CompiledSchedules.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
Lolo Forestwide Exterior Painting
Solicitation number
AG-82B1-S-10-0293
Issued by

About this file

AG-82B1-S-10-0293 Compiled schedules

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
NINE MILE: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING AND BLD.TRIMPAINT WINDOW TRIM & SILLPAINT DOORS & EXT.JAMBSPAINT EXTERIOR DOOR TRIMPAINT PORCH CEILINGS,POSTS, RAILINGSPAINT PORCH & DECK FLOORSPAINT METAL HARDWARESTAIN ROOF SHINGELSTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1008 Fire OfficeWhiteWhiteWhiteWhiteWhiteGreyNAGreenNLISTED
# 1017 East ResidenceWhiteWhiteWhiteWhiteWhiteGreyNAGreenYLISTED
# 1018 West ResidenceWhiteWhiteWhiteWhiteWhiteGreyNAGreenYLISTED
# 1019 North ResidenceWhiteWhiteWhiteWhiteNANANANAYLISTED
# 1507 North GarageWhiteWhiteWhiteWhiteNANANANANLISTED
# 1509 Engine GarageWhiteWhiteWhiteSee NotesNANANANANLISTED
# 2114 Main OfficeWhiteWhiteWhiteWhiteWhiteGreyNAGreenNLISTED
# 2013 Visitor CenterWhiteWhiteWhiteWhiteWhiteNANAGreenNLISTED
# 2002 Timber Fire OfficeWhiteWhiteWhiteWhiteWhiteGreyNAGreenNLISTED
# 2101 Blacksmith ShopWhiteWhiteWhiteWhiteNANAWhiteNANLISTED
# 2103 Tack ShopWhiteWhiteWhiteWhiteNANABlackNANLISTED
# 2402 Large BarnWhiteWhiteWhiteWhiteNANABlackGreenNLISTED
# 2403 Stud BarnWhiteWhiteWhiteWhiteNANABlackGreenNLISTED
# 2503 Oil HouseWhiteWhiteWhiteWhiteWhiteNABlackNANLISTED
# 1507 North Storage ShedWhiteWhiteWhiteWhiteNANANANANLISTED
Two Entry Gate ColumnsWhiteNANANABlackGreenNLISTED
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
NINE MILE: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1008 Fire OfficeScrap, prep/ paint entire building white. No paint on lattice or foundation. Clean but do not paint electrical service. Terminate ext. window trim painting were trim meets window jamb.
# 1017 East ResidenceScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 1018 West ResidenceScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 1019 North ResidenceScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 1507 North GarageScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 1509 Engine GarageScrap, prep/ paint entire building white.Terminate ext. window trim painting were trim meets the window jamb. Paint 1x4 trim on face of Over Head Garage doors green.
# 2114 Main OfficeScrap, prep/ paint entire building white. Scrap, prep/ paint steel basement entry door green. Terminate ext. window trim painting were trim meets the window jamb.
# 2013 Visitor CenterScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 2002 Timber Fire OfficeScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 2101 Blacksmith ShopScrap, prep/ paint entire building white. Scrap, prep/paint all sliding metal door hardware white.
# 2103 Tack ShopScrap, prep/ paint entire building white. Scrap, prep/paint all bars on metal door and all hardware black. No work on entry deck. Terminate ext. window trim painting were trim meets the window jamb.
# 2402 Large BarnScrap, prep/ paint entire building white. No work on foundation or roof ventilators. Terminate ext. window trim painting were trim meets the window jamb. North elev. Stairway to be removed by others. Paint North elev. wall bracket white.
# 2403 Stud BarnScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
# 2503 Oil HouseScrap, prep/ paint entire building white. Paint all doors, but not back deck or bumpers. Paint interior fo covered area white. Paint S. Elev. structural brackets white
# 1507 North Storage ShedScrap, prep/ paint entire building white. Terminate ext. window trim painting were trim meets the window jamb.
Two Entry Gate ColumnsScrap, prep/ paint siding, eves white, Stain wood roof shingles green.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SAVENAC: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING AND BLD. TRIMPAINT EXT. WINDOW TRIMPAINT DOORS, EXT.JAMBS & TRIMPAINT PORCH CEILINGS, POSTS,RAILINGSPAINT PORCH & DECK FLOORSPAINT METAL HARDWARESTAIN ROOF SHINGELSTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1016 West Cottage w/Garage /BreezewayWhiteWhiteWhiteWhiteNANANAYLISTEDIncludes breezeway
