Attachment I.doc
DOC document 66 KB Posted
- Attached to
- Rampart Range Road Maintenance
- Solicitation number
- AG-82BH-S-11-0019
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Answers 2.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Amendment 000001.pdf | ||
| Rampart Range roads maintenance.doc | DOC document | |
| SF 33.pdf | ||
| Attachment II.pdf | ||
| Attachment III.docx | DOCX document | |
| Rampart Range Road Mainenance Package.doc | DOC document | |
| Attachment IV.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work/Technical Specifications 2011 Rampart Range Road Maintenance
PART I – GENERAL
1.1 Summary
A. Furnish all material, equipment, transportation, supervision and labor necessary to provide Level 3 Road Maintenance and erosion control on FR300 six times at various locations, FR320 two times, & the roads within the Monument Work Center once. See Maps & Road Spreadsheet for exact work dates and more information. All work shall be performed in accordance with standard industry practices for this type of work, and in accordance with the drawings & specifications of this contract. Existing conditions of Level 3 roads may be deteriorated and should be looked at individually to determine the level of work needed before bidding.
B. Pay Item 809(02) Water shall be obtained from a commercial source. Water may or may not be needed on all roads and will be used as a last resort if necessary. Use will be determined by the CO at the time of work.
C. Pay Item 860(01) covers all aspects of maintenance required by specifications 860 including surface & drainage maintenance, obstruction removal, vegetative clearing, and minor slough, slides, & slump removal.
D. Traffic Control shall be considered incidental to Pay Item 860(01).
E. Mobilization shall be considered incidental to Pay Item 860(01).
F. Final payment will be based on actual quantities in the field for all pay items.
G. When the work calls for routine blading (road grading) of forest roads, equipment operators with no pervious national forest road maintenance experience shall view a short (18-minute) video on proper road maintenance techniques prior to beginning work. The operator shall work in a manner that closely follow the techniques shown in the video.
1.2 Location of Project:
This project is located on the Pikes Peak Ranger District in the Pike National Forest. FR300 Rampart Range Rd is located east of Woodland Park and northwest of Colorado Springs. MP0.0 is located in Garden of the Gods in Colorado Springs. FR320 Mt. Herman Rd starts at the intersection of FR300 & ends west of Monument. The Monument Fire Center roads are located west of Monument. Refer to the Maps & Road Spreadsheet for a detailed location of each road. All roads are located in El Paso County.
1.3 Equipment Specifications:
A. The equipment to be used to complete the performance of this contract shall meet the following minimum standards.
· Road Grader - Motor patrol, self-propelled, tandem drive, with a mold board not more than fourteen (14) feet or less than twelve (12) feet.
· Backhoe/Loader – Cat 416E or equivalent.
B. All equipment shall be in good repair, and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner. Where applicable, all equipment shall be fitted with approved spark arrestors. If equipment is different from above submit a list with cost proposal. Some equipment that differs from the above requirements may be accepted but may be rejected by the CO. Contractor should discuss equipment questions with the CO before bidding.
C. Upon concurrence from the CO certain areas on the National Forest may be used for storage of equipment and/or materials during active maintenance periods. The contractor shall be responsible for protection of items stored on Government property, and shall ensure adequate safety measures are maintained at such sites.
1.4 Noxious Weeds Prevention and Requirements:
A. All contractor and subcontractors performing work on National Forest System lands are required to use equipment and vehicles free of noxious weed seeds and/or propagating parts capable of producing a new noxious weed plant. This applies to ALL vehicles whether owned, leased or borrowed.
B. This shall be accomplished by washing with a pressurized hose all equipment and vehicles used for construction, maintenance and support work prior to entering the National Forest.
See Specification 171 for specific requirements.
1.5 Signs and Traffic Control Requirements:
In the performance of travel way maintenance, signs shall be located no more than 1 mile before and after the area of operation. Signs shall be posted only when work is in progress. Traffic warning signs shall be provided by the contractor. Cost is incidental and is included in the Pay Items corresponding to the road maintenance work. Signs must conform to the Manual of Uniform Traffic Control Devices (MUTCD). No hand made signs will be allowed. No work shall be allowed to commence until construction signs have been approved by the CO.
