolling DipAQEach21$________$________
839 (03)Construct Rolling Dip with Lead Off DitchAQEach1$________$________
842 (01)Outlet Structures - Repair/Reinstall Overside DrainAQEach1$________$________
881 (2)MobilizationJOBLSQ1$________$________
Total Option 2$______________

&R&"Arial,Regular"&12Solicitation No. AG-9A40-S-16-0005 Witch Fire Road Repair

File details come from the government source that posted it. Updated .