Section_303_road_reconditioning_new.doc
DOC document 26 KB Posted
- Solicitation number
- AG-83A7-S-10-0006
About this file
Attachment - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30.pdf | ||
| Section_154_contractor_sampling_and_testing_new.doc | DOC document | |
| Canjilon_Creek_Restoration 2.pdf | ||
| Gen Dec Num NM100002 3-12-10.docx | DOCX document | |
| Section_211_Roadway_Obliteration.rtf | RTF text file | |
| Section_106_Acceptance_of_Work.doc | DOC document | |
| Section_635_Temporary_Traffic_Control.doc | DOC document | |
| Section_725_miscellaneous_materials_new.doc | DOC document | |
| Section_151_mobilization_new.doc | DOC document | |
| Section_705_Rock.docx | DOCX document | |
| CONSTRUCTION rfq FR559.docx | DOCX document | |
| Canjilon_Creek_Restoration.pdf | ||
| Section_710_Fence_and_Guardrail.rtf | RTF text file | |
| Canjilon_Creek_Restoration_title_sheet Layout1 | — | |
| Section_703_Aggregate.doc | DOC document | |
| Section_301_untreated_aggregate_courses_new.doc | DOC document | |
| Section_109_Measurement_and_Payment.doc | DOC document | |
| response package.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 303 — ROAD RECONDITIONING
Description
303.01 This work consists of reconditioning ditches, shoulders, roadbeds, and aggregate surfaces.
Material
303.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade. Dispose of waste according to Subsection 204.14.
303.04 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection 204.07. Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Reshape shoulders and dispose of waste according to Subsection 204.14.
303.05 Roadbed Reconditioning. Repair soft and unstable areas according to Subsection 204.07. Remove all organic, deleterious, or oversize material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste according to Subsection 204.14. Scarify to a 6-inch depth, remove surface irregularities, and shape to provide a uniform surface. Finish earth surfaces to within 0.05 feet and rock surfaces to within 0.10 feet of the required line, cross-section, and grade. Compact according to Subsection 204.11.
303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full depth of the aggregate surface and according to Subsection 204.07. Scarify to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface according to Section 308.
303.07 Roadway Reconditioning. Perform all the applicable work described in Subsections 303.03 through 303.06.
303.08 Pulverizing. Scarify the surface to the designated depth and width. Pulverize all material to a size one and one half times the maximum sized aggregate or to 1½ inches, whichever is greater. Mix, spread, compact, and finish the material according to Section 301.
303.09 Acceptance. See Table 303-1 for sampling and testing requirements. Road reconditioning work will be evaluated under Subsections 106.02 and 106.04.
Measurement
303.10 Measure the Section 303 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure ditch reconditioning and shoulder reconditioning by the station or foot horizontally along the centerline of the roadway for each side of the roadway.
Measure roadbed reconditioning, aggregate surface reconditioning, roadway reconditioning, and pulverizing by the station or by the square yard. Measure the square yard area on a horizontal plane. Do not measure isolated areas less than 20 square yards.
Measure waste under Section 204.
Payment
303.11 The accepted quantities will be paid at the contract price per unit of measurement for the Section 303(01) pay items listed in the bid schedule.