RFI_March_21.pdf

PDF 14 KB Posted

Attached to
Duff Creek Aquatic Organism Passage Federal contract opportunity
Solicitation number
AG-9A40-S-16-0004
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

RFI

View the file

Other files for this federal contract opportunity

Other files attached to Duff Creek Aquatic Organism Passage, newest first.
File Type Posted
Construction_Drawings_Rev_04_21.pdf PDF
Habitat_Boulder_Specifications.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
SF_30.pdf PDF
RFI_Bates_Construction.pdf PDF
Specifications_REV_04_21.pdf PDF
SF-30_Amendment_No._3.pdf PDF
RFI_Bates_Construction.pdf PDF
Habitat_Boulder_Specifications.pdf PDF
SF-30_Amendment_No.2.pdf PDF
Drawings_REV_2.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
Drawings_REV_1.pdf PDF
PART_IV.pdf PDF
Pre-bid_Attendance_Sheet.pdf PDF
SF_30.pdf PDF
EROSION_CONTROL_PLAN.pdf PDF
Pre-bid_Notes.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
SOW.pdf PDF
Specifications.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
SF_24_Bid_Bond.pdf PDF
Fire_Plan_2013.pdf PDF
Wage_Provision_.pdf PDF
Construction_Drawings.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI’s March 21, 2016

On Schedule of Items, Site 2 has Item 635(01) Temporary Traffic Control.

Site 1 does not. Should it have a bid item for that?

Bid item 635(01) listed in Schedule of Items Site 2 shall include both Site 1 and Site 2.

When I compare Page 2 of 2 of the plans, Summary of Quantities for both sites one and two with the Schedule of Bid Items, There are a lot of discrepancies in quantities.

I have already mentioned some of them in amendment 1.

See items 301(01), 403(01), 68(02)A, 648(04), 208(01), 208(03). Please let us know which quantities are accurate.

See revised Schedule of Items and plan sheet Summary of Quantities 2 of 2 in the Amendment to the Solicitation in FBO.

Also, on Pages 30-31 of 31 of the Solicitation Specifications, 705.08 Channel Rock, am I correct that you are asking for river rock?

Rock Class size 3….36” Diameter for cross vanes

Site 1, the Schedule of Items, 648(02)A Placed Fish Rest Stop Rock, FRS-24, Method A. the plans do not show any Fish Rest Stop Rocks on Site 1. Where do the Fish Stop rocks go? The plans do show Bank Armoring, but there is no bid item for it. Are we to assume that the Schedule of Items should have read Bank Armoring Rocks instead of Fish Stop Rocks?

Site 1 648(02) is changed to Placed Bank Armoring Rock 2 (24” dia.) Method A

Site 2, the Schedule of Items, 648(04) Placed Streambed Simulation Rock, bed class, method A.

No bed class size is listed. What is the bed class for the Schedule of Items?

Bed Class 8

Is this the Bed Class 8 listed in the Dimension Table on Page 6 of 13 of the plans?

Yes

Page 6 of 13 of Plans - Dimension Table shows Channel Rock. Where does the Channel Rock go?

Cross Vane Structure

Is it the header and footer rocks in the Cross Vane structures and is that the same as the Fish Rest Stop Rock listed on the Schedule of Items 648(02)A?

Yes.

I do not see any Fish Stop Rocks on the plans.

Cross Vane Structure and Channel Rocks (same)

In the Solicitation, page 54 of 56 M.4. Technical Proposal Instructions, none of the items that you ask us to address apply to this project. If you want us to address specific items, please let us know which ones.

See Amendment No. One.

On Page 2 of 2, Duff Creek Site 2 Summary of Quantities:

648(02)A Placed Fish Rest Stop Rock, FRS-36, Method B - 112 each vs Schedule of Items lists Method A - 205 each

Quantity should be 112 each

648(04) Place Streambed Simulation Rock, Bed Class, Method A 205 CY vs Schedule of Items lists 47 CY.

Quantity should be 288 CY