amendment2.pdf

PDF 115 KB Posted

Attached to
Front Range Long Term Stewardship Contract Federal contract opportunity
Solicitation number
AG-82X9-S-08-0120
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

View the file

Other files for this federal contract opportunity

Other files attached to Front Range Long Term Stewardship Contract, newest first.
File Type Posted
AR_Stand_Data_Tables09.doc DOC document
attachment1.pdf PDF
sca_colorado_wages.pdf PDF
amendment1_questions_answers_Bob_edits.doc DOC document
FRLTSC_road_maintenance_level_and_temp_road_milage_11042008.xls XLS spreadsheet
FRLTSC_road_maintenance_level_and_temp_road_milage_11182008.xls XLS spreadsheet
crystal4_taskorder.pdf PDF
task_order_manual_james_creek.doc DOC document
jamesck_manual_taskorder_page3.pdf PDF
jamesck_manual_taskorder_page2.pdf PDF
jamescrk_mechanical_taskorder.pdf PDF
lonetree_taskorder.pdf PDF
task_order_lontree_10312007.doc DOC document
task_order_crystal_4.doc DOC document
task_order_mechanical_james_creek.doc DOC document
jamesck_manual_taskorder_page1.pdf PDF
task_order_long_john_09292008_fy09.doc DOC document
task_order_howard_2_10142008_fy09.doc DOC document
scan0052.pdf PDF
FRLTSC_slides.ppt PPT presentation
650-04.pdf PDF
304-02_Rock_Crossing.pdf PDF
task_order_lontree_10312007.doc DOC document
lonetree_contract_map103107.pdf PDF
task_order_trout_creek.doc DOC document
troutck_contract_map103107.pdf PDF
task_order_crystal_4.doc DOC document
crystal4_contract_map1031072.pdf PDF
task_order_harris_park_09182008_fy09.doc DOC document
task_order_howard_2_09182008_fy09.doc DOC document
long_john_task_order_final_09252009.pdf PDF
howard_2_task_order_final_09252009.pdf PDF
frltsc_solicitation_final.pdf PDF
Recontouring.pdf PDF
Road Maintenance_T_814 - Drainage Excavation.pdf PDF
temp rd drainage structure.pdf PDF
Road Maintenance_T_803 - Typical Surface Blading Section.pdf PDF
appendix_j_psinf_final.pdf PDF
Typical Fill Removal.pdf PDF
appendix_f_map1.pdf PDF
appendix_i_final.pdf PDF
Road Maintenance_T_802_ Ditch Cleaning.pdf PDF
appendix_k.pdf PDF
appendix_e_map2.pdf PDF
Road Maintenance_T_815- Culvert Installation Details.pdf PDF
appendix_g.doc DOC document
appendix_c_final.pdf PDF
Road Maintenance_T_810- Surface Replacement.pdf PDF
appendix_e_map1.pdf PDF
temp rd rolling dip.pdf PDF
Show all 50

Front Range Long Term Stewardship Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 2 See block 16c

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

US Forest Service Region 2, Regional Office Attn: Richard Braun 740 Simms Street Golden, CO 80401

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-82X9-S-08-0120

9B. DATED (SEE ITEM 11) X

October 2, 2008

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, X is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this amendment is to make changes to the solicitation.

See following pages for details.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Kelvin Delaney

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

/S/ KELVIN DELANEY 12/04/2008

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation AG-82X9-S-08-0120, Amendment 2, pg 2 of 5

Continuation of block 14

Changes to the Solicitation

1. Appendix A, # 1, Scope of Work, pg 1 of 27: The following phrase is deleted: “Indefinite Delivery Quantity (IDQ)”.

2. Appendix A, # 2, paragraph (b), Boundaries: The phrase, “Cutting Unit Boundaries are marked with orange paint”, is deleted and replaced with the following: “Cutting Unit Boundaries are normally marked with orange paint. Any deviation from the norm will be specified at the task order level.”

3. Appendix A, # 6.3.2, Slash Treatment – Piling, 3): The phrase, “Piles will not be more than 20 feet in height, or 20 feet in width” is deleted and replaced with: “Piles will not be more than 20 feet in height , or 30 feet in width”.

4. Appendix A, # 6.3.2, Slash Treatment – Piling, 5): The phrase, ”Piles shall not be more than

100 feet long”, is deleted and replaced with: “Piles shall not be more than 30 feet long”.