# 1020 East Cottage w/Garage /BreezewayWhiteWhiteWhiteWhiteNANANAYLISTEDIncludes breezeway
# 1301 BunkhouseWhiteWhiteWhiteWhiteGreyNANAYLISTED
# 1400 Dining HallWhiteWhiteWhiteWhiteGreyNANANLISTED
# 2012 Admin. BuildingWhiteWhiteWhiteWhiteNANANANLISTED
# 2202 ShopWhiteWhiteWhiteNANANANANLISTED
# 2315 GarageWhiteWhiteWhiteNANANANANLISTED
# 2316 Hydro/ElectricWhiteWhiteWhiteNANANANANLISTED
# 2608 Seed StorageWhiteWhiteWhiteNANANANANLISTED
# 2611 Tree CoolerWhiteWhiteWhiteWhiteNANANANLISTED
# 2813 Hose HouseWhiteWhiteWhiteNANANANANLISTED
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SAVENAC: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1016 West CottageScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 1020 East CottageScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 1301 BunkhouseScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 1400 Dining HallScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 2012 Admin. BuildingScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 2202 ShopScrap/prep/paint approximately 20% of all exterior painted surfaces. Areas to be determined by CO. No work on foundations.
# 2315 GarageScrap/prep/paint approximately 20% of all exterior painted surfaces. Areas to be determined by CO. No work on foundations.
# 2316 Hydro/ElectricScrap/prep/paint approximately 20% of all exterior painted surfaces. Areas to be determined by CO. No work on foundations.
# 2608 Seed StorageScrap/prep/paint all exterior painted surfaces. No work on foundations.
# 2611 Tree CoolerScrap/prep/paint approximately 20% of all exterior painted surfaces. Areas to be determined by CO. No work on foundations.
# 2813 Hose HouseScrap/prep/paint approximately 20% of all exterior painted surfaces. Areas to be determined by CO. No work on foundations.
# 1016 West CottageScrap/prep/paint all exterior painted surfaces. No work on foundations.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
PLAINS: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING AND TRIMPAINT BLD. TRIM, EVE BRAKETS & FASCIAPAINT DOORS, EXT.JAMBS & TRIMPAINT PORCH CEILINGS,POSTS,RAILINGSPAINT PORCH & DECK FLOORSPAINT METAL HARDWARESTAIN ROOF SHINGELSTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1012 Middle ResidenceWhiteGreenWhiteNANANANAYNot Eligible
# 1013 West ResidenceWhiteGreenWhiteNANANANAYNot Eligible
# 1044 East ResidenceWhiteGreenWhiteNAGreyNANAYNot Eligible
# 1303 BunkhouseNANANANANANANANANot EligibleNIC
# 1501 GarageWhiteGreenWhiteNANANANANNot Eligible
# 1502 East GarageWhiteGreenWhiteNANANANANNot Eligible
# 2008 Main OfficeWhiteWhiteWhiteWhiteGreyNANANNot Eligible
# 2301 Powder MagazineNANANANANANANANANot EligibleNIC
# 2301 Fire Cahe Wood ShopWhiteGreenWhiteNANANANANNot Eligible
# 2313 Garage ShopWhiteGreenWhiteNANANANANNot Eligible
# 2412 Barn/StorageWhiteGreenWhiteNANANANANNot Eligible
# 2501 Paint StorageWhiteGreenWhiteWhiteNANANANNot Eligible
# 2511 Gas HouseWhiteGreenWhiteNANANANANNot Eligible
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
PLAINS: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1012 Middle ResidenceScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 1013 West ResidenceScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 1044 East ResidenceScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 1303 BunkhouseNO WORK ON THIS STRUCTURE
# 1501 GarageScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 1502 East GarageScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 2008 Main OfficeScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. Remove and reinstall storm windows at basement. No work on foundations.
# 2301 Powder MagazineNO WORK ON THIS STRUCTURE
# 2301 Fire Cahe Wood ShopScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 2313 Garage ShopScrap/prep/paint all exterior painted surfaces. Paint up to exterior window stops. No work on foundations.
# 2412 Barn/StorageScrap/prep/paint all exterior painted surfaces. No stain/paint on cedar roof shingles. No work on foundations.
# 2501 Paint StorageScrap/prep/paint all exterior painted surfaces. Finishes may be spray applied. No work on foundations.
# 2511 Gas HouseScrap/prep/paint all exterior painted surfaces. No work on foundations.