Attachment 1_01300_Submittals.doc

DOC document 28 KB Posted

Attached to
RECOVERY: Remove and Replace Water Distribution System Federal contract opportunity
Solicitation number
AG-9702-S-10-0045
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 1 Submittals

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Remove and Replace Water Distribution System, newest first.
File Type Posted
Attachment 8_Project Location Map.jpg JPG image
Attachment 9_Trench Detail.pdf PDF
Attachment 3_02222_Trench.doc DOC document
Attachment 6_02675_Disinfection.doc DOC document
Attachment 7_120507_Fire Plan.doc DOC document
Attachment 2_02052_Demolition.doc DOC document
Attachment 10_Wage Determination CA33.pdf PDF
Attachment 4_02640_Valves.doc DOC document
Attachment 5_02660_Water Distribution.doc DOC document
AG-9702-S-10-0045 RFQ.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01300

SHOP DRAWINGS AND SUBMITTALS

PART 1 ‑ GENERAL

1.01

SCOPE:

A.

Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following:

1.

Shop Drawings

2.

Samples

3.

Catalog Data

1.02

SUBMITTALS

A.

Submittals shall include all pertinent data required to understand the quality of components, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.

B.

Part of the submittal process will be the submission of a submittal checklist in which the contractor will outline the individual submittals required by these specifications, arranged by CSI divisions. In addition any proposed substitutions will require a submittal(s) which will include all pertinent information necessary to determine if the proposal is equal or better to the original design.

PART 2 ‑ PRODUCTS

Not Applicable

PART 3 ‑ EXECUTION

3.01

SUBMITTALS

A.

Submittals and shop drawings shall be submitted in a timely fashion to allow 21 days for review by the Government. "No work shall begin until shops drawings and submittals are approved".

3.02

SHOP DRAWINGS

A.

Original Submittal: A reproducible submittal and three copies of all shop drawings shall be submitted for approval as required under 3.1 above prior to fabrication, installation or order placement to allow for checking and coordination. The reproducible will be retained by the Contracting Officer.

B.

Resubmittal: When a resubmittal is required, one print so indicating will be returned to the Contractor. After revision of the original, a new reproducible submittal and three copies shall be submitted for approval.

C.

Approval: Once approved, stamped documents shall be returned to the Contractor and shall be complied with as noted. Variation from the approved documents shall be likewise submitted and approved before being carried out.

3.03

SAMPLES

A.

Original Submittal: Two samples of each item for which samples are required, unless otherwise specified, shall be furnished for approval. Approval shall be obtained prior to delivery of the material to the project site. These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture and finish as they will appear in the completed installation.

B.

Resubmittals: All rejected samples will be returned upon request and any or all resubmittals required shall consist of two new samples.

C.

Approval: Upon approval, one sample so noted will be returned and the remainder will be retained by the Contracting Officer until completion of the work. When requested, all approved samples will be returned for installation providing identity is maintained in an approved manner until final acceptance of the project.

3.04

CATALOG DATA

A.

Submittals: Four copies of catalog data are required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. One copy will be returned unless additional copies are requested.

B.

Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.

3.05

IDENTIFICATION

A.

Catalog Data: Each separate catalog brochure or page submitted shall have the identification shown. Catalog of brochures submitted containing multiple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.

B.

In the event one or more of the multiple items are not approved in any submittal, the additional copies required will not be requested until all items are approved.

END OF SECTION

WATER DISTRIBUTION

DIVISION 1

01300‑

REPLACEMENT

ANGELES NATIONAL FOREST

File details come from the government source that posted it. Updated .