G-4_opt_TSTAEReport.pdf
PDF 430 KB Posted
- Attached to
- RECOVERY - Little Beaver Hazardous Fuels Reduction Project - Stewardship - Kootenai Nationjal Forest Montana
- Solicitation number
- AG-82B1-S-10-0040
About this file
Appendix G-4 - Optional removal Timber Sale Transactional Evidence Appraisal Report.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRICT 07
Expiration Date = April 1, 2010
V9.12
Select Contract Type
TIM/STARS #
TYPE UOM TON
Prepared by (Signature) (Date)
Prepared by (Signature) (Date)
Approved by District Ranger (Date)
Reviewed by (Signature) (Date)
Certification Reports for Gates 3 and 4 from TIM are attached to this timber sale report.
Timber Sale Final Package Approved By: (Date)
All attached documents and specifications for this timber sale have been completed in accordance with regulations at 36 CFR, Part 223, Subpart B, and the applicable Forest Service Manual and
Handbook requirements and standards related to timber sales. Furthermore, the environmental documentation and NEPA decision have been reviewed; no significant new information or changed circumstances relating to the environmental impacts of this proposed action exist that require a correction, supplement, or revision to the documentation or decision; and implementation
(advertisement) should continue.
Little Beaver HFRA Optional
(SALE NAME)
(6) =2400-13
NORTHERN REGION - R-1
KOOTENAI NATIONAL FOREST - 14
TIMBER SALE AND
TRANSACTION EVIDENCE
APPRAISAL REPORT
Appendix G-4
AG-82B1-S-10-0040
Sale Area Legal Description (short T & R):
Sale Area Legal Description (long):
Compartment (s): 0
Briefly describe additions or changes made to project design during timber sale preparation.
TIMBER SALE INFORMATION
TIM, Gate 3, Create Timber Sale (Prep101)
Sale Area Description:
Primary County Name (FIPS Code): (089) Sanders
T22N, R30W, PMM
Portions of Sections 17, 18, 20, T22N, R30W, Section 13, T23N, R31W, Sanders County, State of Montana,PMM
The format that the description is entered here and inputted to TIM is exactly the way it will print out in the
Contract, Ad and prospectus at Gate 4.
Environmental Documentation:
Project Association: List NEPA Project(s) that approved the timber sale.
NEPA Document Name Percentage of Sale Volume (CCF)
The above NEPA Document(s) shall be included in the Prospectus, General Narrative, TIM Gate 4 -
Prospectus (ADVR115). Include the following statement in the Prospectus: The environmental document(s) that approved this sale:________________________________
100Little Beaver HFRA
Activity
Management Areas Sale Purpose Code Type of sale
All suitable MA's TC/01 All sawtimber, non-sawtimber and fuelwood sales on all contract forms including permits.
(MA 11,12,14,15,16,17)
Non suitable MA's FS/___ All sawtimber sales, select the most appropriate activity based on documented sale purpose.
MA 3, 5, 19 FS/10 General salvage
MA 6 FS/20 Hazard tree removal
MA 10 FS/30 Wildlife Habitat Improvement
MA 18 FS/90 Test Regen Techniques
FS/70/100% Commercial sale of post, poles, Christmas trees, mushrooms, etc.
Firewood or Christmas Permits PP/80/100% Intent is personal use.
TSPIRS INFORMATION, SALE OBJECTIVES
TIM, Gate 3, Create Timber Sale (Prep101)
Purpose (TIM -PREP101)
KOOTENAI SALE PURPOSE CODING INSTRUCTIONS
% of Sale Volume - CCF (TIM - PREP101)
01 - Timber Purpose
10 - Forest and Health
In the absence of documented sale purpose reasons for nonsuitable MA'S, the following codes, based on stated goals and objectives in the
Forest Plan, will be used.
Percentage: The percentage distribution will be 100% EXCEPT when an individual sale includes a mix of suitable and nonsuitable MA's. In this circumstance, the percentage split between TC and FS coding will be based on the sawtimber volume in the MA's. DO NOT distribute the percentage for nonchargeable product volume that may be included on sawtimber sales in suitable MA's. Code these as 100% TC/01.
Convertible product permits and non timber commercial sale contracts or permits.
FS - Forest Stewardship Purpose
FS - Forest Stewardship Purpose
TIM, Gate 4, Salvage Sale Fund Plan (ADVR112)
Reference to FSH 2409.18 - 52.45a - for assitance with SSF collections
SSF Volume (CCF): 0% % of total volume
0%
CRUISE: # CHECK CRUISE:
Date of Cruise Date of Check:
Cruisers: Cruisers:
Method: Results:
SE%: 99.9
SALVAGE SALE FUND INFORMATION
Salvage Component with Sanitation, Stand Improvement, or Regeneration
(Use for all other sales - stand(s) that include a salvage component)
SSF Silviculture Treatment Type (Pick one)
(Contact SO for percentage to enter into Funding Source form. Funding Source percentage must be equal to or less than % of salvage in the SSF Plan.)