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SUPERIOR: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING & EVESPAINT BLD. TRIM, EVE BRAKETS & FASCIAPAINT DOORS & EXTERIOR JAMBSPAINT EXTERIOR DOOR TRIMPAINT WINDOW TRIM & SILLPAINT PORCH CEILINGS,POSTS,RAILINGSPAINT PORCH & DECK FLOORSPAINT METAL FIXTURESTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1014 ResidenceWhiteGreenWhiteGreenGreenWhiteNAGreenYEligible
# 1510 Garage #2WhiteGreenWhiteGreenGreenWhiteNAGreenNEligible
# 2003 Fire CrewWhiteGreenWhiteGreenGreenWhiteGreyGreenNNot Eligible
# 2104 Barn/ShopWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
# 2212 Lumber ShedWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
# 2306 Gar. Fire CacheWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
# 2504 Gas and OilWhiteGreenWhiteGreenGreenWhiteNAGreenNNot Eligible
# 2621 Tree CoolerWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SUPERIOR: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1014 ResidenceScrap/prep/paint all exterior painted surfaces/fixtures. No work on foundations.
# 1510 Garage #2Scrap/prep/paint all exterior painted surfaces exept for OH. Garage door. No work on foundations.
# 2003 Fire CrewScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
# 2104 Barn/ShopScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
# 2212 Lumber ShedScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
# 2306 Garage Fire CacheScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
# 2504 Gas and OilScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
# 2621 Tree CoolerScrap/prep/paint all exterior painted surfaces,railigs & fixtures. No work on foundations.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
ST.REGIS: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING & EVESPAINT BLD. TRIM, EVE BRAKETS & FASCIAPAINT DOORS & EXT.JAMBSPAINT EXT. DOOR TRIMPAINT WINDOW TRIM & SILLPAINT PORCH CEILINGPAINT PORCH & DECK FLOORSPAINT METAL FIXTURESTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1307 W. BunkhouseWhiteGreenWhiteGreenGreenNANAGreenYNot Eligible
# 1308 M. BunkhouseWhiteGreenWhiteGreenGreenNANAGreenYNot Eligible
# 2314 Garage StorageWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
# 1059 ResidenceWhiteGreenWhiteGreenGreenNANAGreenYEligible
# 1307 Res. GarageWhiteGreenWhiteGreenGreenNANAGreenNNot Eligible
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
ST. REGIS: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1307 Women's BunkhouseScrap/prep/paint all exterior painted surfaces,railings & fixtures. Finishes may be spray applied. No work on foundations.
# 1308 Men's BunkhouseScrap/prep/paint all exterior painted surfaces,railings & fixtures. Finishes may be spray applied. No work on foundations.
# 2314 Garage StorageScrap/prep/paint all exterior painted surfaces,railings & fixtures. Finishes may be spray applied. No work on foundations.
# 1059 ResidenceScrap/prep/paint all exterior painted surfaces,railings & fixtures. No work on foundations.
# 1307 Res. GarageScrap/prep/paint all exterior painted surfaces,railings & fixtures. No work on foundations.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SEELEY: SITE FINISH SCHEDULE3
BUILDING #STAIN SIDING/EVESPAINT EXT. BLD.TRIMPAINT FASCIAPAINT WINDOW TRIMPAINT DOORS & JAMBSPAINT DOOR TRIMPAINT PORCH CEILINGS,POSTS,RAILINGSPAINT PORCH & DECK FLOORSTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
# 1007 North ResidenceNANABrownRedNANANANAYEligible
# 1033 South ResidenceBrownRedRedRedBrownRedBrownClear SealerYEligible
# 1034 Log ResidenceBrownRedRedRedBrownRedBrownNAYEligible
# 1305 Historic BunkhouseBrownRedRedRedBrownRedBrownNANEligible
# 1315 North BunkhouseLight BrownLight BrownLight BrownBrownBrownBrownBrownBrownYNot Eligible
# 1316 South BunkhouseLight BrownLight BrownLight BrownBrownBrownBrownBrownBrownYNot Eligible
# 1503 South Res. GarageClearClearNAClearClearClearNANANEligible
# 2005 OfficeNANANANANANANANANANot EligibleNIC
# 2006 Historic OfficeBrownRedRedRedBrownRedBrownNANEligible
# 2204 Historic Fire CacheBrownRedRedRedBrownRedNANANEligible
# 2207 Log Carpenter ShopBrownRedRedRedBrownRedNANANEligible
# 2214 WarehouseLight BrownLight BrownLight BrownLight BrownBrownLight BrownLight BrownNANNot Eligible
# 2307 Pole Vehicle ShedBrownRedRedNANANANANANNot Eligible
# 2321 Tree CoolerLight BrownLight BrownLight BrownBrownBrownBrownNANANNot Eligible
# 2325 Bunkhouse StorageLight BrownLight BrownLight BrownBrownBrownBrownNANANNot Eligible
# 2408 Historic Barn Rec.BrownRedRedRedBrownRedNANANEligible
# 2615 Plumbing / ToolBrownRedRedRedBrownRedNANANEligible
# 2616 Oil Paint ShopBrownRedRedRedBrownRedNANANEligible
# 2620 Seed ShedLight BrownBrownLight BrownBrownBrownBrownNANANNot Eligible
# 4257 WalkwayWalkway Roof Structure: Stain Light BrownNNot Eligible
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
SEELEY: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
