ARNF Draft Task Order-LoneTree

View the file

Other files for this federal contract opportunity

Other files attached to Front Range Long Term Stewardship Contract, newest first.
File Type Posted
Stand Data for Long John Task Order.doc DOC document
AR_Stand_Data_Tables09.doc DOC document
attachment1.pdf PDF
amendment1_questions_answers_Bob_edits.doc DOC document
FRLTSC_road_maintenance_level_and_temp_road_milage_11042008.xls XLS spreadsheet
crystal4_taskorder.pdf PDF
task_order_manual_james_creek.doc DOC document
task_order_trout_creek.doc DOC document
jamesck_manual_taskorder_page2.pdf PDF
jamescrk_mechanical_taskorder.pdf PDF
lonetree_taskorder.pdf PDF
task_order_lontree_10312007.doc DOC document
task_order_crystal_4.doc DOC document
task_order_long_john_09292008_fy09.doc DOC document
task_order_ridgewood_2_10142008_fy09.doc DOC document
task_order_girl_scout_09292008_fy09.doc DOC document
task_order_harris_park_10142008_fy09.doc DOC document
ar_general_LTSC HANDOUT10_06_08.doc DOC document
LTSC HANDOUT.doc DOC document
304-02_Rock_Crossing.pdf PDF
lonetree_contract_map103107.pdf PDF
task_order_trout_creek.doc DOC document
jamesck1_contract_map110707.pdf PDF
task_order_manual_james_creek.doc DOC document
task_order_crystal_4.doc DOC document
task_order_harris_park_09182008_fy09.doc DOC document
task_order_girl_scout_09182008_fy09.doc DOC document
task_order_ridgewood_2_09182008_fy09.doc DOC document
ridgewood_2_task_order_final_09252009.pdf PDF
harris_park_task_order_final_09252009.pdf PDF
task_order_long_john_09182008_fy09.doc DOC document
long_john_task_order_final_09252009.pdf PDF
howard_2_task_order_final_09252009.pdf PDF
frltsc_solicitation_final.pdf PDF
Recontouring.pdf PDF
Road Maintenance_T_814 - Drainage Excavation.pdf PDF
temp rd drainage structure.pdf PDF
Road Maintenance_T_803 - Typical Surface Blading Section.pdf PDF
appendix_j_arnf_final.pdf PDF
appendix_f_map2.pdf PDF
temp rd construction.pdf PDF
appendix_d_final.pdf PDF
appendix_B_final.pdf PDF
Road Maintenance_T_815_ Culvert Installation_2.pdf PDF
Road Maintenance_T_814- Leadoff Ditch.pdf PDF
appendix_A_final.pdf PDF
appendix_h.doc DOC document
Road Maintenance_T_815- Culvert Installation Details.pdf PDF
appendix_g.doc DOC document
appendix_c_final.pdf PDF
Show all 50

Front Range Long Term Stewardship Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRLT STEWARDSHIP PROJECT

Lone Tree DRAFT TASK ORDER

DELIVERY ORDER NUMBER:__XXXXXXXXX__

Date of Request /Order:_ XXXXXXXX___________________ Master Contract Number: _XXXXXXXX_____________________

Ranger District: ____Canyon Lakes Ranger District___________________________ Contractor: ______XXXXXXXXXXX________________________________

PERIOD OF PERFORMANCE: __XXX_Calendar Days.

Notice To Proceed will be issued on or about:___XXXXXXXXXX__ PERFORMANCE DATA: (See attached supporting documents for selection of treatment to be performed and all requirements.)

