ATTACHMENT_4__Sheet_Changes.docx

DOCX document 14 KB Posted

Attached to
Missoula MT Forestry Lab Renovation
Solicitation number
AG-82FT-S-13-0007
Issued by

About this file

Attachment 4 Sheet Changes

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
SF_30 1 .pdf PDF
ATTACHMENT_11__Noise_Control.docx DOCX document
ATTACHMENT_8__Section_L_replacement.docx DOCX document
ATTACHMENT_10__Abatement_Report.pdf PDF
01_AMEND_1_CHANGES_ATTACHMENT_SUMMARY.docx DOCX document
ATTACHMENT_5___Window_Shading_Details_1.pdf PDF
ATTACHMENT_6___Window_Shading_Details_2.pdf PDF
ATTACHMENT_3_entilted_addendum_no.1.doc DOC document
ATTACHMENT_2___4a_RFI_INDIVIDUAL.doc DOC document
ATTACHMENT_13_Access_Control_Specs.doc DOC document
SF_30 1 .pdf PDF
ATTACHMENT_7__SSK-1.pdf PDF
ATTACHMENT_14_Insurance_Clause_added.docx DOCX document
ATTACHMENT_9_Pre-bid_Meeting_Questions.pdf PDF
ATTACHMENT_1_Customer_Survey_Form.docx DOCX document
ATTACHMENT_12_Asbestos_Report.pdf PDF
Section_J_Attachment_2b_Standardl_size_bw_11x17.pdf PDF
Section_J_attachment_4b___RFI_SUMMARY.xlsx XLSX spreadsheet
Section_J_attachment_3a_Submittals_INDIVIDUAL.doc DOC document
Section_J_attachment_3b_Summary_of_Material_Submittals.docx DOCX document
Section_J_attachment_7_Customer_Survey_Form.docx DOCX document
01__RFP_FINAL_DRAFT_.doc DOC document
Section_J_Attachment_6_Wage_Rates__MT64_dvb.txt TXT text file
Section_J_attachment_5_SECTION_H_.doc DOC document
Section_J_Attachment_2a_full_size_bw_22x34.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 Sheet Changes

After a detailed review, this is the change we would like to make:

All Trendwall will be installed after the contract is complete. Sheet 23 is removed.

On Sheet 21 (Sub Sheet No. A2.2) Keynote 18 Should read: Coordinate Finish wall and Ceiling Locations with planned location of trendwall demountable wall system that will be installed after the contract.

On Sheet 21 (Sub Sheet No. A2.2) north south walls between office 218 and 225 , between office 206 and 211 should be shortened by 2 ¾” for wall length of 12’ 9 ¼” to allow for future installation of Trendwall.

On Sheet 94 (Sub Sheet No. E2.2) Key Note 2 should read: Junction box in ceiling for circuit to Trendwall that will be installed after the contract.

On Sheet 95 (Sub Sheet No. E2.2A) Key Note 2 should read: Junction box in ceiling for circuit to Trendwall that will be installed after the contract.

On Sheet 98 (Sub Sheet No. E7.2) Key Note 2 should read: Provide flexible conduit to be installed in Trendwall.

On Sheet 99 (Sub Sheet No. E7.2A) Key Note 1 should read: Provide flexible conduit to be installed in Trendwall.