Attachment_6_PAL_Variance_Data.pdf

PDF 78 KB Posted

Attached to
Lake Isabella Boarding Floats Replacement Project Federal contract opportunity
Solicitation number
AG-9A23-S-13-0039
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Attachment 6 Pal Variance Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Lake Isabella Boarding Floats Replacement Project, newest first.
File Type Posted
Amend_1_to_AG-0039.pdf PDF
Attachment_3_02500_Boarding_Floats_and_Gangplanks.pdf PDF
Attachment_7_Wage_Determination.pdf PDF
RFP_AG-9A23-S-13-0039_LI_Boarding_Floats.pdf PDF
Attachment_8_Bid_Bond_SF-24.pdf PDF
Attachment_5_Fire_Plan.pdf PDF
Attachment_4_Project_Drawings.pdf PDF
Attachment_2_02100_Demolition.pdf PDF
Attachment_1_01301_Mobilization.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement

Project Name: __________________________________________

Contract Number: _______________________________________

Contractor Name: _______________________________

Request #__, for period: __________________________________

Units/Subdivisions Affected: _______________________________

Location of operation:

Slope

Aspect

Elevation

Fuels on site

Fuels in surrounding area

7 Day PAL Outlook

Short range predictions (Red

Flags)

Fuel Moistures

Response time of suppression resources

Potential for ignition

RAWS location

Current Fire Situation:

Draw down information

National Readiness Level

Contractual considerations:

Normal Operating Season

Frequency of recent contract fires in area

Type of operation

Contractors past/current performance & equipment readiness

Other site specific mitigation or precaution (i.e. Contractors proposals)

Social & Community Considerations:

Proximity of high value resources

Sensitivity of location

Proposed Actions:

Description of Mitigation Measures:

Remarks:

Fire Management Officer Concurrence

Date

Line Officer Approval Date

I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project

Activity Level Ev. Unless extended, the approval remains in effect for ten

(10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest

Service, this variance can be modified and/or cancelled at no cost to the government.

Contracting Officer Date

Contractor Representative Date