Attachment_6_PAL_Variance_Data.pdf
PDF 78 KB Posted
- Attached to
- Lake Isabella Boarding Floats Replacement Project Federal contract opportunity
- Solicitation number
- AG-9A23-S-13-0039
About this file
Attachment 6 Pal Variance Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_1_to_AG-0039.pdf | ||
| Attachment_3_02500_Boarding_Floats_and_Gangplanks.pdf | ||
| Attachment_7_Wage_Determination.pdf | ||
| RFP_AG-9A23-S-13-0039_LI_Boarding_Floats.pdf | ||
| Attachment_8_Bid_Bond_SF-24.pdf | ||
| Attachment_5_Fire_Plan.pdf | ||
| Attachment_4_Project_Drawings.pdf | ||
| Attachment_2_02100_Demolition.pdf | ||
| Attachment_1_01301_Mobilization.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement
Project Name: __________________________________________
Contract Number: _______________________________________
Contractor Name: _______________________________
Request #__, for period: __________________________________
Units/Subdivisions Affected: _______________________________
Location of operation:
Slope
Aspect
Elevation
Fuels on site
Fuels in surrounding area
7 Day PAL Outlook
Short range predictions (Red
Flags)
Fuel Moistures
Response time of suppression resources
Potential for ignition
RAWS location
Current Fire Situation:
Draw down information
National Readiness Level
Contractual considerations:
Normal Operating Season
Frequency of recent contract fires in area
Type of operation
Contractors past/current performance & equipment readiness
Other site specific mitigation or precaution (i.e. Contractors proposals)
Social & Community Considerations:
Proximity of high value resources
Sensitivity of location
Proposed Actions:
Description of Mitigation Measures:
Remarks:
Fire Management Officer Concurrence
Date
Line Officer Approval Date
I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project
Activity Level Ev. Unless extended, the approval remains in effect for ten
(10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest
Service, this variance can be modified and/or cancelled at no cost to the government.
Contracting Officer Date
Contractor Representative Date
File details come from the government source that posted it. Updated .