1.6 Tractor/Dozer vs. Road Grader:
As a general rule, all Level I and Level II roads should be maintained with a tractor/dozer whereas all Level III roads should be maintained with a road grader (motor patrol). In some instances Level II roads can be maintained with a road grader. This item should be discussed with the CO.
1.7 Definitions:
Base Course - The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Berm - Curb or dike constructed to control roadway runoff water.
Borrow - select material taken from designated sites to build up the roadway or other structures.
Bridge - a structure, including supports, erected over a depression or an obstruction, such as water, road, trail, or railway, and having a deck for carrying traffic or other moving loads.
Catch basin - A flat bottom basin constructed at the culvert inlet to improve the entrance conditions and to provide space for sediment and debris collection and removal.
Cattleguard – A structure constructed on the roadway used as a barrier for livestock. Barriers may be constructed of concrete, steel, or other materials.
Channel - A waterway (either natural or constructed) leading into or away from a culvert or bridge.
CO – Contracting Officer.
COR – Contracting Officer’s Representative.
Crown - The slope of the roadbed away from the centerline to provide for drainage.
Culvert - A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Cushion Material - Native or imported material generally placed over rocky sections of unsurfaced roads to provided a usable and maintainable traveled way.
Ditch - A relatively long narrow excavation placed to collect or disperse water.
· Drainage ditch - A ditch constructed between the traveled way and the adjacent terrain for the purpose of transporting water that leaves the road surface or cut slope.
· Lead-off ditch - A ditch used to remove water from drainage ditches.
· Outlet ditch - A ditch used to provide drainage from culverts, cattleguards, drainage dips, or other structures.
· Intercept ditch - Any ditch which normally parallels the road centerline and diverts water from natural flow patterns to protect road slopes, roadbed, or downslope areas. Intercept ditches may be located within the roadway or roadside, but as used in this definition excludes drainage ditches.
Drainage dip - A uniform depression constructed within the roadbed surface which allows routine passage of vehicles while diverting water from the traveled way.
Drawings - Depictions detailing maintenance contemplated including all road listing diagrams, maps, and performance schedules included in the contract.
Drop Inlet - A vertical conduit used as an inlet to a culvert.
Equipment - All machinery, operating supplies, and tools necessary for the proper performance and acceptable completion of the work.
Excess Material - Material obtained fro maintenance operations on the roadway which is excess to that needed for maintenance of the roadway.
Grade - The vertical rise or fall of the finished surface of a roadway or ditch centerline. Grade is expressed as a percent calculated as rise in feet over run in feet times one-hundred (100).
Inspector – Contracting officer’s official project inspector.
Invert - The bottom of the inside of a conduit or culvert.
Materials - Any substances specified for use in the performance of the work.
Measurement - Method of determining and expressing the quantities of work.
Outslope/inslope - The slope of the roadbed from the cutslope to provide for drainage. Applies to roads without a crown.
Pavement Structure - Subbase, base, or surface course, or combination therof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Right-of-way - A general term denoting land, property, or interest acquired for or devoted to a road.
Roadbed - The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.
Roadside - A general term denoting the area adjoining the outer edge of the roadway.
Roadway - The portion of the road within the limits of excavation and embankment.
Shoulder - The portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of pavement structure.
Slide - A concentrated deposit of materials from above or on the backslope extending onto the traveled way or shoulders that has been deposited by mass land movements.
Slough - Materials eroded or raveled from back slope which partially or completely block the ditch, but do not encroach on the traveled way so as to block vehicular passage.
Slump - A localized portion of the roadbed which has slipped downward or otherwise become lower than that of the adjacent roadbed and constitutes a hazard to traffic.
Subgrade - Top surface of roadbed upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Surface Course - The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and the disintegrating effects of climate.
Trash rack - A structure (usually constructed from vertical bars) which is designed to prevent trash and other debris from entering and blocking a culvert.
Traveled Way - The portion of the roadway provided for the movement of vehicles, exclusive of shoulders on asphalt paved roads. For purpose of this contract, traveled way includes turnouts and curve widening.
Turnouts - A short auxiliary lane provided for passage of on coming vehicles.
Unsuitable material - Material that is not suitable to be incorporated into the work.
Waterbar - A drainage structure constructed across the roadbed surface to divert water from the road surface. Vehicular passage is not a consideration.
