task_order_long_john_09182008_fy09.doc
DOC document 214 KB Posted
- Attached to
- Front Range Long Term Stewardship Contract Federal contract opportunity
- Solicitation number
- AG-82X9-S-08-0120
About this file
PSINF Draft Task Order-Long John
View the file
Other files for this federal contract opportunity
Show all 50
Front Range Long Term Stewardship Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order for Long John FRLT Stewardship Project
FRLT STEWARDSHIP PROJECT
LONG JOHN DRAFT TASK ORDER
DELIVERY ORDER NUMBER:__XXXXXXXXX__
Date of Request /Order:_ XXXXXXXX___________________ Master Contract Number: _XXXXXXXX_____________________
Ranger District: ____Pikes Peak Ranger District___________________________ Contractor: ______XXXXXXXXXXX________________________________
PERIOD OF PERFORMANCE: __XXX_Calendar Days.
Notice To Proceed will be issued on or about:___XXXXXXXXXX__ PERFORMANCE DATA: (See attached supporting documents for selection of treatment to be performed and all requirements.)
Project Specifications and Project Area Map provided separately PLACE OF DELIVERY OR PERFORMANCE (Where will the Contractor begin work):
Pikes Peak Ranger District
BILLING AND PAYMENT INSTRUCTIONS:
Billing Address:
TASK ORDER ADMINISTRATION:
Contracting Officer’s Representative (COR):
Name:
Address:
Phone:
Fax:
E-mail:
CONTRACT ACTIVITIES ASSOCIATED WITH SCHEDUEL OF ITEMS ORDERED AND PRICE:
Contract Item Number(s):
| ITEM NUMBER |
| NON SAWTIMBER AND BIOMASS TREATMENT AND OTHER SERVICE ACTIVITIES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0018F |
| CUT designated non-sawtimber trees, |
bring slash to landing and pile, deck boles at landing
| 22 |
| Acre |
| $ |
| $ |
| 0018D |
| CUT designated non-sawtimber trees, pile slash in unit, yard non-sawtimber boles to landing, deck boles at landing |
| 272 |
| Acre |
| $ |
| $ |
| Temp RD |
| EXISTING TEMPORARY ROAD RECONSTRUCTION COST ALLOWANCE (opening of existing temporary road, including clearing) |
| 21.1 |
| 100ft |
| $23.94 |
| $505.13 |
TOTAL
IMPLEMENTATION SCHEDULE: Proposed start date: XXXXXXXXX
| CONSERVATION CREDIT FUND |
| TASK ORDER CREDITS: $ |
TASK ORDER ACCEPTANCE:
Contractor’s Authorizing Official
Date
TASK ORDER APPROVALS:
| JOB CODES |
| BUDGET OBJECT CLASS |
| ACRES |
$ AMOUNT
| 1 |
| 2540 |
TOTALS-----------(
B & F Officer Certification of Funds Availability
Contracting Officer
FRLT Stewardship
Long John Project Specifications for Cutting Units 1,2,4,5 and 6
UNIT SPECIFICATIONS:
Table 1: Unit Treatment Description and Level of Dificulty
| Unit |
| Acres |
| Item |
Number
| Description |
| Non Saw TPA |
| Bio TPA |
| Total TPA |
| Aver. |
Slope %
| 1 |
| 22 |
| 0018F |
| CUT designated non-sawtimber trees, |
bring slash to landing and pile, deck boles at landing
| 68 |
| 58 |
| 126 |
| 7 |
| 2 |
| 94 |
| 0018D |
| CUT designated non-sawtimber trees, pile slash in unit, yard non-sawtimber boles to landing, deck boles at landing |
| 53 |
| 50 |
| 103 |
| 10 |
| 4 |
| 83 |
| 0018D |
| CUT designated non-sawtimber trees, pile slash in unit, yard non-sawtimber boles to landing, deck boles at landing |
| 50 |
| 137 |
| 187 |
| 10 |
| 5 |
| 31 |
| 0018D |
| CUT designated non-sawtimber trees, pile slash in unit, yard non-sawtimber boles to landing, deck boles at landing |
| 42 |
| 350 |
| 392 |
| 10 |
| 6 |
| 64 |
| 0018D |
| CUT designated non-sawtimber trees, pile slash in unit, yard non-sawtimber boles to landing, deck boles at landing |
| 60 |
| 294 |
| 354 |
| 10 |
Table 2: Volume Estimate and Utilization Standards (Appendix B, Division A)
| Species Group |
| Product |
| Estimated |
Quantity Unit of
Measure Minimum Specifications
| Merchantable Tree |
| Piece Required to be Removed |
Diameter Breast High (d.b.h.)