# 1007 North ResidenceScrap/prep/paint fascia, eves and window trim. No work on remaining building components.
# 1033 South ResidenceScrap/prep/stain all siding. Scrap/prep/paint all trim. Clean/prep/seal unfinished decks.
# 1034 Log ResidenceScrap prep/stain all siding. Scrap/prep/paint all trim and wood fascia.
# 1305 Historic BunkhouseScrap/prep/stain all siding and eves. Scrap/prep/paint all trim, wood fascia and doors.
# 1315 North BunkhouseScrap/prep/stain all siding, eves, fascia, entryways and decks . Scrap/prep/paint all trim and doors. Finishes may be spray applied.
# 1316 South BunkhouseScrap/prep/stain all siding, eves, fascia, entryways and decks . Scrap/prep/paint all trim and doors. Finishes may be spray applied.
# 1503 South Res. GarageScrap/prep/stain all exterior wall surfaces.
# 2005 OfficeNO WORK ON THE STRUCTURE
# 2006 Historic OfficeScrap/prep/stain all siding and eves. Scrap/prep/paint all trim, wood fascia and doors.
# 2204 Historic Fire CacheScrap/prep/stain all siding and eves. Scrap/prep/paint all trim, wood fascia and doors.
# 2207 Log Carpenter ShopScrap/prep/stain all siding and eves. Scrap/prep/paint all trim, wood fascia and doors.
# 2214 WarehouseScrap/prep/stain all siding , eves, fascia and trim. Scrap/prep/paint all doors and jambs. Finishes may be spray applied.
# 2307 Pole Vehicle ShedScrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia. Finishes may be spray applied.
# 2321 Tree CoolerScrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia. Finishes may be spray applied.
# 2325 Bunkhouse StorageScrap/prep/stain all siding and eves . Scrap/prep/paint all trim. Finishes may be spray applied.
# 2408 Historic Barn Rec.Scrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia. No work on roof surfaces.
# 2615 Plumbing / ToolScrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia.
# 2616 Oil Paint ShopScrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia.
# 2620 Seed ShedScrap/prep/stain all siding and eves . Scrap/prep/paint all trim and wood fascia. Paint/Stain may be spray applied
# 4257 WalkwayPrep/stain all roof framing components that rest on and above the horizontal double 2 x 12 headers. Prep/paint all wood fascia. Finishes may be spray applied.
GENERAL NOTES:
1. Contractor shall remove, clean, reinstall and paint all removable gutter systems.
2. Contractor shall clean, prep & paint up to and in place all seamless aluminum style gutters.
3. All needed wood repairs or component replacements to be performed by others and at the Governments option.
4. Contractor shall neutralize all mold/mildew prior to the application of finish systems.
5. Forest Service crew shall remove and reinstall all shutters
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
MISSOULA: SITE FINISH SCHEDULE3
BUILDING #PAINT SIDING AND TRIMPAINT WINDOW EXTERIOR TRIMPAINT DOORS, EXT.JAMBS & TRIMPAINT PORCH CEILINGPAINT PORCH & DECK FLOORSPAINT METAL HARDWARESTAIN ROOF SHINGELSTARGET HOUSING1 Y/NPRESERVATION STANDARD2NOTES
SITE #1: 14th and Catlin
# 2106 Missoula StorageBeigeBeigeBeigeNANANANANListed
SITE #2 Fort Missoula
# 2018 Building 24NANABeigeBeigeNANANANNot EligibleMetal Bldg.
NOTES:
1)Lead waste generated from facilities designated as Non Target per HUD standards shall be disposed of in an approved Hazardous waste facility.
2)Historical Status of Buildings from the 2009 USDA Forest Service Northern Region Historic Structure Assessment and Historic Preservation Plan.
3)Also refer to "Detail Notes,Site Finish Schedule", For additional information for each building.
LOLO NATIONAL FOREST
FOREST WIDE ADMIN SITE PAINT WORK
MISSOULA: SITE FINISH SCHEDULE
BUILDING #DETAIL NOTES
SITE #1: 14th and Catlin
# 2106 Missoula StorageScrape/pressure wash/prep/paint entire structure (excluding roof surfaces). Finishes may be spray applied.
SITE #2 Fort Missoula
# 2018 Building 24Scrape/prep/paint wood beams above the second floor balcony, exterior surfaces of wood/metal doors and jambs.
GENERAL NOTES: 1. All needed wood repairs or component replacements to be performed by others and at the Governments option.
2. Contracror shall neutralize all mold/mildew prior to the application of finish systems.

SUPPLIMENT TO LOLO NATIONAL FOREST ARRA FOREST WIDE PAINTING PROJECT.

INCLUDES: Site finish Schedules and Site Finish Schedule Detai Notes

Sheet2

Sheet3

File details come from the government source that posted it. Updated .