Attachment J4 Wage Determination CO14_dvb.mht

MHT file 13 KB Posted

Attached to
IDIQ Roads Related Work Construction/Reconstruction Project Federal contract opportunity
Solicitation number
AG-82X9-S-11-0062
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Attachment J4 Wage Determination CO14

Text of this file

From: <Saved by Windows Internet Explorer 8> Subject:

Date: Thu, 10 Mar 2011 14:09:16 -0700 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/CO14.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5931

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.19019"></HEAD> <BODY><PRE>General Decision Number: CO100014 10/08/2010 CO14

Superseded General Decision Number: CO20080014

State: Colorado

Construction Type: Highway

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010 1 05/07/2010 2 06/04/2010 3 08/06/2010 4 10/08/2010

ELEC0012-005 06/01/2009

PUEBLO COUNTY

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation) Electrical work where the total cost is $150,000 or less........................$ 22.85 10.79 Electrical work where the total cost is over $150,000.$ 27.00 10.91

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada &amp; Bijou Denver - Ellsworth Avenue &amp; Broadway Ft. Collins - Prospect &amp; College Grand Junction - 12th &amp; North Avenue Pueblo - I-25 &amp; Highway 50 All work outside of these areas shall be paid Zone 2 rates.

* ELEC0068-012 06/01/2010

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON, LARIMER AND WELD COUNTIES

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation).....$ 31.60 12.32

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada &amp; Bijou Denver - Ellsworth Avenue &amp; Broadway Ft. Collins - Prospect &amp; College Grand Junction - 12th &amp; North Avenue Pueblo - I-25 &amp; Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ELEC0113-005 06/01/2009

EL PASO COUNTY

Rates Fringes

ELECTRICIAN......................$ 28.80 3%+13.10

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada &amp; Bijou

Denver - Ellsworth Avenue &amp; Broadway

Ft. Collins - Prospect &amp; College

Grand Junction - 12th &amp; North Avenue

Pueblo - I-25 &amp; Highway 50

All work outside of these areas shall be paid Zone 2 rates.

ELEC0969-005 06/01/2009

MESA COUNTY

Rates Fringes

ELECTRICIAN (Excluding traffic signal installation).....$ 20.31 8.92

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75

TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS

Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:

Colorado Springs - Nevada &amp; Bijou Denver - Ellsworth Avenue &amp; Broadway Ft. Collins - Prospect &amp; College Grand Junction - 12th &amp; North Avenue Pueblo - I-25 &amp; Highway 50 All work outside of these areas shall be paid Zone 2 rates.

ENGI0009-002 05/01/2010

Rates Fringes

Power equipment operators:

Asphalt Screed..............$ 23.67 9.22 Bituminous or Asphalt Spreader/Laydown Machine....$ 23.67 9.22 Bulldozer...................$ 23.67 9.22 Crane: 50 tons and under...$ 23.82 9.22 Crane: 51 to 90 tons.......$ 23.97 9.22 Crane: 91 to 140 tons......$ 24.12 9.22 Crane: 141 tons and over....$ 24.88 9.22 Drill Operator: William MF/Watson 2500 only.........$ 23.97 9.22 Grader/Blade: Finish........$ 23.97 9.22 Grader/Blade: Rough.........$ 23.67 9.22 Loader: Barber Green, etc.

&amp; Up to and including 6 cubic yards.................$ 23.67 9.22 Loader: Mechanic/Welder (heavy duty)................$ 23.97 9.22 Loader: Over 6 cubic yards..$ 23.82 9.22 Mechanic and/or Welder (Includes heavy duty &amp;

combination mechanic and welder):....................$ 26.12 9.22 Oiler.......................$ 22.97 9.22 Power Broom: 70 HP and over.$ 23.67 9.22 Power Broom: Under 70 HP....$ 22.97 9.22 Roller (excluding dirt &amp;

soil compaction): Self-propelled, all types over 5 tons......................$ 23.67 9.22 Roller (excluding dirt &amp;

soil compaction): Self-propelled, rubber tires under 5 tons................$ 23.32 9.22 Scraper: Single bowl including pups 40 cubic yards and tandem bowls and over........................$ 23.97 9.22 Scraper: Single bowl under 40 cubic yards..............$ 23.82 9.22 Trackhoe....................$ 23.82 9.22