(inches) Number of Minimum Pieces per Tree Length (feet) Diameter Inside Bark at Small End (inches) 1/
| Ponderosa Pine Live/Dead |
| Sawtimber |
| 2,149 |
| Green Ton |
| 10.0 |
| 1 |
| 8 |
| 8 |
| 10.67 |
| Lodgepole Pine Live/Dead |
| Sawtimber |
| 0 |
| Green Ton |
| 7.0 |
| 1 |
| 8 |
| 6 |
| 10.67 |
| Douglas-fir and Other Conifer Live/Dead |
| Sawtimber |
| 2,468 |
| Green Ton |
| 8.0 |
| 1 |
| 8 |
| 6 |
| 10.67 |
| All 2/ |
| Non-Sawtimber |
| 0 |
| Green Ton |
| 5.0 |
| 1 |
| 6.5 |
| 4 |
| 8.0 |
Timber Subject to Agreement
| All 2,3/ |
| Non-Sawtimber |
| Unestimated |
| Green Ton |
| 5.0 |
| 1 |
| 6.5 |
| 4 |
| 8.0 |
| All 2,3/ |
| Biomass |
| Unestimated |
| Green Ton |
| 1.0 |
| 1 |
| 6.5 |
| 0.5 |
| N/A |
Total Quantity
1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.
2/ Required removal if applicable or removal as Timber Subject to Agreement of Non-sawtimber and biomass will be specified in individual task orders.
3/ Volume for non-sawtimber and biomass not required to be removed will be agreed to in writing at time of removal.
Timber Designations, acres are approximate:
Acres
Clearcutting Units (H.11)
Overstory Removal Units (H.11)
Understory Removal Units (H.11)
| Individual Trees (H.11) |
| 294 |
Incompletely Measured (H.11)
Designation by Description or Prescription (H.11)
High Stumps
| Species |
| Product |
| Maximum Stump Height |
(inches)
| All |
| Sawtimber |
| 12 |
| All |
| Non-Sawtimber |
| 12 |
| All |
| Biomass |
| 12 |
UNIT BOUNDARIES (Solicitation, H.10.3) - The boundaries of work units are designated as shown in the following table. The trees used for boundary designation are not to be cut.
Cutting Unit Boundary Designation Table
Cutting Unit Paint Color
Designation
All Orange
Orange Streaks of paint on three sides of the cutting unit boundary tree extending below stump height to a height of four feet or more. The middle streak of paint faces the area to be cut.
CUTTING PRESCRIPTIONS:
1) Units 1,2,4,5 and 6 Sawtimber – This task involves cutting designated ponderosa pine 10.0 inches DBH and greater, Douglas-fir and other conifer species 8.0 inches DBH and greater, and lodgepole pine 7.0 inches DBH and greater. The task may be accomplished by hand falling or mechanical methods. All sawtimber size trees have been Individual Tree Marked.