Project Specifications and Project Area Map provided separately PLACE OF DELIVERY OR PERFORMANCE (Where will the Contractor begin work):

Canyon Lakes Ranger District

BILLING AND PAYMENT INSTRUCTIONS:

Billing Address:

COR Mike Montgomery Canyon Lakes Ranger District 2150 Centre Ave. Building E Fort Collins, CO 80526

TASK ORDER ADMINISTRATION:

Contracting Officer’s Representative (COR):

Name: Mike Montgomery

Address: 2150 Centre Ave. Building E Phone: (970-295-6741 Fax: (970-295-6795 E-mail: mmontgomery@fs.fed.us

CONTRACT ACTIVITIES ASSOCIATED WITH SCHEDUEL OF ITEMS ORDERED AND PRICE:

Contract Item Number(s):

ITEM NUMBER
NON SAWTIMBER AND BIOMASS TREATMENT AND OTHER SERVICE ACTIVITIES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0003A
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
27
Acre
$
$
0001Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
87
Acre
$
$
0002Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
22
Acre
$
$
0004Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
52
Acre
$
$
0005Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
75
Acre
$
$
Acre
$
$
TOTAL
263

IMPLEMENTATION SCHEDULE: Proposed start date: XXXXXXXXX

CONSERVATION CREDIT FUND
TASK ORDER CREDITS: $

TASK ORDER ACCEPTANCE:

Contractor’s Authorizing Official

Date

TASK ORDER APPROVALS:

JOB CODES
BUDGET OBJECT CLASS
ACRES

$ AMOUNT

1
2540

TOTALS-----------(

B & F Officer Certification of Funds Availability

Contracting Officer

FRLT Stewardship

Lonetree Project Specifications for Cutting Units 7-8-9a-9b-10

UNIT SPECIFICATIONS:

Table 1: Unit Treatment Description and Level of Dificulty

Unit
Acres
Item

Number

Description
Non Saw TPA
Bio TPA
Total TPA
Aver.

Slope %

7
51
0004Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
21
257
278
10
7
71
0005Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
21
257
278
28
7
24
0003A
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
21
257
278
43
8
13
0001Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
100
63
163
10
8
8
0002Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
100
63
163
28
9a
4
0001Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
50
150
200
10
9a
1
0002Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
50
150
200
28
9b
1
0004Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
50
175
225
10
9b
4
0005Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
50
175
225
28
9b
2
0003A
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
50
175
225
43
10
70
0001Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
18
132
150
10
10
13
0002Q
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
18
132
150
28
10
1
0003A
Manual Cut designated biomass and non-sawtimber trees, Hand pile slash
18
132
150
43

Table 2: Volume Estimate and Utilization Standards (Appendix B, Division A)

Species Group
Product
Estimated

Quantity Unit of

Measure Minimum Specifications

Merchantable Tree
Piece Required to be Removed

Diameter Breast High (d.b.h.)

(inches) Number of Minimum Pieces per Tree Length (feet) Diameter Inside Bark at Small End (inches) 1/

Timber Subject to Agreement

Total Quantity

Timber Designations, acres are approximate:

Acres

Clearcutting Units (H.11)

Overstory Removal Units (H.11)

Understory Removal Units (H.11)

Individual Trees (H.11)

Incompletely Measured (H.11)

Designation by Description (H.11)

High Stumps

Species
Product
Maximum Stump Height

(inches)

All
Non-Sawtimber
12
All
Biomass
6

1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.

2/ Required removal if applicable or removal as Timber Subject to Agreement of Non-sawtimber and biomass will be specified in individual task orders.

3/ Volume for non-sawtimber and biomass not required to be removed will be agreed to in writing at time of removal.

UNIT BOUNDARIES (Solicitation, H.10.3) - The boundaries of work units are designated as shown in the following table. The trees used for boundary designation are not to be cut.

Cutting Unit Boundary Designation Table

Cutting Unit Paint Color

Designation

All Orange

Each boundary tree is marked with three Orange stripes. These stripes are painted at eye level. One stripes faces into the cutting unit and the stripes on the sides of the tree face the adjoining boundary tree.

Each boundary tree has a orange mark below the stump height. Yellow 5.5”x7.0” signs are posted along the boundary and face into the unit. The cutting unit number is identidied on these signs.

