11. CONTRACT lD CODE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT rA~E l 1
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicabl~)
000002 08/07/2013 641133
6. ISSUED BY CODE 7. ADM INISTERED BY (If other than Item 6) CODE I USDA-Forest Service
RMRM-AQM
Attn: Joseph Lewis 240 West Prospect Rd Fort Collins CO 80526-2098
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, Slate and ZIP Code) (X) SA. AMENDMENT OF SOLICITATION r--: NO.
AG-82FT -S-13-0007
9B. DATED (SEE ITEM 11)
11 July 2013
10A. MODIFICATION OF CONTRACTIORDER NO.
10B. DATED (SEE ITEM 13)
CODE IFACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
~ The above numbered sOlicitation is amended as sel forth in Item 14. The hour and date specified for receipt of Offers D is extended, ~ is nol extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By complating items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which indudes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
D A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authOrity) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM i0A.
D B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in peying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.i03(b).
D
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ~ is not, D is required to sign this document and return ____ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
The following attachments are hereby incorporated into the solicitation.
3 pages attached, Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature ofperson authorized to sign)
15C. DATE SIGNED
1M. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Joseph Lewis
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
(a) Item 1 (Contract 10 Code). Insert the contract type (2) Accounting classification identification code that appears in the title block of Net decrease $ the contract being modified.
NOTE: If there are changes to multiple accounting
(b) Item 3 (Effective date). classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation
(1) For a solicitation amendment, change order, sheet". .
or administrative change, the effective date shall be the issue date of the amendment, (g) Item 13. Check the appropriate box to indicate the change order, or administrative change. type of modification. Insert in the corresponding
(2) . For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
(3) For a modification issued as an initial or (h) ,Item 14 (Description of Amendment/Modification).
confirming notice of termination for the convenience of the Government, the effective (1) Organize amendments or modifications under date and the modification number of the the appropriate Uniform Contract Format (UCF) confirming notice shall be the same as the effective date and modification number of the section headings from the applicable solicitation or contract. The UCF table of initial notice. contents, however, shall not beset forth in this document
(4) For a modification converting a termination for default to a termination for the convenience of (2) Indicate the impact of the modification on the the Government, the effective date shall be the overall total contract price by inserting one of same as the effective date of the termination for the following entries:
default.
(5) For a modification confirming the contacting (i) Total contract price increased by $ officer's determination of the amount due in settlement of a contract termination, the effective (ii) Total contract price decreased by $ date shall be the same as the effective date of the initial decision. (iii) Total contract price unchanged.
(c) Item 6 (Issued By). Insert the name and address of
(3) State reason for modification.
the issuing office. If applicable, insert the appropriate issuing office code in the code block.
(4) When removing, reinstating, or adding funds, identify the contract items and accounting
(d) Item 8 (Name and Address of Contractor). For classifications.
modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
(5) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the
(e) Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. -
Government, the entry in Item 14 of the modification may be limited to -
Dated). Check the appropriate box and in the corresponding blanks insert the number and date (i) A reference to the letter determination; and of the original solicitation, contract, or order.
(ii) A statement of the net amount determined
(f) Item 12 (Accounting and Appropriation Data).
to be due in settlement of the contract.
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following
(6) Include subject matter or short title of solicitation/contract where feasible.
entries.
'j (I) Item 16B. The contracting officer's signature is not
(1) Accounting classification Net increase $ required on sol'icitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
STANDARD FORM 30 (REV, 10·83) BACK
Amendment 2 Questions/Clarifications AG-82FT-S-13-0007
1. Question ~ (Division 270000) Will the cable have to be plenum or non-plenum rated?
Answer ~ lhe cable can be non-plenum rated ..
2. Sheet DA2.0 indicates floor grinding. Can you provide an allowance of square footage required for bidding purposes? Most of the floor is covered with either carpet and/or boxes/stored materials etc and cannot be accurately surveyed.
Answer - Assume 50 sf ea. of grinding for the basement and the first floor for bidding purposes
3. Sheet DA2.1 has note 2 on the eastern sidewalk area Indicating Sidewalk to be removed. The Site plans call for this sidewalk to remain.
Answer - Delete note 2 on sheet DA2.1 ~ Sidewalk shall remain.
4. Sheet S2.0, Note 4 indicates Steel Lintels "See x/SXXX." Please clarify lintel requirements.
Answer - Lintel requirements areshown on 3/S9.1
5. Detail 11/A5.4 (and other exterior wall sections) indicates that the SIPS are to be a full height, existing deck to TOW system. The structural plans (DetaiI4/S2.1) indicate that the SIPS panels are a two piece system. Please clarify.
Answer ~ See attached revised structural Drawings SSK-2 and SSK-3 to replace DetaiI4/S2.1.
S2.1 : S2.1
CONT FULL ---t-~
HEIGHT6~"
SIP
#14@12"OC
16d @ 16" OC
(E) 3xT&G
GRID TO EDGE OF
2x6 PLATE
. 'SIMPSON' A35 @ EA BLKG
2x4 FLAT BLKG
OPEN WEB FLOOR TRUSS,
SEE PLAN
D~_IN~G__~__~~~~~~~~~Lf
, STUD TO ALIGN WI
FLOOR JOIST
(E) 8" CMU -----jjIe,..s,t~;..!........J9'
(E) 2x PLATE WI (E) %"0
BOLT @ 4'-0" OC, ADD (N)
WI BRICK
VENEER
%"0 EPOXY BOLT CENTER
BETWEEN (E) BOLTS
(N) EXT SIP @ (E) EXT WALL
3/4" = 1 '-0"
DRAWING: 4/S2.1
bee
STRUCTURAL
BEAUDETTE
CONSULTING
ENGINEERS, INC.
(406) 721-7315
Rocky Mountain Research Station
Renovation & Addition Missoula MT
I-
I-
---il--------J
---il--------J
2 1--'0=8/=.06=/2=0-'-'13=-----____--1
1 07/15/2013
ADDENDUM #1
BRHDRAWN BY:
SSK-2TRBCHECK BY:
PROJECT NO.: BeE 11-887
CONT FULL --~
HEIGHT6~"
SIP
GRID TO EDGE OF 2x6 PLATE
10d @ 10" OC
OPEN WEB FLOOR TRUSS
SEE PLAN '
2xS CONT LEDGER, GLUE & SCREW WI
2-#Sxm" SCREWS
@ 12"OC
NOTE:
SEE 4/S2.1 FOR
ADDL INFO
6 DETAIL
bee
STRUCTURAL
BEAUDETTE
CONSULTING
ENGINEERS, INC.
(406) 721-7315
52.1 : 59.1 3/4" = 1'_0"
DRAWN BY:---..:
DRAWING: 6/89.1
Rocky Mountain Research Station .-r---~~--~
Renovation & Addition MissoulaMT 2 08/06/2013
1 07l15~/20==1=,....3_
ADDENDUM #1 ---~