INDIVIDUAL TREES (CUT TREE MARKING) (Solicitation, H.11.11) - Notwithstanding H.11.7 - C.3.5, in units shown as ITM on the Contract Area Map, individual trees are designated for cutting only if marked above and below stump height as show in the table below:
Cut Tree Marking Table
Cutting Unit
Paint Color
1,2,4,5,6
Blue
2) Units 1,2,4,5 and 6 Non-sawtimber – This task involves cutting designated ponderosa pine 5.0- 9.9 inches DBH, Douglas-fir and other conifer species 5.0-7.9 inches DBH, and lodgepole pine 5.0- 6.9 inches DBH. The task may be accomplished by hand falling or mechanical methods.
DESIGNATION BY PRESCRIPTION (Solicitation, H.11.15) - As shown on Contract Area Map, the following criteria shall be used by Contractor to designate trees and other products for cutting and removal within the Subdivision(s) or unit(s) listed below.
Contractor will be required to sample leave tree mark an area with Contractor's non-tracer __Blue_____ paint for approval by Forest Service prior to cutting. If Forest Service approves marking than contractor will not be required to mark leave trees prior to cutting. If at any time Forest Service determines that cutting is not according to prescription than Contractor shall mark leave trees with Contractor's non-tracer ___Blue____ paint if requested to do so by the Forest Service. Forest Service shall inspect and approve Contractor marking prior to cutting.
(a) Additional trees to be cut, if any, are Marked by Forest Service with ___Blue,Yellow or Green____ tracer paint.
(b) Cutting unit boundaries and other trees that shall be left uncut are Marked by Forest Service with __Orange_____ tracer paint.
(c) Subdivision/Unit Criteria
1-6
1. All non-sawtimber size trees are designated to be cut unless otherwise agreed to by the US Forest Service.
Stump Height (Appendix A, 6.1) - All trees which are required to be cut shall be cut at or below at a maximum of 12 inches above ground, measured from the uphill side, after a tree is felled. Trees shall be completely severed from the stump.
Felling (Appendix A, 6.1) - Cut-trees shall be completely severed from the stump. Trees shall be felled directionally away from all private land boundaries, utilities, fence and other improvements, protected water and drainages, and land survey corners. Cut trees shall not be left leaning or suspended by any leave tree or fence. No hang-ups shall be permitted. Trees which are felled across telephone or electrical lines the contractor shall immediately notify the utility company than the CO, COR. Removal of these trees shall be performed at the Contractor’s expense.
Slash (Appendix A, 5) - Any non-merchantable woody debris, exclusive of stumps and chips/chunks from mastication, created from work under this contract and remaining on the ground after treatment operations, including all cut trees and shrubs and their tops, trunks, and branches. The slash that is generated as a result of fuel treatments and sawtimber removal will be treated as specified below.
TREATMENT SPECIFICATIONS:
Units 1 Slash Treatment - Bring Slash to the Landing (Appendix A, 6.3.3) – the tops and limbs of sawtimber nad non-sawtimber sized trees designated for cutting and the bole required to be yarded to the landing, will be removed from the unit and brought to the landing. The usual method of accomplishing this treatment is by whole tree skidding. Proposals for other methods to accomplish the treatment will be considered. Tops and branches that break off during skidding operations, shall be lopped and scattered according to the specifications of Appendix A 6.3.1. At the landing, limbs will be cut from the stem of the trees, limbs will be piled in locations approved by the Forest Service, and boles stacked parallel in a deck at approved locations. All slash treatments are considered part of the thinning process and shall be keep current with the thinning operations.
Units 1 Slash Treatment –Piling at Landing (Appendix A, 6.3.2) - This task involves cutting limbs from the trunks of designated cut trees and then piling the slash. Slash to be piled shall include all material from one (1) inches diameter up to and including eight (8) inches in diameter at the large end, having a minimum length of three (3) feet.
Piles shall be reasonably compact and free of soil.
Piles shall have a minimum height of six (6) feet.
Piles will not be more than 20 feet in height, or 20 feet in width.
Piles shall be located at least 30 feet from residual timber and 100 feet from protected stream courses. If conditions make it impractical to locate piles so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
Piles shall not be more than 100 feet long.