UNIQUE FEATURES OF PROJECT AREA

Within the Project Area protected improvements exist which will not be disturbed during contractor operations. These features are listed below and are identified on the Statement of Work Map as “PI” (See Attachments) Protected Improvements included in this task order:

Protected Improvements
Description
Location
Fences
Upright and fair condition multi-stand smooth or barb wire with wood or steel posts

See Statement of Work Map

Gates
Metal and Wire Gates
See Statement of Work Map
BLM Survey Marker
Monument Post and Bearing Trees. *

* See Below

Trails
Social
See Statement of Work Map
Roads
All Roads
See Statement of Work Map
Power Lines
All Power Lines
See Statement of Work Map
Cultural Resources
Historical Cultural Resource Areas

All unique features will be protected from damage by the contractor. If any unique features are disturbed the contractor will immediately contact the Contacting Officer (CO) and will be liable for the cost of repairs.

* The Contractor shall be responsible for the protection from damage by their actions of all noted Monument Posts and Bearing Trees identified by the Forest Service within the contract area. The Contractor shall immediately notify the COR or CO if any damage occurs to these resources.

CUTTING PRESCRIPTIONS:

1) DESIGNATION BY DESCRIPTION – Understory Removal (Solicitation, H.11.6) - As shown on Contract Area Map, the following criteria shall be used by Contractor to designate trees and other products for cutting within the Subdivision(s) or unit(s) listed below:

2) Units 7,8,9a,9b,10-Non-sawtimber Cutting Designation (Appendix A, 6.1.1) – This task involves cutting designated ponderosa pine 5.0 to 9.9 inches DBH, Douglas-fir and other conifer species 5.0 to7.9 inches DBH, and lodgepole pine 5.0to 6.9 inches DBH. The task is to be accomplished by hand falling methods.

3) Units 7, 8, 9a, 9b, 10-Cut Biomass (Appendix A, 6.2) This task involves cutting ponderosa pine 1.0 to 4.9 inches DBH, Douglas-fir and other conifer species 1.0 to 4.9 inches DBH, and lodgepole pine 1.0 to 4.9 inches DBH. This task is to be accomplished by hand falling methods.

DBH AND SPACING CRITERIA

Unit
DBH
REQUIRED SPACING
7,8,9a,9b,10
Leave all Ponderosa Pine > 10.0”

Leave all Douglas-Fir and other

Conifer species > 8.0”

Leave all Lodgepole Pine > 7.0” 25’ x 25’may vary + or – 20%

Criteria for Selection of Leave Trees

a. The best available acceptable leave trees, both conifers and hardwoods, shall be selected as leave trees and treated in accordance with spacing requirement and the number per acre. The average spacing may vary + or - 20% of the spacing stated in the above table in order to select the best leave trees without numerically changing the average number of leave trees per acre.

b. The largest, healthiest, best-formed trees shall be selected as leave trees. Characteristics used in the selection of leave trees include the following:

1) Has no apparent damage to the main bole;

2) Is not chlorotic;

3) Demonstrates good vigor and is disease/bug free;

4) Has at least 40 percent crown ratio.

5) When Rocky Mountain Juniper will be left as a leave tree, the contractor shall leave all stems that are attached to the same root collar. Root collar shall be defined as 3 inches above ground level.

c.

Species preference guidelines will be identified by the Government on each unit.

Applicable for all Units included in this task order unless otherwise specified by the CO:

Leave Trees in order of Preference:

1. Engelmann Spruce

2. Ponderosa Pine,

3. Limber Pine,

4. Lodgepole Pine,

5. Douglas Fir

6. Sub-Alpine Fir

7. Rocky Mountain Juniper

d. The Government may identify additional individual leave trees or leave tree areas within each unit.

Stump Height (Appendix A, 6.1) - All trees which are required to be cut shall be cut at or below at a maximum of 12 inches above ground, measured from the uphill side, after a tree is felled. All biomass trees which are required to be cut, shall be cut at or below a maximum of 6 inches above ground, measured from the uphill side, after a tree is felled. Trees shall be completely severed from the stump. No live limbs shall be left on the stump of any stem. A live limb is a limb of any size that has green needles attached.

Felling (Appendix A, 6.1) - Cut-trees shall be completely severed from the stump. Trees shall be felled directionally away from all private land boundaries, utilities, fence and other improvements, protected water and drainages, and land survey corners. Cut trees shall not be left leaning or suspended by any leave tree or fence. No hang-ups shall be permitted. Trees which are felled across telephone or electrical lines the contractor shall immediately notify the utility company than the CO, COR. Removal of these trees shall be performed at the Contractor’s expense. Restoration of utility lines shall be at the contractors expense to Utility Company standards.

