Duff_Creek_Schedule_of_Items.xls

XLS spreadsheet 39 KB Posted

Attached to
Duff Creek Aquatic Organism Passage
Solicitation number
AG-9A40-S-16-0004
Issued by

About this file

Schedule of Items

View the file

Other files

File Type Posted
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
RFI_Bates_Construction.pdf PDF
Construction_Drawings_Rev_04_21.pdf PDF
SF_30.pdf PDF
Specifications_REV_04_21.pdf PDF
Habitat_Boulder_Specifications.pdf PDF
SF-30_Amendment_No._3.pdf PDF
RFI_Bates_Construction.pdf PDF
Habitat_Boulder_Specifications.pdf PDF
Drawings_REV_2.pdf PDF
SF-30_Amendment_No.2.pdf PDF
RFI_March_21.pdf PDF
Pre-bid_Notes.pdf PDF
Drawings_REV_1.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
PART_IV.pdf PDF
SF_30.pdf PDF
EROSION_CONTROL_PLAN.pdf PDF
Pre-bid_Attendance_Sheet.pdf PDF
Fire_Plan_2013.pdf PDF
Wage_Provision_.pdf PDF
SF_24_Bid_Bond.pdf PDF
Construction_Drawings.pdf PDF
SOW.pdf PDF
Specifications.pdf PDF
Duff_Creek_Schedule_of_Items.xls XLS spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EngEst

SCHEDULE OF ITEMS
DUFF CREEK AOP SITE 1 CULVERT REPLACEMENT
HIGH SIERRA RANGER DISTRICT
SIERRA NATIONAL FOREST
FRESNO COUNTY
PROJECT: Duff Creek AOP Site 1 Culvert Replacement
Pay Item No.Item DescriptionEst QuanUnitUnit PriceAmount
Base Work Items:
152(05)Culvert Staking1LS$_______$___________
154(01)Contractor Sampling And Testing Compaction and Concrete1LS$_______$___________
157(13)Soil Erosion and Pollution Control Plan and Implementation1LS$_______$___________
201(02)Clearing and grubbing1LS$_______$___________
203(05)Removal of Structures and Obstructions1LS$_______$___________
204(71)Embankment Construction, Compaction Method D, Finishing Method B (includes excavation for new profile grade.)1LS$_______$___________
208(01)Structural Excavation133CY$_______$___________
208(03)Structural Backfill112CY$_______$___________
251(01)Placed Riprap, Class 4, method A8CY$_______$___________
251(10)Hand Placed Riprap, Class 24CY$_______$___________
301(01)Aggregate Base, Grading C, Compaction D150Ton$_______$___________
403(01)Hot asphalt concrete pavement class C, grading B100Ton$_______$___________
553(05)Precast 12' Span, 6' Rise concrete box culvert1LS$_______$___________
648(02)Placed Bank Armoring Rock, Rock - 2, (24" Dia.), Method A56EA$_______$___________
TOTAL$___________
SCHEDULE OF ITEMS
DUFF CREEK AOP SITE 2 CULVERT REPLACEMENT
HIGH SIERRA RANGER DISTRICT
SIERRA NATIONAL FOREST
FRESNO COUNTY
PROJECT: Duff Creek AOP Site 2 Culvert Replacement
Pay Item No.Item DescriptionEst QuanUnitUnit PriceAmount
Base Work Items:
151(01)Mobilization (includes bonding cost) Both sites1LS$_______$___________
152(05)Culvert Staking1LS$_______$___________
154(01)Contractor Sampling And Testing Compaction and Concrete1LS$_______$___________
157(13)Soil Erosion and Pollution Control Plan and Implementation1LS$_______$___________
201(02)Clearing and Grubbing1LS$_______$___________
203(05)Removal of Structures and Obstructions1LS$_______$___________
204(18)Drainage Excavation, Type Minor Channel change320CY$_______$___________
204(71)Embankment Construction, compaction Method D, finishing Method B, (Includes excavation for new profile grade)1LS$_______$___________
208(01)Structural Excavation605CY$_______$___________
208(03)Structural Backfill400CY$_______$___________
251(02)Placed Riprap, Class 4, method A100CY$_______$___________
251(16)Geotextile, Type IV-C170SY$_______$___________
301(01)Aggregate Base, grading C, Compaction D150Ton$_______$___________
403(01)Hot asphalt concrete pavement class C, grading B100Ton$_______$___________
552(01)Structural Concrete Class A (AE) includes forms, falsework.65CY$_______$___________
554(01)Reinforcing Steel, Includes installation8800LB$_______$___________
603(02)20' Span, 10' Rise, Structural Plate Pipe Arch, 10 gauge Thick72LF$_______$___________
635(01)Temporary Traffic Control (Both Sites)1LS$_______$___________
648(02)APlaced Channel Rock, Rock 3 (36" Dia.), method A112EA$_______$___________
648(04)Placed Streambed simulation rock, bed class 8, method A288CY$_______$___________
TOTAL$___________
Optional Item
202(01)Additional Clearing and Grubbing (Tree Removal)4EA$_______$___________

&R&12Solicitation No. AG-9S40-S-16-0004 Duff Creek Aquatic Organism Passage Amendment No. Two