All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
If piling is accomplished with a machine, it will be of such size that will cause minimal damage to the residual timber and with acceptable brush piling blade. Forest Service will need to approve the equipment and the type of brush blade.
An inventory or tally of the size, shape and number of piles shall be made following the instructions in the task order and recorded on the pile inventory form provided by the COR.
Units 2,4,5 and 6 Slash Treatment –Piling in Units (Appendix A, 6.3.2) - This task involves cutting limbs from the trunks of designated cut trees and then piling the slash. Slash to be piled shall include all material from one (1) inches diameter up to and including eight (8) inches in diameter at the large end, having a minimum length of three (3) feet.
Piles shall be reasonably compact and free of soil.
Piles shall have a minimum height of six (6) feet.
Piles will not be more than 20 feet in height, or 20 feet in width.
Piles shall be located at least 30 feet from residual timber and 100 feet from protected stream courses. If conditions make it impractical to locate piles so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
Piles shall not be more than 100 feet long.
All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
If piling is accomplished with a machine, it will be of such size that will cause minimal damage to the residual timber and with acceptable brush piling blade. Forest Service will need to approve the equipment and the type of brush blade.
Sawtimber Slash Treatment (Appendix B, K.G.7) - Slash is defined as logs, tops, limbs, and other woody material, exclusive of stumps, which is created by the logging operation and remaining on the ground after logging. In areas where Contractor-created slash is intermingled and inseparable from pre-existing slash, slash disposal requirements shall apply to the pre-existing slash as well as the Contractor-created slash. Such areas are designated in the Contractor Slash Responsibility Table herein.
Slash created in the construction of Specified Roads shall not be considered as logging slash in this Section.
Unless otherwise agreed in writing, Contractor shall perform the following work described below and/or as shown on the Contract Area Map and/or Slash Disposal Map.
Forest Service and Contractor shall jointly develop a schedule for completion of slash treatment on the various portions of the contract area.
Contractor's Slash Responsibility Table
Description of Unit(s)
Type of Slash Disposal
Units 1 Slash Treatment - Bring Slash to the Landing (Appendix A, 6.3.3) – the tops and limbs of sawtimber nad non-sawtimber sized trees designated for cutting and the bole required to be yarded to the landing, will be removed from the unit and brought to the landing. The usual method of accomplishing this treatment is by whole tree skidding. Proposals for other methods to accomplish the treatment will be considered. Tops and branches that break off during skidding operations, shall be lopped and scattered according to the specifications of Appendix A 6.3.1. At the landing, limbs will be cut from the stem of the trees, limbs will be piled in locations approved by the Forest Service, and boles stacked parallel in a deck at approved locations. All slash treatments are considered part of the thinning process and shall be keep current with the thinning operations.
Units 1 Slash Treatment –Piling at Landing (Appendix A, 6.3.2) - This task involves cutting limbs from the trunks of designated cut trees and then piling the slash. Slash to be piled shall include all material from one (1) inches diameter up to and including eight (8) inches in diameter at the large end, having a minimum length of three (3) feet.
Piles shall be reasonably compact and free of soil.
Piles shall have a minimum height of six (6) feet.
Piles will not be more than 20 feet in height, or 20 feet in width.
Piles shall be located at least 30 feet from residual timber and 100 feet from protected stream courses. If conditions make it impractical to locate piles so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
Piles shall not be more than 100 feet long.
All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
If piling is accomplished with a machine, it will be of such size that will cause minimal damage to the residual timber and with acceptable brush piling blade. Forest Service will need to approve the equipment and the type of brush blade.
An inventory or tally of the size, shape and number of piles shall be made following the instructions in the task order and recorded on the pile inventory form provided by the COR.
Units 2,4,5,6 Slash Treatment –Piling in Units (Appendix A, 6.3.2) - This task involves cutting limbs from the trunks of designated cut trees and then piling the slash. Slash to be piled shall include all material from one (1) inches diameter up to and including eight (8) inches in diameter at the large end, having a minimum length of three (3) feet.
