LOLO NATIONAL FOREST AG-82B1-S-10-0293

ADMIN SITE PAINT WORK PAGE 5 OF 60

SECTION B – SERVICES AND PRICES

SECTION C - DESCRIPTION AND SPECIFICATIONS

452.211-72 Statement of Work/Specifications. (FEB 1988) 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

SECTION D: PACKAGING AND MARKING

SECTION E: INSPECTION AND ACCEPTANCE

52.246-12 Inspection of Construction. (APR 1996)

SECTION F: DELIVERIES OR PERFORMANCE

52.211-10 Commencement, Prosecution, and Completion of Work. (ALT I)(APR 1984) 452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)

SECTION G: CONTRACT ADMINISTRATION DATA

452.236-77 Emergency Response. (NOV 1996)

SECTION I: CONTRACT CLAUSES

52.222-8 Payrolls and Basic Records. (FEB 1988) 52.222-50 Combating Trafficking in Persons. (FEB 2009) 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009.

(MAR 2009)

52.204-7 Central Contractor Registration. (APR 2008) 52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009) 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American

Act--Construction Materials. (MAR 2009) 52.244-6 Subcontracts for Commercial Items. (AUG 2009) 452.228-70 Alternative Forms of Security. (NOV 1996)

SECTION J: LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION K: REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF

OFFERORS OR RESPONDENTS

52.204-8 Annual Representations and Certifications. (FEB 2009) 52.209-5 Certification Regarding Responsibility Matters. (DEC 2008) 52.223-13 Certification of Toxic Chemical Release Reporting. (AUG 2003)

SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

52.216-1 Type of Contract. (APR 1984) 52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005) 52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods--Buy

American Act--Construction Materials. (MAR 2009) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) 52.228-1 Bid Guarantee. (SEP 1996) 52.233-2 Service of Protest. (SEP 2006) 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)