TECHNICAL SPECIFICATIONS
171- WEED AND DISEASE PREVENTION - STANDARD SPECIFICATIONS
DESCRIPTION
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
MATERIAL
171.02 Furnish water that is free of substances injurious to plant life such as oils, acids, alkalies, or salts.
CONSTRUCTION REQUIREMENTS
171.03 General
Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water. For work at a commercial washing facility, use an approved facility. Use a high pressure washing system.
171.05 Washing
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection
Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance
Weed prevention will be evaluated under Subsection 106.02 of the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03)
809 - DEVELOPING WATER SUPPLY AND WATERING - STANDARD SPECIFICATIONS
DESCRIPTION
809.01 This work shall consist of furnishing, hauling, and applying water.
MATERIALS
809.02 When the contractor obtains water form other sources, the contractor shall be responsible for obtaining the right to use the water.
WORK REQUIREMENTS
809.03 Developing water supplies and access shall be the responsibility of the contractor.
Mobile watering equipment shall have watertight tanks of known capacity. Equipment used for dust control and finishing operations of subgrade and surfaces shall provide uniform and controlled application of water without ponding or washing. Positive control of water from the driver’s position is required at all times.
Calibrated tanks, distributors, or accurate water meters shall be required if SHOWN ON THE DRAWINGS.
MEASUREMENT
809.04 The method of measurement will be measured as designated in the SCHEDULE OF ITEMS and in accordance with the following:
· Lump sum. Denotes one complete unit of work completed and accepted, including necessary materials, equipment, and labor to complete the job.
· Gallons
· Thousand Gallons (M. Gal.)
When the SCHEDULE OF ITEMS calls for “Developing Water Supply and Water,” the cost of developing the supply shall be included in the unit price for the quantity of water delivered.
860 - LEVEL 3 ROAD MAINTENANCE - STANDARD SPECIFICATIONS
DESCRIPTION
860.01 The maintenance work to be performed shall include work necessary to keep drainage functional and maintain the road prism to allow a prudent driver to safely negotiate the road in a passenger car.
WORK REQUIREMENTS
860.02 Drainage
This work shall consist of cleaning culverts and drainage dips and related items such as catch basins, outlet ditches, lead-off ditches, trash racks, drop inlets, headwalls, aprons, and riprap.
Drainage structures and related items shall be cleared of all foreign material and all vegetative growth which interferes with the flow pattern. Grass shall be left in place provided drainage is not obstructed.
Culverts shall have their inlet and outlet cleaned as well as three (3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert. If debris is lodged in the culvert to the extent it cannot be cleaned by shovel, bar, and hand labor, the CO shall be notified of the location within 5 working days for a final determination of corrective measures to be taken.
Unless otherwise SHOWN ON THE DRAWINGS, catch basins shall be cleared of material to the bottom of the invert of the culvert and at least eighteen (18) inches horizontally towards the backslope or the width of the basin, whichever is greater. The backslope shall be cleaned of loose material.
Inlet channel transition from the ditchline to the catch basin shall be cleaned. Material removed, if suitable, may be blended into existing native road surfaces or shoulders. On aggregate surfaced roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS. Sidecasting into streams, lakes or water courses will not be permitted.
Ditches shall be cleaned to conform to previous line, grade, and cross section. Cleaning is not required on ditches that provide drainage and are free of debris larger than three (3) inches in diameter and one (1) foot in length. On aggregate surfaced roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS.
Drainage dip maintenance consists of cleaning and installing dips. Drainage dips shall be shaped to a depth and width to provide drainage and reasonable conformity to the original lines, grades, and cross sections, unless otherwise SHOWN ON THE DRAWINGS or designated on the ground. Hand work may be necessary to obtain a smooth surface and uniform cross section. Lead-off ditches shall be cleaned or installed and shall daylight. Material generated from the lead-off ditches shall be blended into existing road surfaces or shoulders. On aggregate surfaced roads, care must be taken to assure the Material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS.
860.03 Removal of Obstructions
Unless otherwise SHOWN ON THE DRAWINGS, loose rocks which extended more than three (3) inches above the road surface shall be removed or repositioned to provide adequate clearance for vehicular travel. Logs and downed trees shall be cut over the entire width of the traveled way to provide opening for vehicular travel. Logs and downed trees shall be cut into short lengths and placed outside the roadway. Slash shall be scattered outside the roadway and drainage ways. Rocks and other objects outside the usable width may remain, if drainage is not obstructed.