Piles shall be reasonably compact and free of soil.
Piles shall have a minimum height of six (6) feet.
Piles will not be more than 20 feet in height, or 20 feet in width.
Piles shall be located at least 30 feet from residual timber and 100 feet from protected stream courses. If conditions make it impractical to locate piles so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
Piles shall not be more than 100 feet long.
All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
If piling is accomplished with a machine, it will be of such size that will cause minimal damage to the residual timber and with acceptable brush piling blade. Forest Service will need to approve the equipment and the type of brush blade.
Units 2,4,5 and 6 Non-sawtimber Treatment - Yard Boles to Landing (Appendix A, 6.4) – non-sawtimber sized trees designated for cutting, shall be yarded and decked (boles stacked parallel) at the landing, after all limbs are cut from the stem. Decks will not be more than 20 feet in height unless agreed otherwise in writing. All objects that extend for more than 4 feet in any direction from the deck profile will be cut off and returned to the deck.
SPECIAL TASK ORDER REQUIREMENTS:
SALE OPERATION RESTRICTIONS (Solicitation, F.4) - Unless otherwise agreed to in writing, sale operations will be restricted as listed below:
Sale Operation Restriction Schedule
Subdivision/
Cutting Unit
| Operation |
| Time Period |
| Purpose |
| ALL |
| Log hauling activities will be restricted to periods when the roads are dry or frozen and rutting will not occur. In addition log hauling activities will be restricted on weekends from 12 pm on Friday to 6 am on Monday morning to minimize the effect on recreational users to the area. Unless otherwise agreed to by the US Forest Service. |
Length of Contract
Eliminate recreational conflict
PROTECTION OF IMPROVEMENTS (Solicitation H.6) - So far as practicable, Contractor shall protect Specified Roads and other improvements (such as roads, trails, telephone lines, ditches and fences):
(a) Existing in operating area,
(b) Determined to have a continuing need or use, and
(c) Designated on Contract Area Maps.
Contractor shall keep roads and trails needed for fire protection or other purposes and designated on Contract Area Maps reasonably free of equipment and products, slash, and debris resulting from Contractors Operations. Contractor shall make timely restoration of any such improvements damaged by Contractor’s Operations and when necessary because of such operations shall move such improvements as specified.
PROTECTION OF FENCES (Solicitation, H.6.1) - Unless otherwise agreed to in writing, all fences, as designated on Contract Area Maps, which are required to be cut because of temporary road construction, skid road construction, or other activities, shall not be cut until the fence has first been "line braced" or "fence braced," to prevent loss of tension, on both sides of the wire span or series of short spans to be cut.
The Purchaser shall install temporary cattle guards in accordance with attached plans at each location where the fence is cut for temporary road access unless otherwise approved in writing by Forest Service. All fences will be restored promptly after operations are complete to the condition existing immediately prior to operations. Fence repair will be kept current with operations.
EROSION PREVENTION AND CONTROL (Solicitation, H.7.1) - Skidding with tractors within 100 feet of live streams shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent stream courses. Skid trails shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover
Prior to periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Contractor shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams.
Unless otherwise agreed in writing, Contractor shall keep erosion control work current with his operations under the contract and in any case not later than 15 days after completion of skidding on each work unit.
EROSION CONTROL SEEDING (Solicitation, H.7.2) - Following completion of skidding and yarding operations in an area, Contractor shall seed and fertilize all exposed areas of raw soil as designated by the Forest Service on skid trails, landings, firebreaks, slides, slumps, Temporary Roads and traveled ways of Specified Road following closure.
Specified roads following closure needed to be seeded none.
Soil on areas to be seeded shall be left in a roughened condition favorable to the retention and germination of the seed. Scarification of traveled ways on Specified Roads listed above shall be to a minimum depth of N/A inches and a maximum depth of N/A inches
Seed and fertilizer shall be spread evenly at the rate of 10 pounds of seed and 0 pounds of fertilizer per acre.