ADMIN SITE PAINT WORK PAGE 6 OF 60

SECTION B – SERVICES AND PRICES

LOLO NATIONAL FOREST ADMIN SITE PAINT WORK

B-1 SCHEDULE OF ITEMS

LINE

ITEM

SITE /

DISTRICT BUILDING # BUILDING NAME

METHOD

OF

MEASURE UNIT QUANITY

LINE ITEM

COST TOTAL

1 FORT 2106 Supervisors Office AQ LS 1

2 CATLIN 2018 District Warehouse AQ LS 1

3 NINEMILE 1009 Fire Office AQ LS 1

4 Admin. 1017 East Residence AQ LS 1

5 1018 West Residence AQ LS 1

6 1019 North Residence AQ LS 1

7 1507 North Garage AQ LS 1

8 1509 Engine Garage AQ LS 1

9 2002 Main Office AQ LS 1

10 2013 Visitor Center AQ LS 1

11 2014 Timber fire office AQ LS 1

12 2101 Blacksmith Shop AQ LS 1

13 2103 Tack Shop AQ LS 1

14 2402 Large Barn AQ LS 1

15 2403 Stud Barn AQ LS 1

16 2503 Oil House AQ LS 1

17 sign Entrance covered Sign AQ LS 1

18 PLAINS 1012 Middle Residence AQ LS 1

19 Admin. 1013 West Residence AQ LS 1

20 1044 East Residence AQ LS 1

22 1501 Middle Residence Garage AQ LS 1

23 1502 East Residence Garage AQ LS 1

24 2008 Main Office AQ LS 1

25 2310 Fire Cahe Wood Shop AQ LS 1

ADMIN SITE PAINT WORK PAGE 7 OF 60

26 2313 Garage / Shop AQ LS 1

27 2412 Barn /Storage AQ LS 1

28 2501 Paint Storage AQ LS 1

29 2633 Haz Storage AQ LS 1

30 SEELEY 1007 North Residence AQ LS 1

31 Admin. 1033 South Residence AQ LS 1

32 1034 Log Residence AQ LS 1

33 1305 Historic Bunkhouse AQ LS 1

34 1315 North Bunkhouse AQ LS 1

35 1316 South Bunkhouse AQ LS 1

36 1503 South Res Garage AQ LS 1

37 2005 Office AQ LS 1

38 2006 Historic Office AQ LS 1

39 2204 Historic Fire Cache AQ LS 1

40 2207 Log Carpenter Shop AQ LS 1

41 2214 Warehouse AQ LS 1

42 2307 Pole Vehicle Shed AQ LS 1

43 2321 Tree Cooler AQ LS 1

44 2325 Bunkhouse Storage AQ LS 1

45 2408 Historic Barn Rec AQ LS 1

46 2615 Plumbing / Tool AQ LS 1

47 2616 Oil Paint Shop AQ LS 1

48 2620 Seed Shed AQ LS 1

49 4257 Walkway AQ LS 1

50 SUPERIOR 1014 Residence AQ LS 1

51 Admin. 1510 Residence Garage AQ LS 1

52 2003 Fire Crew AQ LS 1

53 2104 Barn/Shop AQ LS 1

54 2212 Lumber Shed AQ LS 1

55 2306 Garage / Fire Cache AQ LS 1

56 2504 Gas and Oil AQ LS 1

ADMIN SITE PAINT WORK PAGE 8 OF 60

57 2621 Tree Cooler AQ LS 1

58 Savenac 1016 West Cottage w/ Garage AQ LS 1

59 1020 East Cottage w/Garage AQ LS 1

60 1301 Bunkhouse AQ LS 1

61 1400 Dining Halll AQ LS 1

62 2012 Admin Building AQ LS 1

63 2202 Shop AQ LS 1

64 2316 Hydro/Elect AQ LS 1

65 2608 Seed Storage AQ LS 1

66 2611 Tree Cooler AQ LS 1

67 2813 Hose House AQ LS 1

68 St Regis 2314 Garage / Warehouse AQ LS 1

69 1059 Ranger Residence AQ LS 1

70 1307 Womens Bunkhouse AQ LS 1

71 1308 Mens Bunkhouse AQ LS 1

72 1307 Residence Garage AQ LS 1

TOTAL

Contractor Name: Phone:

Signature: Fax:

Email:

Address: Tin:

City, State, Zip: DUNS:

B- 1: Bid on all items. Only quotes to the nearest cent will be accepted.

B-2 - Note: Payment for Bond Premiums: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payment Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

ADMIN SITE PAINT WORK PAGE 9 OF 60

SECTION C - DESCRIPTION AND SPECIFICATIONS

C-1 – PROJECT DESCRIPTION AND LOCATION

(a) Description of Work: The project consists of providing all labor and materials for performing exterior maintenance painting work on approximately 72 buildings at six Lolo National Forest administrative sites. Many of the buildings identified are either eligible or listed on the national Register of Historic Places. The work to be done on most buildings will also include lead paint mitigation measures as required for painting surface preparation to be done in compliance with all related safety and environmental regulations.

(b) Project location: Sites included are located from approximately 30 minutes to 2 hours driving time from Missoula, MT. Project sites are located at several sites on the Lolo National Forest in western Montana. Sites include Ninemile Ranger Station approximately 20 miles west of Missoula, MT; Seeley Lake Ranger Station near Seeley Lake, MT; Plains Ranger Station, Plains, MT; St. Regis Work Center near St. Regis , MT; and Savenac Tree Nursery near Haugan, MT

(c) Price Range: $250,000 - $500,000

(d) Pre bid Tour: See Section L

(e) Pre bid Conference: None

(f) Start of Work: The Forest Service anticipates issuing the notice to proceed not later than June 1, 2010.

(g) Period of Performance (See Part I, section F, Clause 52.211-10)

C-3 – PROJECT SPECIFICATIONS

The Project Specifications listed in the Specification paperwork are applicable to this contract and are physically included in this Section (C).

NOTE THAT THE SPECIFICATION LIST INCLUDES THE MAJOR

SPECIFICATIONS APPLICABLE TO THIS PROJECT. OTHER

SPECIFICATIONS REFERRED TO WITHIN THESE SPECIFICATIONS (EVEN

THOUGH NOT SPECIFICALLY LISTED HEREIN) ARE ALSO FULLY

APPLICABLE TO THIS INVITATION FOR BIDS AND ANY RESULTANT

CONTRACT.

452.211-72 Statement of Work/Specifications. (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of Clause)

ADMIN SITE PAINT WORK PAGE 10 OF 60

452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

ADMIN SITE PAINT WORK PAGE 11 OF 60

SECTION D: PACKAGING AND MARKING

NO CLAUSES ARE INCLUDED IN THIS SECTION

ADMIN SITE PAINT WORK PAGE 12 OF 60

SECTION E: INSPECTION AND ACCEPTANCE

52.246-12 Inspection of Construction. (APR 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not -

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.