5. Appendix A, # 6.8, Mechanical Pile Only, 3): The specified width of the pile is changed from 20 feet to 30 feet.

6. Appendix A, # 6.8, Mechanical Pile Only, 5): The specified length of the pile is changed from 100 feet to 30 feet long.

7. Appendix A, # 6.11.1, pg 18 of 27: The phrase, “Task orders for Item 18A thru 18I” is deleted and replaced with, “Task orders for Item 0031R3 thru 0031Z3”.

8. Appendix A, # 7, Government Quality Assurance Surveillance Plan: There were 8 paragraphs in this section. Paragraphs 3 thru 8 are deleted in their entirety. Paragraph 3 began with the words “Inspections will be made”.

9. Appendix A, # 8, Plot Inspections: This section is deleted in its entirety.

10. Appendix A, # 9, Performance Work Summary Table for non-saw timber treatments: This section is deleted in its entirety.

11. Appendix B, K-D.3.5# - Scheduled Rate Redetermination. (5/08): The first sentence in the 3rd paragraph is deleted and replaced with the following:

In scheduled rate redeterminations, Contracting Officer may make modifications in minimum specifications for trees or products in Division A of Appendix B, road maintenance requirements, deposits’ or cost allowances in Appendix D or H.27, logging methods in Appendix B - G.4, slash disposal in Appendix B - G.7, weight factors in Appendix C-4, and fire precautionary measures in H.21 if, and to the extent that, such changes are reasonably necessary to protect the interest of the United States.

12. The Provision RO-K-G-8.2.5#, Scaling as Presented (Sales by Load Count) (Option 2) (1/08), is added to Appendix B. The text is provided below:

RO-K-G-8.2.5# - SCALING AS PRESENTED (SALES BY LOAD COUNT)(Option 2) (1/08) Unless otherwise agreed to in writing, notwithstanding criteria in G.8.2, volume for all material will be paid for at rates listed in B.2 - Timber Removal Price Schedule on a predetermined conversion factor of __________ tons per load times the total loads

Solicitation AG-82X9-S-08-0120, Amendment 2, pg 3 of 5 counted.

Unless otherwise agreed to in writing, log trucks are restricted to a maximum gross vehicle weight of ____________ pounds, as well as State limits for width and height.

This provision can be added to task orders at the request of the contractor if certified weighing facilities are unavailable. The weight factors in Appendix C, and average load data will be used by the Forest service to establish the average number of tons per load of each product. So, for the example in B2-Timber Removal Schedule the price per ton is $2.77. If the average net weight hauled per load is 25 tons, the price per load would be $69.25 per load.

13. Appendix B, K-F.3.2# Road Maintenance Deposit Schedule (9/04); The provision is changed to read as follows:

K-F.3.2# – ROAD MAINTENANCE DEPOSIT SCHEDULE. (9/04) Other provisions herein notwithstanding, when Forest Service requests payment in lieu of Contractor’s performance of road maintenance, Contractor shall make Required Deposits (16 USC 537) for current and/or deferred road maintenance. Such deposits are based on the estimated volume and distance hauled and Contractor’s commensurate use of each road listed in the Road Maintenance Plan in K-F.3.1#.

Contractor and Forest Service may agree in writing on adjustment of such rates. If Contractor uses roads under jurisdiction of Forest Service other than those listed in the Road Maintenance Plan, Forest Service shall establish rates commensurate with Contractor’s use of such roads.

The Required Deposits for Forest Service work in lieu of Contractor performance and for deferred maintenance is: $___1/______ per green ton___.

1/ Specific requirements of this provision will be included in individual task orders if applicable. A surface rock replacement deposit of $0.16 per ton per mile will apply only to the work on the ARNF and will be required in individual task orders for hauling products over Forest Service roads with a rock surface. Other road maintenance deposits in lieu of Contractors performance of during haul or post haul road maintenance would be by mutual agreement only.

The following table lists who Contractor will make deposits for road maintenance to, and the rate per unit of measure of the deposit. The Road Maintenance Agreement is available for inspection at the Forest Supervisor’s Office.

Deposit Made to Rate Unit of Measure N/A N/A

14. Main body of solicitation, B.2 Timber Removal Price Schedule, footnote 1 under the heading “Required Surface Replacement Depostits”; The following is added to footnote 1: No Surface Replacement Deposits will be required or collected for work done on the PSINF. Surface

Solicitation AG-82X9-S-08-0120, Amendment 2, pg 4 of 5

Replacement Deposits will only apply to work done on the ARNF.

