Duff_Creek_Schedule_of_Items.xls
XLS spreadsheet 34 KB Posted
- Attached to
- Duff Creek Aquatic Organism Passage Federal contract opportunity
- Solicitation number
- AG-9A40-S-16-0004
About this file
Revised Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Construction_Drawings_Rev_04_21.pdf | ||
| Habitat_Boulder_Specifications.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| SF_30.pdf | ||
| RFI_Bates_Construction.pdf | ||
| Specifications_REV_04_21.pdf | ||
| SF-30_Amendment_No._3.pdf | ||
| RFI_Bates_Construction.pdf | ||
| Habitat_Boulder_Specifications.pdf | ||
| SF-30_Amendment_No.2.pdf | ||
| RFI_March_21.pdf | ||
| Drawings_REV_2.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| Drawings_REV_1.pdf | ||
| PART_IV.pdf | ||
| Pre-bid_Attendance_Sheet.pdf | ||
| SF_30.pdf | ||
| EROSION_CONTROL_PLAN.pdf | ||
| Pre-bid_Notes.pdf | ||
| SOW.pdf | ||
| Specifications.pdf | ||
| Duff_Creek_Schedule_of_Items.xls | XLS spreadsheet | |
| SF_24_Bid_Bond.pdf | ||
| Fire_Plan_2013.pdf | ||
| Wage_Provision_.pdf | ||
| Construction_Drawings.pdf |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EngEst
| SCHEDULE OF ITEMS | |||||
| DUFF CREEK AOP SITE 1 CULVERT REPLACEMENT | |||||
| HIGH SIERRA RANGER DISTRICT | |||||
| SIERRA NATIONAL FOREST | |||||
| FRESNO COUNTY | |||||
| PROJECT: Duff Creek AOP Site 1 Culvert Replacement | |||||
| Pay Item No. | Item Description | Est Quan | Unit | Unit Price | Amount |
| Base Work Items: | |||||
| 152(05) | Culvert Staking | 1 | LS | $_______ | $___________ |
| 154(01) | Contractor Sampling And Testing Compaction and Concrete | 1 | LS | $_______ | $___________ |
| 157(13) | Soil Erosion and Pollution Control Plan and Implementation | 1 | LS | $_______ | $___________ |
| 201(02) | Clearing and grubbing | 1 | LS | $_______ | $___________ |
| 203(05) | Removal of Structures and Obstructions | 1 | LS | $_______ | $___________ |
| 204(71) | Embankment Construction, Compaction Method D, Finishing Method B (includes excavation for new profile grade.) | 1 | LS | $_______ | $___________ |
| 208(01) | Structural Excavation | 133 | CY | $_______ | $___________ |
| 208(03) | Structural Backfill | 112 | CY | $_______ | $___________ |
| 251(01) | Placed Riprap, Class 4, method A | 8 | CY | $_______ | $___________ |
| 251(10) | Hand Placed Riprap, Class 2 | 4 | CY | $_______ | $___________ |
| 301(01) | Aggregate Base, Grading C, Compaction D | 150 | Ton | $_______ | $___________ |
| 403(01) | Hot asphalt concrete pavement class C, grading B | 100 | Ton | $_______ | $___________ |
| 553(05) | Precast 12' Span, 6' Rise concrete box culvert | 1 | LS | $_______ | $___________ |
| 648(02) | Placed Bank Armoring Rock, Rock - 2, (24" Dia.), Method A | 56 | EA | $_______ | $___________ |
| TOTAL | $___________ | ||||
| SCHEDULE OF ITEMS | |||||
| DUFF CREEK AOP SITE 2 CULVERT REPLACEMENT | |||||
| HIGH SIERRA RANGER DISTRICT | |||||
| SIERRA NATIONAL FOREST | |||||
| FRESNO COUNTY | |||||
| PROJECT: Duff Creek AOP Site 2 Culvert Replacement | |||||
| Pay Item No. | Item Description | Est Quan | Unit | Unit Price | Amount |
| Base Work Items: | |||||
| 151(01) | Mobilization (includes bonding cost) Both sites | 1 | LS | $_______ | $___________ |
| 152(05) | Culvert Staking | 1 | LS | $_______ | $___________ |
| 154(01) | Contractor Sampling And Testing Compaction and Concrete | 1 | LS | $_______ | $___________ |
| 157(13) | Soil Erosion and Pollution Control Plan and Implementation | 1 | LS | $_______ | $___________ |
| 201(02) | Clearing and Grubbing | 1 | LS | $_______ | $___________ |
| 203(05) | Removal of Structures and Obstructions | 1 | LS | $_______ | $___________ |
| 204(18) | Drainage Excavation, Type Minor Channel change | 320 | CY | $_______ | $___________ |
| 204(71) | Embankment Construction, compaction Method D, finishing Method B, (Includes excavation for new profile grade) | 1 | LS | $_______ | $___________ |
| 208(01) | Structural Excavation | 605 | CY | $_______ | $___________ |
| 208(03) | Structural Backfill | 400 | CY | $_______ | $___________ |
| 251(02) | Placed Riprap, Class 4, method A | 100 | CY | $_______ | $___________ |
| 251(16) | Geotextile, Type IV-C | 170 | SY | $_______ | $___________ |
| 301(01) | Aggregate Base, grading C, Compaction D | 150 | Ton | $_______ | $___________ |
| 403(01) | Hot asphalt concrete pavement class C, grading B | 100 | Ton | $_______ | $___________ |
| 552(01) | Structural Concrete Class A (AE) includes forms, falsework and reinforcing steel | 65 | CY | $_______ | $___________ |
| 554(01) | Reinforcing Steel | 8800 | LB | $_______ | $___________ |
| 603(02) | 20' Span, 10' Rise, Structural Plate Pipe Arch, 10 gauge Thick | 72 | LF | $_______ | $___________ |
| 634(01) | Pavement Markings Type A | 1 | LS | $_______ | $___________ |
| 635(01) | Temporary Traffic Control | 1 | LS | $_______ | $___________ |
| 648(02)A | Placed Channel Rock, Rock 3 (36" Dia.), method A | 112 | EA | $_______ | $___________ |
| 648(04) | Placed Streambed simulation rock, bed class 8, method A | 288 | CY | $_______ | $___________ |
| TOTAL | $___________ | ||||
| Optional Item | |||||
| 202(01) | Additional Clearing and Grubbing (Tree Removal) | 4 | EA | $_______ | $___________ |
&R&12Solicitation No. AG-9S40-S-16-0004 Duff Creek Aquatic Organism Passage Amendment No. One