860.04 Removal of Vegetation
Brush, Trees, and limbs shall be removed within the designated area SHOWN ON THE DRAWINGS or designated on the ground to provide Unobstructed roadway prism, including turnouts, ditches, and other drainage facilities. the traveled way shall be free of encroaching limbs to a height of 12 feet above the traveled way surface.
Unless otherwise SHOWN ON THE DRAWINGS, brush and trees less than four (4) inches in diameter within the designated area adjacent to the traveled way shall be cut to a maximum height of six (6) inches above the ground surface or obstructions such as rocks or stumps.
Trees within the designated area in excess of four (4) inches in diameter when measured six (6) inches above the ground shall be limbed so that no limb extends into the designated area or over the roadbed. Tree limbs shall be trimmed as near flush with the trunk as practicable.
Brush and trees designated for removal within the designated traveled way shall be cut parallel and as close to the ground as practicable or to a maximum of one (1) inch above the elevation of the road surface. Vegetation shall be cut over the entire width of the traveled way or to the maximum width SHOWN ON THE DRAWINGS, or as designated on the ground.
Signs, markers, and other road appurtenances are designated to be retained.
Work may be performed by hand or mechanically. Self-propelled equipment shall not be allowed on cut and fill slopes or in ditches unless otherwise SHOWN ON THE DRAWINGS.
Any damage to trunks of standing trees caused by Contractor's operation shall be treated with a commercial nursery sealer or removed as designated by the CO.
Limbs, chunks, and debris in excess of one (1) foot in length or three (3) inches in diameter shall be scattered outside the roadway. Concentrations of slash and debris greater than eighteen (18) inches above the ground will not be permitted.
Slash and debris shall not be placed in live streams.
860.05 Sloughs, Slides and Slumps
Minor sloughs, slides, and slumps that are less than five (5) cubic yards per one-hundred (100) foot station, shall be removed or repaired. If quantity exceeds five (5) cubic yards per one-hundred (100) foot station, the CO shall be notified of the location within 5 working days for a final determination of corrective measures to be taken. Minor slough and slide material, including soil, rock, and vegetative matter which encroaches onto the ditches, roadway or shoulder and which obstructs drainage shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS. Sidecasting into streams, lake or water courses will not be permitted.
Minor slumps and washouts shall be filled with material generated from the adjacent area or as otherwise SHOWN ON THE DRAWINGS. Material shall be placed in layers not to exceed eight (8) inches in depth and compacted by operating equipment over each layer.
860.06 Traveled way
The roadbed shall be crowned or sloped to conform to the original prism. All berms generated shall be removed from the shoulders and incorporated into the traveled way surface except those that are specifically designated to remain. Turnouts shall also be included with the blading of the road surface.
On roads open to public traffic, berms of materials caused by road maintenance operations shall be removed from the traveled way prior to the end of each day's work.
The blading shall proceed in an orderly fashion by successive passes with graders parallel to the road centerline, progressing from the lower side to the upper side of the roadbed and back across. In the process, shoulder material shall be cut and replaced to prevent vegetation encroachment.
On native surface roads, all ruts, holes, washes and washboards shall be removed by scarifying or cutting to the bottom of such defects. Fines accumulated in blading roads or from drainage ditches shall not be wasted over fill shoulders.
On aggregate surface roads, all ruts, holes, washes and washboards shall be removed by scarifying or cutting to the bottom of the aggregate surface. Scarification of subgrade material will not be permitted unless SHOWN ON THE DRAWINGS.
Rocks or other material remaining on the traveled way after the final blading that fail to pass a 4-inch sieve or are larger than the maximum size of imported surfacing shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS.
Sidecasting into streams, lakes or water courses will not be permitted.
The roadbed immediately before and after cattleguards and bridges shall be bladed in such a manner as to effect a smooth transition. Material shall not be deposited inside cattleguards or onto bridges. Any material deposited on bridge decks or inside cattleguards, including any accumulated material, shall be removed.
Intersecting roads shall be bladed for a distance of 50 feet to assure proper transition of the two riding surfaces.
MEASUREMENT
860.07 Level 3 Road Maintenance will be measured to the nearest one-tenth (0.1) mile as measured by a calibrated vehicle distance measuring device along the road centerline.
File details come from the government source that posted it. Updated .