The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the

ADMIN SITE PAINT WORK PAGE 13 OF 60

Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may -

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately.

Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

(End of clause)

ADMIN SITE PAINT WORK PAGE 14 OF 60

SECTION F: DELIVERIES OR PERFORMANCE

52.252-2 -- Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR www.arnet.gov/far/ AGAR http://www.da.usda.gov/procurement/policy/agar.html

(End of Clause)

52.211-18 Variation in Estimated Quantity. (APR 1984) 52.242-14 Suspension of Work. (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work. (ALT I)(APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than July 31, 2010 The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by June 1, 2010. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)

Within [15 ] calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved is. 40 Hours/week

ADMIN SITE PAINT WORK PAGE 15 OF 60

SECTION G: CONTRACT ADMINISTRATION DATA

G-1 - CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer (CO) will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the prework conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the

Contracting Officer. The term "Contracting Officer" as used throughout the Specifications, shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.

ADMIN SITE PAINT WORK PAGE 16 OF 60

SECTION H: SPECIAL CONTRACT REQUIREMENTS

H- 1 - Fire Control

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

ADMIN SITE PAINT WORK PAGE 17 OF 60

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards;

(b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use. One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times. Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

ADMIN SITE PAINT WORK PAGE 18 OF 60

(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.

All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(12) Pump and Trailer. The Contractor shall provide at a location satisfactory to the Contracting Officer, a serviceable truck or trailer, equipped with a fire fighting tanker unit to be kept ready for instant use for suppressing forest fires. The unit shall consist of a tank of not less than 100-gallon capacity upon which shall be mounted a live hose reel or live hose basket with 250 feet of at least 3/4-inch I.D. heavy-duty rubber hose; a portable or power takeoff pump with discharge capacity of at least 10 gallons per minute at 150 P.S.I. pressure. Gear type pumps shall be provided with a bypass or pressure relief valve so that the hose nozzle may be shut while the pump is operating. Each tanker unit shall have a hose nozzle of the shut-off type, adjustable for straight stream, spray or fog, at least 12 feet of 1-inch suction hose with an intake screen, an additional 250 feet of 3/4-inch heavy-duty rubber hose or 1-inch cotton jacket rubber-lined or linen hose to be carried on the unit for use as needed. Tools, adapters, accessories and fuel necessary to operate the

ADMIN SITE PAINT WORK PAGE 19 OF 60

pump and truck or trailer shall be provided. If a trailer is used, a serviceable vehicle with the proper trailer tow hitch shall be located at a point satisfactory to the Contracting Officer. Where water is available, a supply sufficient for rapidly filling the water tank shall be provided at one or more accessible points along or adjacent to the main truck roads.

(13) Burning. Before starting any open burning, the Contractor shall comply with the following:

(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

(ii) Obtain a burning permit from the District Ranger.

(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H- 2 - Incidental Payment Items

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

452.236-77 Emergency Response. (NOV 1996)

(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING

ADMIN SITE PAINT WORK PAGE 20 OF 60

VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.

(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.

(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitableadjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.

ADMIN SITE PAINT WORK PAGE 21 OF 60

SECTION I: CONTRACT CLAUSES

52.252-2 -- Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR www.arnet.gov/far/ AGAR http://www.da.usda.gov/procurement/policy/agar.html

52.202-1 Definitions. (JUL 2004) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant Against Contingent Fees. (APR 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) 52.203-7 Anti-Kickback Procedures. (JUL 1995) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper

Activity. (JAN 1997) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997) 52.203-12 Limitations of Payments to Influence Certain Federal Transaction (SEPT

2007)

52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000) 52.209-6 Protecting the Government's Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (SEP 2006) 52.214-26 Audit and Records - Sealed Bidding. (MAR 2009) 52.214-29 Order of Precedence - Sealed Bidding. (JAN 1986) 52.219-4 Notice of Price Evalatuon Preference for HUBZone Small Businesses (JUL

2005)

52.219-8 Utilization of Small Business Concerns. (MAY 2004) 52.219-14 Limitations on Subcontracting. (DEC 1996) 52.219-28 Post-Award Small Business Program Rerepresentation. (APR 2009) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation. (JUL 2005) 52.222-6 Davis-Bacon Act. (JUL 2005) 52.222-7 Withholding of Funds. (FEB 1988) 52.222-8 Payrolls and Basic Records. (FEB 1988) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (JUL 2005) 52.222-12 Contract Termination - Debarment. (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988) 52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