15. Main body of solicitation, E.3, Government Quality Assurance Surveillance Plan, is deleted from the solicitaiton.

16. Main body of solicitation, H.25, Temporary Roads: The first paragraph is deleted and replaced with the paragraph below:

Temporary Roads are roads other than specified roads that are constructed by contractor for the purpose of harvesting included timber or for the completion of required work items.

The location and clearing widths of Temporary Roads or facilities shall be designated or agreed to in writing by the Forest Service prior to construction. Such location shall include the marking of road centerline or grade line and the setting of such construction stakes as are necessary to provide a suitable basis for economical construction and protection of National Forest Lands. Definitions, specifications, and drawings for the following temporary road construction work items are listed in Appendix D. The Forest Service will pay the contractor for the construction of approved temporary road construction items outside of the cutting or treatment unit boundaries. The Forest Service will not pay the contractor for any temporary road construction, closure, or obliteration work required within the cutting or treatment unit boundaries. Temporary road construction payment rates are listed below.

17. Main body of solicitation, H.25.1, Obliteration and Closure Requirements for Temporary Roads, skid trails and Landings (11/06): This clause is deleted and replaced with the clause below:

H.25.1 OBLITERATION AND CLOSURE REQUIREMENTS FOR TEMPORARY ROADS,

SKID TRAILS AND LANDINGS. Unless otherwise agreed in writing, temporary roads, skid trails and landings associated with the cutting unit(s) listed in the following table shall be closed using the method described.

Unit(s) Type of Facility Closure Method

Specific requirements of this provision will be included in individual task orders if applicable.

Contractor will be paid for the obliteration or closure of Temporary Roads outside of treatment units at the rates listed above. Contractor will not be paid for obliteration or closure of Temporary Roads, Skid Trails, or Landings within the treatment units.

18. Main body of solicitation; the following clauses are added:

H.42 Maximum and Average Skid Distances Within a unit, the maximum distance the contractor will be required to skid material is 3,000 feet. The average will likely be 1,000 feet or less.

H.43 Maximum and Average Walk in Distances For units where non-mechanized work is required, the maximum distance the contractor will be required to walk from the road in order to access the unit is 1.5 miles. The average distance will likely be ¼ to ½ mile.

19. Main body of solicitation, Part II – Contract Clauses: A new heading is created in the section

Solicitation AG-82X9-S-08-0120, Amendment 2, pg 5 of 5 that lists clauses by reference. The heading is titled “Pertaining Only to Service and Timber

Harvest Contract Items”. The clauses 52.222-41 Service Contract Act of 1965, as amended (JUL 2005) and 52.222-43 Fair Labor Standards Act and Service Contract Act – Price Adjustment (Multi Year and option Contracts) (MAY1989) are moved from the heading Pertaining Only to Service Contract Items and placed under the new heading.

20. Main body of solicitation, Part II – Contract Clauses, ”Pertaining to All Contract Items”: The clause 52.219-14, Limitations on Subcontracting ( DEC 1996), is deleted from the solicitation.

21. The applicable SCA wage determination is added to the solicitation and has been posted on Fedbizopps: SCA Wage Determiniation # 1976-1351, Revision 33, Date of Revision 5/29/2008.

22. Main body of solicitation, the NAICS small business size standard is changed from $16.5 million to $17.5 million. This change is written into clauses K.2, L.10, and any other place that the size standard is written.

23. Main body of solicitaiton, L.14, Instructions for the Preparation of Technical and Business Proposals (SEP 1999), Letter C, Business Proposal Instructions: # (4) is added and pertains to Large Businesses only. # (4) reads as follows:

Large businesses must submit with their offer an “Individual Contract Plan”, (subcontracting plan) in accordance with clause 52.219-9, Small Business Subcontracting Plan. The plan must also address the additional requirements found in I.9, Enhanced Subcontracting Small Business Requirement.

24. Amendment 1, dated 11/20/2008, Questions and Answers; #26 is corrected by deleting the phrase “See # 24 above” and replacing it with “See # 23 above”. # 32 is corrected by deleting the phrase “See # 32 above” and replacing it with “See # 31 above”.

25. Main body of solicitation, Section B.1 Services and Prices; The bid items in this section contained many numbering errors that have been corrected in attachment 1 to this amendment. Section B.1 Services and Prices in the original solicitation is deleted and replaced with attachment 1 of this amendment. Vendors are to use attachment 1 when submitting their prices for the service work.