S-10-0308 Attachment 1 Schedule of Items - Revised.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
RECOVERY-Columbine Deferred Maintenance - Coronado National Forest
Solicitation number
AG-9702-S-10-0308
Issued by

About this file

S-10-0308 Attachment 1 Schedule of Items - Revised.xlsx

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Civil

Schedule of Items
Columbine Deferred Maintenance, Accessibility, and Electrical Upgrades
Pay
ItemDescriptionMethod of
MeasurementEst.
QuantityPay
UnitUnit
PriceTotal
1Mobilization & BondingLSQ1LS
2TestingLSQ1LS
Visitor's Center Parking
3Clearing and GrubbingLSQ1LS
4GradingLSQ1HR
52" Asphalt Over 4" ABCAQ70SY
6Demolish Existing Concrete Curb and SidewalkLSQ1LS
7Construct New Concrete Curb and GutterAQ100LF
8Construct New Concrete Sidewalk and ADA RampAQ70SY
9Stripe and Sign Existing Parking Lot and New ADA ParkingLSQ1LS
Visitor's Center
10Replace Existing Gas Furnace and Water HeaterLSQ1LS
11Repair Roof Leak and Damaged CeilingLSQ1LS
12Replace Back Porch and StepsLSQ1LS
13Replace Water PlumbingLSQ1LS
14Replace Kitchen FlooringAQ150SF
Vualt Toilet
15Demolish Existing OuthouseLSQ1LS
16Supply and Construct New Romtec Single Vault ToiletLSQ1LS
Shower Building
17Demolish Existing Interior Walls, Floors, and UtilitiesLSQ1LS
18Install New Water and Sewer PlumbingLSQ1LS
19Construct New Concrete FloorAQ25SY
20Construct New Interior and Furr-Out WallsAQ1LS
21Install New Showers, Toilets, and SinksLSQ1LS
22Install Wall Board and Sheet Rock and FinishLSQ1LS
23Install New Electrical Facilities and Light FixturesLSQ1LS
Cabin 1
24Replace Existing FlooringAQ235SF
Cabin 2 & Cabin 3
25Replace Existing FlooringAQ725SF
26Replace Electrical Wiring, Receptacles, and FixturesLSQ1LS
27Insulate Walls and CeilingsAQ2000SF
28Replace Interior PlumbingLSQ1LS
29Overlay Exterior SidingAQ1325SF
30Replace interior sheetrock, tape, texture, paintAQ2050SF
Warehouse
31Replace All Electrical FacilitiesLSQ1LS
Total
Designated Method of Measurement:
DQ - designated quantities; AQ - actual quantities; LSQ - lump sum quantities
NOTE: Required work shown on the drawings and described in the specifications and not listed on this
Schedule of Items shall be considered incidental to other pay items.

&8T:\Proj14\85001302\schedule of terms.xls

File details come from the government source that posted it. Updated .