Section_154_contractor_sampling_and_testing_new.doc
DOC document 24 KB Posted
- Solicitation number
- AG-83A7-S-10-0006
About this file
Attachment - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30.pdf | ||
| Canjilon_Creek_Restoration 2.pdf | ||
| Gen Dec Num NM100002 3-12-10.docx | DOCX document | |
| Section_211_Roadway_Obliteration.rtf | RTF text file | |
| Section_106_Acceptance_of_Work.doc | DOC document | |
| Section_635_Temporary_Traffic_Control.doc | DOC document | |
| Section_725_miscellaneous_materials_new.doc | DOC document | |
| Section_151_mobilization_new.doc | DOC document | |
| Section_705_Rock.docx | DOCX document | |
| CONSTRUCTION rfq FR559.docx | DOCX document | |
| Canjilon_Creek_Restoration.pdf | ||
| Section_710_Fence_and_Guardrail.rtf | RTF text file | |
| Section_303_road_reconditioning_new.doc | DOC document | |
| Canjilon_Creek_Restoration_title_sheet Layout1 | — | |
| Section_703_Aggregate.doc | DOC document | |
| Section_301_untreated_aggregate_courses_new.doc | DOC document | |
| Section_109_Measurement_and_Payment.doc | DOC document | |
| response package.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 154. — CONTRACTOR SAMPLING AND TESTING
Description
154.01 This work consists of obtaining samples for testing and conducting the appropriate tests as outlined in the specifications and shown on the drawings.
Construction Requirements
154.02 Sampling. Sample material to be tested according to the Sampling and Testing Requirements tables included at the end of each section. The sampling schedules and times will be provided by the CO using a random number system. In addition, sample any material that appears defective or inconsistent with similar material being produced unless such material is voluntarily removed and replaced or corrected.
Sample and split samples according to AASHTO or other acceptable procedures. Allow the CO the opportunity to witness all sampling. Immediately perform splits when required. Deliver the Government’s portion of the sample or split sample in an acceptable container suitable for shipment. Label all samples with the following information:
(a) Project number;
(b) Source of material;
(c) Pay item number;
(d) Sample number;
(e) Date sampled;
(f) Time sampled;
(g) Location sample taken;
(h) Name of person sampling;
(i) Name of person witnessing sampling; and
(j) Type of test required on sample.
154.03 Testing. Contractor perform all tests required by the Sampling and Testing Requirements tables at the end of each section. Allow the CO the opportunity to witness all testing. Testing of trial samples may be required to demonstrate testing competence.
154.04 Records. Report test results on forms containing all sample information required by Subsection 154.02. Label clearly all interim measurements used to determine the results. Attach work sheets used to determine test values to the test result forms when submitted. When tests are on material being incorporated in the work, report test results within 24 hours except as specified in the Sampling and Testing Requirements tables. Payment for work may be delayed or the work suspended until test results are provided.
154.05 Acceptance. Contractor sampling and testing will be evaluated under Subsections 106.02 and 106.04 based on Government verification testing.
Measurement
154.06 Measure the Section 154 items listed in the bid schedule according to Subsection 109.02.
Payment
154.07 Payment shall be subsidized under Section 301 – Untreated Aggregate Courses - 301(01)