When fertilizer and seed are applied in separate operations, the second operation shall be carried out within 72 hours of the first.
Seeding shall be done during the period 6/15 to 9/15 and under the above specified conditions unless otherwise approved.
The kinds and amounts of seed to be sown in terms of pure live seed (PLS) shall be:
Species of Seed
PLS Pounds Per Acre
Agropyron trachycaulum
2.5
Bromus cilliatus
3.0
Festuca idahoensis
0.25
Festuca saximontana
1.0
Poa alpina
2.0
Poa secunda
1.0
Thermopsis montana
0.25
TOTAL
All seed purchased will be certified to be free of the noxious weed seeds from weeds listed on the current "All States Noxious Weeds List." Test results from a certified seed analyst and seed analysis labels attached to the bags will be provided to the Forest Service.
The following kinds and amounts of standard commercial fertilizer shall be used with guaranteed analysis of contents clearly marked on containers:
Type of Fertilizer
Pounds Per Acre
N/A
N/A
PROTECTION OF LAND SURVEY MONUMENTS (Solicitation, H.8) - Forest Service shall appropriately designate on the ground all known survey monuments including but not limited to horizontal control stations (Triangulation Stations), vertical control stations (Bench Marks), property corner monuments, and all Public Land Survey System monuments. This shall include reference monuments, corner accessories such as bearing trees, line trees and line posts. Identifying signs shall be posted by Forest Service on two sides of each known bearing tree, and each line post shall be posted with a metal sign or decal. Line trees may be cut if designated by the Government.
In authorized clearings such as Clear cutting Units and road construction clearings, and in other instances where damage to survey monuments, corners, corner accessories and survey of property line markers is unavoidable, Forest Service shall arrange protective or perpetuative action which does not cause unnecessary delay to Contractor.
Contractor shall protect all known survey monuments, witness corners, reference monuments, bearing trees and line markers against avoidable destruction, obliteration or damage during Contractor's operations. Additional monuments or objects discovered on the area shall be promptly reported to the other party and shall also be protected. If any known monuments, corners, corner accessories, and survey or property line markers are destroyed, obliterated or damaged during Contractor's operations, Contractor shall employ a registered professional land surveyor to reestablish or restore at the same location the monuments, corners, corner accessories or line markers. Such surveyors shall use procedures and monumentation that accords with the Bureau of Land Management Manual of Instructions for the Survey of the Public Lands of the United States for General Land Office surveys and any applicable State statutes concerned with land surveys. Contractor's agent shall record such surveys in accordance with state survey statutes.
FIRE PRECAUTIONS AND CONTROL (Solicitation, H.21) - The Fire Precautionary Period for Task Order is ___May 1st____ to ____Nov 30th____.
TEMPORARY ROADS (Solicitation, H.25) - Temporary Roads are roads other than specified roads that are constructed by contractor for the purpose of harvesting included timber or for the completion of required work items. The location and clearing widths of Temporary Roads or facilities shall be designated or agreed to in writing by the Forest Service prior to construction. Such location shall include the marking of road centerline or grade line and the setting of such construction stakes as are necessary to provide a suitable basis for economical construction and protection of National Forest Lands. Definitions, specifications, and drawings for the following temporary road construction work items are listed in Appendix D. The Forest Service will pay the contractor for the construction of approved temporary road construction items outside of the cutting or treatment unit boundaries. The Forest Service will not pay the contractor for any temporary road construction items within the cutting or treatment unit boundaries. Temporary road construction payment rates are listed below.
EXISTING TEMPORARY ROAD RECONSTRUCTION COST ALLOWANCE (opening of existing temporary road, including clearing)
| UNIT |
| Length (ft) |
| Total Segments (100ft/segment) |
| Total Cost ($23.94/100ft) |
| 6 |
| 2109 |
| 21.1 |
| 505.13 |
USE OF ROADS BY CONTRACTOR (Solicitation, H.26) - Except as provided herein, Contractor is authorized to use existing National Forest roads and Specified Roads, when such use will not cause damage to the roads or National Forest resources and when hauling can be done safely. If Contractor’s use of an existing temporary or National Forest system road cannot be satisfactorily accommodated without reconstruction, Contractor shall be authorized to use such road upon agreement as to the minimum reconstruction work that Contractor shall perform before hauling.
