ATTACHMENT_2___4a_RFI_INDIVIDUAL.doc

DOC document 35 KB Posted

Attached to
Missoula MT Forestry Lab Renovation
Solicitation number
AG-82FT-S-13-0007
Issued by

About this file

Attachment 2 attachment 4a

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
SF_30 1 .pdf PDF
ATTACHMENT_11__Noise_Control.docx DOCX document
ATTACHMENT_8__Section_L_replacement.docx DOCX document
ATTACHMENT_10__Abatement_Report.pdf PDF
01_AMEND_1_CHANGES_ATTACHMENT_SUMMARY.docx DOCX document
ATTACHMENT_5___Window_Shading_Details_1.pdf PDF
ATTACHMENT_6___Window_Shading_Details_2.pdf PDF
ATTACHMENT_3_entilted_addendum_no.1.doc DOC document
ATTACHMENT_13_Access_Control_Specs.doc DOC document
SF_30 1 .pdf PDF
ATTACHMENT_7__SSK-1.pdf PDF
ATTACHMENT_14_Insurance_Clause_added.docx DOCX document
ATTACHMENT_9_Pre-bid_Meeting_Questions.pdf PDF
ATTACHMENT_4__Sheet_Changes.docx DOCX document
ATTACHMENT_1_Customer_Survey_Form.docx DOCX document
ATTACHMENT_12_Asbestos_Report.pdf PDF
Section_J_Attachment_2b_Standardl_size_bw_11x17.pdf PDF
Section_J_attachment_4b___RFI_SUMMARY.xlsx XLSX spreadsheet
Section_J_attachment_3a_Submittals_INDIVIDUAL.doc DOC document
Section_J_attachment_3b_Summary_of_Material_Submittals.docx DOCX document
Section_J_attachment_7_Customer_Survey_Form.docx DOCX document
01__RFP_FINAL_DRAFT_.doc DOC document
Section_J_Attachment_6_Wage_Rates__MT64_dvb.txt TXT text file
Section_J_attachment_5_SECTION_H_.doc DOC document
Section_J_Attachment_2a_full_size_bw_22x34.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4a

CONTRACT NUMBER:

AG-82FT-C-13-0015

REQUEST FOR

INFORMATION

RFI NUMBER: 1

DATE:

CONTRACT TITLE:

MFSL Renovation

PRIME CONTRACTOR

SUBCONTRACTOR / SUPPLIER:

TITLE OF RFI: Electrical

CONTRACT DOCUMENTS AFFECTED BY THIS RFI (DRAWINGS, DETAILS, SPECS, ETC.):

SPEC SECTION:

DRAWING:

DETAIL:

SPEC PARA:

COST EFFECT

YES

X

NO

INFORMATION REQUIRED:

We are requesting clarification on the following relating to the project listed above.

Sheet E2.1 General Note 1 states that interior GFI mounted receptacles at 42”

Question –

Are all devices to be mounted at 42”?

BLANK FOR NOW

ANSWER PROVIDED BY OWNER and/or REPRESENTATIVE:

Date:

Respondance Signature:

Response is provided on the presumption of no increase in contract price or time