Attachment 4 Sheet Changes
After a detailed review, this is the change we would like to make:
All Trendwall will be installed after the contract is complete. Sheet 23 is removed.
On Sheet 21 (Sub Sheet No. A2.2) Keynote 18 Should read: Coordinate Finish wall and Ceiling Locations with planned location of trendwall demountable wall system that will be installed after the contract.
On Sheet 21 (Sub Sheet No. A2.2) north south walls between office 218 and 225 , between office 206 and 211 should be shortened by 2 ¾” for wall length of 12’ 9 ¼” to allow for future installation of Trendwall.
On Sheet 94 (Sub Sheet No. E2.2) Key Note 2 should read: Junction box in ceiling for circuit to Trendwall that will be installed after the contract.
On Sheet 95 (Sub Sheet No. E2.2A) Key Note 2 should read: Junction box in ceiling for circuit to Trendwall that will be installed after the contract.
On Sheet 98 (Sub Sheet No. E7.2) Key Note 2 should read: Provide flexible conduit to be installed in Trendwall.
On Sheet 99 (Sub Sheet No. E7.2A) Key Note 1 should read: Provide flexible conduit to be installed in Trendwall.