842 Logging Out.doc

DOC document 23 KB Posted

Attached to
RECOVERY: Los Padres Road and Hazardous Fuels Clearing
Solicitation number
AG-9702-S-10-0149
Issued by

About this file

Logging Out

View the file

Other files

File Type Posted
FAQs2.docx DOCX document
FAQs.docx DOCX document
SF 1449(3_2005).pdf PDF
Section C.rtf RTF text file
Sch of Items.xls XLS spreadsheet
DRAWINGS.pdf PDF
Loc-Map Ojai.pdf PDF
Fire Plan.doc DOC document
Loc-Map MRD.pdf PDF
Vicinity Map.pdf PDF
Loc-Map MPRD.pdf PDF
AG-9702-S-10-0149-Clauses.rtf RTF text file
Section-J.xls XLS spreadsheet
Section H.rtf RTF text file
Loc-Map SBRD.pdf PDF
841 Brush Cutting.doc DOC document
601 Mobilization.doc DOC document
Loc-Map SLRD.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 842 – LOGGING OUT

DESCRIPTION

842.01 This work consists of removing vegetative material which has fallen into the logging out limits, top of cut and 4 feet minimum from the edge of the road.

REQUIREMENTS

842.02. Removal

Cut all logs and branches of fallen trees that extend across or into the roadway as MARKED ON THE GROUND.

Remove all vegetative material greater than 3 inches in diameter or 3 feet in length that has fallen into the roadway. Roots and stumps from trees within the roadway that have been uprooted shall be removed.

842.03 Disposal

All parts of down trees and other materials removed by logging out operations shall be disposed of by the slash treatment method SHOWN ON THE SCHEDULE OF ITEMS and in accordance with the following;

Method A – Scattering – Slash shall be scattered outside the clearing limits without developing slash concentrations.

Method B – Piling – Slash shall be piled so as not to interfere with traffic and so that burning does not damage standing trees. The Contractor will not be required to burn the piles.

Method C – Chipping – Slash up to at least 4 inches in diameter shall be processed through a chipping machine. Chips shall be deposited on embankment slopes or outside the roadway to a loose depth not exceeding 4 inches. Minor amounts of chips may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.

Method D – Load and Haul to Disposal Site – Slash shall be loaded and hauled to a disposal site. The location and any special operating procedures for the disposal sites will be SHOWN ON THE DRAWINGS.

Logs larger than 4 inches in diameter by 8 feet long shall be decked at locations adjacent to the roadway as shown by the Contracting Officer.

METHOD OF MEASUREMENT

842.04

The quantity of logging out units will be determined by measuring the distance along the slope of the road centerline to the nearest one-tenth mile or by actual count of each tree designated by the Contracting Officer for removal.

BASIS OF PAYMENT

842.05 payment will be made, for all units inspected and accepted, at the unit price SHOWN ON THE SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item

Pay Unit

842(01) Logging Out Slash Treatment Method . . . . . . . . . . . Mile

842(02) Logging Out Slash Treatment Method . . . . . . . . . . . Each

842-1 (01/01) R05F12