The Contract Area Map shows existing temporary or permanent roads that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:
(a) Cannot be used for log hauling or
(b) May be used only under the restrictive limitations stated therein.
Contractor's use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:
Code Use Limitations
X Hauling prohibited
R Hauling restricted
U Unsuitable for hauling prior to completion of agreed reconstruction
P Use prohibited
A Public use restriction
W Regulation waiver
Roads coded A will be signed by the Forest Service to inform the public of use restrictions. Contractor's use of roads coded R, A, or W shall be in accordance with the following restrictions:
Restricted Road List Road
| Termini |
| Map |
| Description of |
| Number |
| Road Name |
| From |
| To |
| Legend |
| Restrictions |
| FDR |
| 335 |
| Gate from Hwy 67 |
| Project bdry |
| R |
| Log hauling activities will be restricted to periods when the roads are dry or frozen and rutting will not occur. In addition log hauling activities will be restricted on weekends from 12 pm on Friday to 6 am on Monday morning to minimize the effect on recreational users to the area. Unless otherwise agreed to by the US Forest Service. |
| FDR |
| 335A |
| Intersection of FDR 335 |
| Project bdry |
| R |
| Log hauling activities will be restricted to periods when the roads are dry or frozen and rutting will not occur. In addition log hauling activities will be restricted on weekends from 12 pm on Friday to 6 am on Monday morning to minimize the effect on recreational users to the area. Unless otherwise agreed to by the US Forest Service. |
ROAD MAINTENANCE REQUIREMENTS (Appendix B, K-F.3.1) - Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contract Road Maintenance Requirements Summary:
Termini
Applicable Prehaul Road Maintenace Specifications
| Road |
| From |
| To |
| Miles |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-805 |
| T-807 |
| T-808 |
| FSR 335 |
| Gate from Hwy 67 |
| Project bdry |
| .62 |
| FS |
| FS |
| FS |
| FS |
| FS |
| FS |
| FS |
| FSR 335A |
| Intersection of FSR 335 |
| Project bdry |
| .34 |
| FS |
| FS |
| FS |
| FS |
| FS |
| FS |
| FS |
P = Contractor Performance Item, FS = Forest Service Performance Item Forest Service will do required pre-haul maintenance or require Contractor to perform required pre-haul maintenance work. If performance by Contractor is required, Contractor will be paid for completing pre-haul maintenance of roads at the rates listed in H.27. Contractor will be responsible for doing all during and post haul road maintenance with no compensation from the Forest Service.
Termini
Applicable During Haul Road Maintenace Specifications
| Road |
| From |
| To |
| Miles |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-805 |
| T-807 |
| T-808 |
| FSR 335 |
| Gate from Hwy 67 |
| Project bdry |
| .62 |
| P |
| P |
| P |
| P |
| P |
| P |
| P |
| FSR 335A |
| Intersection of FSR 335 |
| Project bdry |
| .34 |
| P |
| P |
| P |
| P |
| P |
| P |
| P |
P = Contractor Performance Item
Termini
Applicable Post Haul Road Maintenace Specifications
| Road |
| From |
| To |
| Miles |
| T-800 |
| T-801 |
| T-802 |
| T-803 |
| T-805 |
| T-807 |
| T-808 |
| FSR 335 |
| Gate from Hwy 67 |
| Project bdry |
| .62 |
| P |
| P |
| P |
| P |
| P |
| P |
| P |
| FSR 335A |
| Intersection of FSR 335 |
| Project bdry |
| .34 |
| P |
| P |
| P |
| P |
| P |
| P |
| P |
P = Contractor Performance Item