Slash (Appendix A, 5) - Any non-merchantable woody debris, exclusive of stumps and chips/chunks from mastication, created from work under this contract and remaining on the ground after treatment operations, including all cut trees and shrubs and their tops, trunks, and branches. The slash that is generated as a result of fuel treatments and will be treated as specified below.

TREATMENT SPECIFICATIONS:

Units 7, 8, 9a, 9b and 10 - Slash Treatment – Manual Cut and Pile (Appendix A, 6.6) – Vegetation as indicated in the task order, up to 9.9” DBH will be hand severed using a saw, followed by piling. All slash treatments are considered part of the thinning process and shall be keep current with the thinning operations.

Units 7, 8, 9a, 9b, and 10 – Slash Treatment – Hand Pile Only (Appendix A 6.7) All piles shall be constructed as compactly as possible, with heavier material placed on top.

All created and existing slash between 3 and 8 inches in diameter and greater the 3 feet in length shalled be piled. Slash less than 3 inches in diameter and less than 3 feet in length shall be left on the ground. Slash left on the ground shall not exceed 24 inches in depth.

All piles shall be constructed by laying limbs, cut boles, and other slash in the pile so as to be triangular in shape, or as specified in the task order. All ends that stick out more than 4 feet must be bucked off and piled. Larger material in piles shall be placed perpendicular to slope so it cannot roll down hill when burned.

Slash that causes large air spaces in piles shall be cut to eliminate air spaces. Each pile shall include an area of small sized slash (small braches less than ¼ to ½ inch in diameter and/or small branvhes with needles or leaves attached) to provide “kindling” for prompt ignition and to aid in combustion of larger slash. These fuels shall be placed in the center of the pile. All piles shall be compct to facilitate burning.

Unless approved by the COR, maximum pile size shall be 25 feet in diameter by 20 feet in height, and minimum pile size shall be 10 feet in diameter by 8 feet in height at the time of final inspection.

Piles shall not be constructed in roadways unless specified by the COR. In somes cases, the COR may determine that it is beneficial to place piles or slash in old roads that have been closed. Piles shall not be constructed in roads, ditches, or drains. Piles shall not be constructed any closer than twenty (20) feet from established roads, trails, existing fences. Piles shall not be constructed with in 100 feet of utility poles and a minimum of 50 feet from overhead utility lines. Piles shall not be constructed within the channel of any stream, or on top of downed logs, stumps, or snags. An inventory or tally of the size, shape and number of piles shall be made following the instructions in the task order and recorded on the pile inventory form provided by the COR

6.7.1 An inventory or tally of the size, shape and number of piles shall be made following the instructions in the task order and recorded on the pile inventory form provided by the COR.

SPECIAL TASK ORDER REQUIREMENTS:

SALE OPERATION RESTRICTIONS (Solicitation, F.4) - Unless otherwise agreed to in writing, sale operations will be restricted as listed below:

Sale Operation Restriction Schedule

Subdivision/Cutting Unit
Operation
Time Period
Purpose
All
All
March 15 through June 15 when

soils and temporary roads are wet

(saturated or near saturated soil, and spring snow thaw creates overland water flow or water in ephemeral drainages) To protect the soil and watershed resources

All
All
During mechanical treatment

activities, equipment should only be operated when soil moisture in the upper 6 inches is below the plastic limit or protected by at least one foot of packed snow or

2 inches of frozen soil To protect the soil and watershed resources

EXISTING TEMPORARY ROAD CLOSURE COST ALLOWANCE:

TEMPORARY ROAD CLOSURE COST ALLOWANCE

Unit (100')
Cost
1
$45

TEMPORARY GATE COST ALLOWANCE

Each
Cost
1
$1,800

TOTAL TEMPORARY ROAD COST ALLOWANCE

$1,845

FIRE PRECAUTIONS AND CONTROL (Solicitation, H.21) - The Fire Precautionary Period for Task Order is ___May 1st____ to ____Nov 30th____.