601 Mobilization.doc
DOC document 22 KB Posted
- Solicitation number
- AG-9702-S-10-0149
About this file
Mobilization
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAQs2.docx | DOCX document | |
| FAQs.docx | DOCX document | |
| SF 1449(3_2005).pdf | ||
| Section C.rtf | RTF text file | |
| Sch of Items.xls | XLS spreadsheet | |
| DRAWINGS.pdf | ||
| Loc-Map Ojai.pdf | ||
| Fire Plan.doc | DOC document | |
| Loc-Map MRD.pdf | ||
| Vicinity Map.pdf | ||
| 842 Logging Out.doc | DOC document | |
| Loc-Map MPRD.pdf | ||
| AG-9702-S-10-0149-Clauses.rtf | RTF text file | |
| Section-J.xls | XLS spreadsheet | |
| Section H.rtf | RTF text file | |
| Loc-Map SBRD.pdf | ||
| 841 Brush Cutting.doc | DOC document | |
| Loc-Map SLRD.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROJECT SPECIFICATION
SECTION 601 – MOBILIZATION
DESCRIPTION
601.01A WORK. This work consists of moving personnel, equipment, materials, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the obtaining of permits, insurance, and bonds.
MEASUREMENT
601.02A METHOD. Mobilization will be measured by the Lump Sum.
PAYMENT
601.03A BASIS. The accepted quantity, measured as provided above, will be paid at the contract price per unit of measurement for the pay item listed below that is shown in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
The mobilization lump sum will be paid as follows:
(a) Bond premiums will be reimbursed after receipt of the evidence of payment.
(b) 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
(c) Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
(d) Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
Payment will be made under:
Pay Item
601 (01) Mobilization ………………………………………………Lump Sum
(includes bonding cost)
R5
601-1 9/93