RFI_March_21.pdf
PDF 14 KB Posted
- Attached to
- Duff Creek Aquatic Organism Passage Federal contract opportunity
- Solicitation number
- AG-9A40-S-16-0004
About this file
RFI
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Construction_Drawings_Rev_04_21.pdf | ||
| Habitat_Boulder_Specifications.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| SF_30.pdf | ||
| RFI_Bates_Construction.pdf | ||
| Specifications_REV_04_21.pdf | ||
| SF-30_Amendment_No._3.pdf | ||
| RFI_Bates_Construction.pdf | ||
| Habitat_Boulder_Specifications.pdf | ||
| SF-30_Amendment_No.2.pdf | ||
| Drawings_REV_2.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| Drawings_REV_1.pdf | ||
| PART_IV.pdf | ||
| Pre-bid_Attendance_Sheet.pdf | ||
| SF_30.pdf | ||
| EROSION_CONTROL_PLAN.pdf | ||
| Pre-bid_Notes.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| SOW.pdf | ||
| Specifications.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| SF_24_Bid_Bond.pdf | ||
| Fire_Plan_2013.pdf | ||
| Wage_Provision_.pdf | ||
| Construction_Drawings.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI’s March 21, 2016
On Schedule of Items, Site 2 has Item 635(01) Temporary Traffic Control.
Site 1 does not. Should it have a bid item for that?
Bid item 635(01) listed in Schedule of Items Site 2 shall include both Site 1 and Site 2.
When I compare Page 2 of 2 of the plans, Summary of Quantities for both sites one and two with the Schedule of Bid Items, There are a lot of discrepancies in quantities.
I have already mentioned some of them in amendment 1.
See items 301(01), 403(01), 68(02)A, 648(04), 208(01), 208(03). Please let us know which quantities are accurate.
See revised Schedule of Items and plan sheet Summary of Quantities 2 of 2 in the Amendment to the Solicitation in FBO.
Also, on Pages 30-31 of 31 of the Solicitation Specifications, 705.08 Channel Rock, am I correct that you are asking for river rock?
Rock Class size 3….36” Diameter for cross vanes
Site 1, the Schedule of Items, 648(02)A Placed Fish Rest Stop Rock, FRS-24, Method A. the plans do not show any Fish Rest Stop Rocks on Site 1. Where do the Fish Stop rocks go? The plans do show Bank Armoring, but there is no bid item for it. Are we to assume that the Schedule of Items should have read Bank Armoring Rocks instead of Fish Stop Rocks?
Site 1 648(02) is changed to Placed Bank Armoring Rock 2 (24” dia.) Method A
Site 2, the Schedule of Items, 648(04) Placed Streambed Simulation Rock, bed class, method A.
No bed class size is listed. What is the bed class for the Schedule of Items?
Bed Class 8
Is this the Bed Class 8 listed in the Dimension Table on Page 6 of 13 of the plans?
Yes
Page 6 of 13 of Plans - Dimension Table shows Channel Rock. Where does the Channel Rock go?
Cross Vane Structure
Is it the header and footer rocks in the Cross Vane structures and is that the same as the Fish Rest Stop Rock listed on the Schedule of Items 648(02)A?
Yes.
I do not see any Fish Stop Rocks on the plans.
Cross Vane Structure and Channel Rocks (same)
In the Solicitation, page 54 of 56 M.4. Technical Proposal Instructions, none of the items that you ask us to address apply to this project. If you want us to address specific items, please let us know which ones.
See Amendment No. One.
On Page 2 of 2, Duff Creek Site 2 Summary of Quantities:
648(02)A Placed Fish Rest Stop Rock, FRS-36, Method B - 112 each vs Schedule of Items lists Method A - 205 each
Quantity should be 112 each
648(04) Place Streambed Simulation Rock, Bed Class, Method A 205 CY vs Schedule of Items lists 47 CY.
Quantity should be 288 CY