ADMIN SITE PAINT WORK PAGE 22 OF 60

52.222-15 Certification of Eligibility. (FEB 1988) 52.222-21 Prohibition of Segregated Facilities. (FEB 1999) 52.222-26 Equal Opportunity. (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB

1999) 52.222-35 Equal Opportunity for Special Disabled Veterans, Veterans of the

Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.222-36 Affirmative Action for Workers with Disabilities. (JUN 1998) 52.222-37 Employment Reports on Special Disabled Veterans, Veterans of the

Vietnam Era, and Other Eligible Veterans. (SEP 2006) 52.222-50 Combating Trafficking in Persons. (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts. (DEC 2007) 52.223-5 Pollution prevention and Right-to-Know information (AUG 2003)

52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-14 Toxic Chemical Release Reporting. (AUG 2003) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and

Construction Contracts. (MAY 2008) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent. (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997)

52.228-11 Pledges of Assets. (SEP 2009) 52.228-14 Irrevocable Letter of Credit. (DEC 1999) 52.228-15 Performance and Payment Bonds - Construction. (NOV 2006) 52.229-3 Federal, State, and Local Taxes. (APR 2003) 52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002) 52.232-17 Interest. (OCT 2008) 52.232-23 Assignment of Claims. (JAN 1986) 52.232-27 Prompt Payment For Construction Contracts. (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration.

(OCT 2003)

52.233-1 Disputes. (JUL 2002) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements. (APR 1984) 52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984)

ADMIN SITE PAINT WORK PAGE 23 OF 60

52.236-13 Accident Prevention. (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984)

52.236-15 Schedules for Construction Contracts. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-26 Preconstruction Conference. (FEB 1995) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.248-3 Value Engineering - Construction. (SEP 2006) 52.249-2 Termination for Convenience of the Government (Fixed-Price). (MAY

2004) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 452-228-71 Insurance Coverage (NOV 1996)

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction

Contracts. (NOV 1996) 452.236-71 Prohibition Against Lead-Based Paint (NOV 1996)

52.203-15 Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009. (MAR 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

52.204-7 Central Contractor Registration. (APR 2008)

(a) Definitions. As used in this clause--

"Central Contractor Registration (CCR) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern.

(D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

ADMIN SITE PAINT WORK PAGE 24 OF 60

"Registered in the CCR database" means that--

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record "Active". The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States;

or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and Zip Code.

ADMIN SITE PAINT WORK PAGE 25 OF 60

(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart

42.12 of the FAR; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

ADMIN SITE PAINT WORK PAGE 26 OF 60

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor's CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.

52.204-11 American Recovery and Reinvestment Act--Reporting Requirements.

(MAR 2009)

"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.

"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

ADMIN SITE PAINT WORK PAGE 27 OF 60

"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or

ADMIN SITE PAINT WORK PAGE 28 OF 60

property if the value for the executive exceeds $10,000.

(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.

(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.

(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.

(1) The Government contract and order number, as applicable.

(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.

(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.

(4) Program or project title, if any.

(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.

(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.

(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--

(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor

ADMIN SITE PAINT WORK PAGE 29 OF 60

categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.

(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if--

(i) In the Contractor's preceding fiscal year, the Contractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.

(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if

ADMIN SITE PAINT WORK PAGE 30 OF 60

the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) The applicable North American Industry Classification System (NAICS) code.

(vi) Funding agency.

(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(viii) Subcontract number (the contract number assigned by the prime contractor).

(ix) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(xi) Names and total compensation of each of the subcontractor's five most highly compensated officers, for the calendar year in which the subcontract is awarded if--

(A) In the subcontractor's preceding fiscal year, the subcontractor received--

(l) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements;

and

(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements;

and

ADMIN SITE PAINT WORK PAGE 31 OF 60

(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

52.214-26 -- Audit and Records -- Sealed Bidding (Mar 2009)

(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.

(b) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to --

(1) The proposal for the modification;

(2) The discussions conducted on the proposal(s), including those related to negotiating;

(3) Pricing of the modification; or

(4) Performance of the modification.

(c) Comptroller General. In the case of pricing any modification, the Comptroller General of the United States, or an authorized representative, shall have the same rights as specified in paragraph (b) of this clause and also the right to interview any current employee regarding such transactions.

(d) Availability. The Contractor shall make available at its office…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .