Attachment 3_02222_Trench.doc
DOC document 29 KB Posted
- Attached to
- RECOVERY: Remove and Replace Water Distribution System Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0045
About this file
Attachment 3 Trench
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7_120507_Fire Plan.doc | DOC document | |
| Attachment 2_02052_Demolition.doc | DOC document | |
| Attachment 9_Trench Detail.pdf | ||
| Attachment 6_02675_Disinfection.doc | DOC document | |
| Attachment 10_Wage Determination CA33.pdf | ||
| Attachment 4_02640_Valves.doc | DOC document | |
| Attachment 5_02660_Water Distribution.doc | DOC document | |
| AG-9702-S-10-0045 RFQ.doc | DOC document | |
| Attachment 1_01300_Submittals.doc | DOC document | |
| Attachment 8_Project Location Map.jpg | JPG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02222
EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
PART 1 GENERAL
1.01 SCOPE
This work consists of trench excavation, backfilling and compaction for utilities.
PART 2 PRODUCTS
2.01
BEDDING MATERIAL
A. Sand shall be clean free flowing granular material, free of vegetative matter with 100 percent finer than the No. 4 sieve, and with no more than six percent passing the No. 200 sieve.
B. Clean naturally rounded aggregate with a mix of particle sizes not less than 1/8 inch or greater than 1/2 inches. This material is commonly called pea gravel.
PART 3 EXECUTION
3.01
GENERAL
Trenching shall be performed to the lines, grades, and dimensions SHOWN ON THE DRAWINGS to provide the minimum required cover and separation between lines. Excavation shall be considered unclassified regardless of material encountered.
3.02
EXISTING UTILITIES
Prior to beginning trenching, the Contractor shall locate all existing underground utilities intersecting or parallel to the trench. Existing utilities shall be located by means of an electronic pipe and cable locator and the location identified by spray painting the ground surface.
3.03
RESPONSIBILITY FOR UTILITIES
Any existing underground utilities identified on the plans or identified by the Contractor, as required above, shall be repaired or replaced at no additional cost to the Government if damaged.
3.04
SAW CUTTING
Before trenching through concrete, asphalt concrete, chip sealed or oiled areas, the edges of all trenches shall be saw cut to sharp clean vertical edges.
3.05
EXCAVATED MATERIAL
Trench excavation shall be placed in a neat pile adjacent to the trench a sufficient distance to prevent cave‑ins. Spoils pile shall not obstruct traffic. Excess excavation or excavation not suitable for backfill shall be hauled off Government land.
3.06
BEDDING
All pipes shall be bedded in sand AS SHOWN ON THE DRAWINGS.
3.07
BACKFILL
Native material may be used as backfill As SHOWN ON THE DRAWINGS provided it contains no rocks larger than 6 Inches In greatest dimension. Native backfill shall be compacted In 12 inch loose measure lifts to 90 percent of AASHTO T‑180 Method C, except in paved areas where backfill shall be compacted to 95 percent of AASHTO T‑180 Method C and placed in 6 inch lifts.
3.08 CONCRETE (if applicable) Concrete shall be replaced when trenching through concrete walkways. Concrete shall conform to the requirements of Section 03300.
3.09
SAFETY
A. Trenches shall be sloped or shored as required by the California State Division of Safety and Health.
B.
Contractor shall erect barriers around trench excavations to prevent accidents. Lights shall be placed from sunset to sunrise of the next day until excavation is entirely backfilled.
END OF SECTION
WATER DISTRIBUTION
DIVISION 2 02222-1
REPLACEMENT
ANGELES NATIONAL FOREST