LABO0086-002 05/01/2009

Rates Fringes

Laborers:

Asphalt Laborer/Raker, Common Laborer &amp; Concrete Laborer/Mason Tender........$ 18.68 6.78

SUCO2001-003 12/20/2001

Rates Fringes

BRICKLAYER.......................$ 15.55 2.85

Carpenters:

Form Work (Excluding Curbs &amp; Gutters).................$ 16.54 3.90 All Other Work..............$ 16.61 3.88

Concrete Finisher/Cement Mason...$ 16.05 3.00

Ironworkers:

Bridge Rail (Excludes Guardrail)..................$ 18.22 6.01 Reinforcing.................$ 16.69 5.45

Laborers:

Fence Erector (Includes fencing on bridges).........$ 13.02 3.20 Form Work (Curbs &amp;

Gutters only)...............$ 11.85 3.45 Guardrail Erector (Excludes bridgerail)......$ 12.89 3.20 Landscape and Irrigation Laborer.....................$ 12.26 3.16 Pipelayer...................$ 13.55 2.41 Striping Laborer (Pre-form layout and removal of pavement markings)..........$ 12.62 3.21 Traffic and Sign Laborer (Sets up barricades and cones, and installs permanent signs)............$ 12.43 3.22 Traffic Director/Flagger....$ 9.55 3.05

Painters:

Brush.......................$ 16.94 2.10 Spray.......................$ 16.99 2.87

Power equipment operators:

Backhoes....................$ 16.54 4.24 Bobcat/Skid Loader..........$ 15.37 4.28 Compactor - Dirt &amp; Soil Only........................$ 16.70 3.30 Concrete Pump Operator......$ 16.52 4.30 Drill Operator: All except William MF/ Watson 2500.....$ 16.74 2.66 Forklift....................$ 15.91 4.09 Post Driver/Punch Machine...$ 16.07 4.41 Rotomill Operator...........$ 16.22 4.41 Tractor.....................$ 13.13 2.95

TRAFFIC SIGNALIZATION:

Traffic Signal Installation Groundman Class C....................$ 11.44 3.25

Truck drivers:

Floats-Semi Truck...........$ 14.86 3.08 Multipurpose Truck- Specialty &amp; Hoisting........$ 14.35 3.49 Pickup Truck (Includes Pilot and Sign/Barricade Truck)......................$ 13.93 3.68 Single Axle Truck...........$ 14.24 3.77 Truck Mechanic..............$ 16.91 3.01

TEAM0435-002 05/01/2000

Rates Fringes

Truck drivers:

Distributor Truck...........$ 15.80 5.27 Dump Truck: Over 14 cubic yards to and including 29 cubic yards.................$ 15.27 5.27 Dump Truck: Over 29 cubic yards to and including 79 cubic yards.................$ 15.80 5.27 Dump Truck: Over 79 cubic yards.......................$ 16.45 5.27 Dump Truck: To and including 6 cubic yards &amp;

over 6 cubic yards to and including 14 cubic yards;

Water Truck.................$ 14.93 5.27 Low Boy Truck...............$ 17.25 5.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

Other files for this federal contract opportunity

Other files attached to IDIQ Roads Related Work Construction/Reconstruction Project, newest first.
File Type Posted
Amend 1.PDF PDF
Attachment 9 Sample Invoice.doc DOC document
Revised Schedule of Items.doc DOC document
Attachment 8 Definitions.docx DOCX document
Sign In Sheet 050411.PDF PDF
Sign In Sheet 051111PDF.PDF PDF
Attachment J6 Wage Determination WY8_dvb.mht MHT file
Attachment J7 SampleTaskOrder.docx DOCX document
Attachment J2 Contract Drawings.pdf PDF
Attachment J5 Wage Determination WY7_dvb.mht MHT file
Attachment J1lSpecsEditedVersion.doc DOC document
AG82X9S110062.PDF PDF
Attachment J3 Vicinity Map.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .