FAQs.docx
DOCX document 11 KB Posted
- Solicitation number
- AG-9702-S-10-0149
About this file
FAQs for Thinning Project Q Will there be a pre-bid meeting A No Q Is bonding required A A bid bond is not required but if you are awarded the contract 100 performance and payment bonds will be required Q Is response by mail only A No. Fedbizopps response is preferred followed by Email (as an attachment) and then fax or mail if for some reason you can't use the first two methods Q How can we view the roads A Via Google Earth. Gates are locked at most locations due to weather conditions Q .
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAQs2.docx | DOCX document | |
| SF 1449(3_2005).pdf | ||
| Section C.rtf | RTF text file | |
| Sch of Items.xls | XLS spreadsheet | |
| DRAWINGS.pdf | ||
| Loc-Map Ojai.pdf | ||
| Fire Plan.doc | DOC document | |
| Loc-Map MRD.pdf | ||
| Vicinity Map.pdf | ||
| 842 Logging Out.doc | DOC document | |
| Loc-Map MPRD.pdf | ||
| AG-9702-S-10-0149-Clauses.rtf | RTF text file | |
| Section-J.xls | XLS spreadsheet | |
| Section H.rtf | RTF text file | |
| Loc-Map SBRD.pdf | ||
| 841 Brush Cutting.doc | DOC document | |
| 601 Mobilization.doc | DOC document | |
| Loc-Map SLRD.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: Will there be a pre-bid meeting?
A: No
Q: Is bonding required?
A: A bid bond is not required but if you are awarded the contract 100% performance and payment bonds will be required
Q: Is response by mail only?
A: No. Fedbizopps response is preferred, followed by Email (as an attachment) and then fax or mail if for some reason you can't use the first two methods
Q: How can we view the roads?
A: Via Google Earth. Gates are locked at most locations due to weather conditions
Q: Will the response date be revised?
A: Yes, new response date and time, 2/5/10 at 2 pm
Q: Are there contacts at each of the counties who we can talk to?
A: No. Main contact person is Katherine Worn at 805-961-5709
Q: Is there a need for helicopter use?
A: No
Q: What is different about the clauses for this project?
A: This is a Recovery (ARRA) Project and clauses 52.203-15 and 52.204-11 apply which involve whistleblower protections and special mandatory reporting requirements. You can go to federalreporting.gov for more information on reporting
Q: On the schedule of items there is a line that says, "Logging Out, Slash Treatment A" 3 each. What does this mean?
A: This refers to the number of loads which may have to be hauled to a disposal site. We expect no more than 3 loads and in many cases we expect that no loads will have to be hauled.
Q: I have a tracked hydraulic masticator with a 25-foot reach; can I get it onto all the roads?
A: No. See Spec 841-1, you cannot use tracked equipment, "with either rubber tires, rubber tracked or street pads."
Q: What is the diameter limit for trees to be cut?
A: Trees that are greater than 6-inches in diameter will be marked by the inspector if they are to be removed.
File details come from the government source that posted it. Updated .