FUNDING SOURCE
Funding Source (button on tool bar) - From STAT102
Sale Preparation Funding Source ---SSSS (Salvage Fund) % http://fsweb.wo.fs.fed.us/directives/fsh/2409.18/
1/3/2007
CRUISE INFORMATION
N/A
Method of determining ROW volume:
Basis for Percent Defect:
SEEN DEFECT PLUS ADDITIONAL CULL AND BREAKAGE.
STR, PNT
Appendix G-4 http://fsweb.wo.fs.fed.us/directives/fsh/2409.18/
TOTAL CF VOLUME BY UNIT --- NCS REPORT
Unit # Acres Sawtimber CCF Non-Saw CCF
10d 27 30462 305 50205 502
1 61 41492 415 109289 1093
1b 26 17685 177 46582 466
3 12 5363 54 21187 212 NET
3a 37 16535 165 65327 653
3b 7 4761 48 12541 125 o11 3 2041 20 5375 54 o12 2 894 9 3531 35
0.5020
11 20 8938 89 35312 353
0.5747
4 76 33965 340 134185 1342
162136 Sawtimber 483534 Non-Saw
TOTAL SALE UNIT VOLUME (CCF) 1622 1622 4835 4835
(Sheet 1) (Sheet 1&2) (Sheet 1) (Sheet 1&2)
TOTAL SALE CF VOLUME BY SPECIES --- NCS REPORT (R101)
Species Saw Rounded %Defect Av. DBH Logs/Unit Non-Saw Rounded
AF 0 0
C 0 0
DF 45352 454 9 10.4 19.7 29561 296
GF 3688 37 6 11 14.7 3367 34
H 0 0 0
L 22253 223 9 8.7 27.7 58145 581
LP 90842 908 9 8.5 26 392231 3922
PP 0 231 2
S 0 0
WP 0 0
162135 483535
TOTAL VOLUME 1622 CCF 4835 CCF
Page 5a
MBF/CCF Ratio from
NCS Report CS1
ROUNDED VOLUME IS THE DIFERENCE BETWEEN UNIT VOLUME AND SPECIES VOLUME (AFTER
ROUNDING TO CCF) ADDED TO THE SPECIES WITH THE LARGEST VOLUME
Sawtimber (Product 01)
Non-Saw (Product 08)
Cruise Appraisal ROW Logging Harvest Land Suit
Unit # P.U.# Unit AcresUnit Acres Acres Method Method Class MA Saw+Add Non-Saw CL NL
10d 27 27 430 305 502
1 61 61 420 415 1093
1b 26 26 430 177 466
3 12 12 430 54 212
3a 37 37 420 165 653
3b 7 7 430 48 125 o11 3 3 3 420 857 20 54 o12 2 2 2 420 857 9 35
11 20 20 420 89 353
4 76 76 420 340 1342
Totals Sheet 1 271 271 5 1622 4835 0 0
Total Sale Area: 0 Sale Area Acres Total Sawtimber (Sheet 1) 1622 CCF
Total Cutting Area: 271 Acres Net Acres 266 Total Saw + Non-Saw (Sheet 1) 6457 CCF
(Sheet 1)
Page 6a
Unit Volume CCF Yield Component
VOLUME - DIRECT ENTRY
(TIM GATE 3 - PREP 103)
CUTTING UNIT DESCRIPTION
(TIM GATE 3 - PREP 104)
APPRAISAL CCF TO TON WORKSHEET
SAWTIMBER - CCF
Defect Net Total Total Tons Per Total
Species % Volume Additional Net CCF Tons
AF 0 0 0 0 2.65 0
C 0 0 0 0 2.15 0
DF 9 454 0 454 3.00 1362
GF 6 37 0 37 3.25 120
H 0 0 0 0 3.40 0 Net MBF/CCF Ratio For
L 9 223 0 223 3.15 702 Sawtimber From NCS
LP 9 908 0 908 2.80 2542 Report CS1 0.5020
PP 0 0 0 0 3.30 0
S 0 0 0 0 2.80 0 TIM Prep 105
WP 0 0 0 0 2.60 0 Conversion Factors
MBF CCF
TOTAL = 9 1622 0 1622 4726 = 0.1723 0.3432
NON-SAWTIMBER - CCF
Net Additional Total Tons Per Total
Species Volume Non-Saw Net CCF Tons
AF 0 0 2.65 0
C 0 0 2.15 0
DF 296 296 3.00 888
GF 34 34 3.25 111
H 0 0 3.40 0 Net MBF/CCF Ratio For
L 581 581 3.15 1830 Non-Sawtimber From NCS
LP Reduce Wt 12% 3922 3922 2.46 9648 Report CS1 0.5747
PP 2 2 3.30 7
S 0 0 2.80 0
WP 0 0 2.60 0 TIM Prep 105
Conversion Factors
MBF CCF
TOTAL = 4835 0 4835 12484 = 0.2226 0.3873
Gross Net Tons
TOTALS = 0 6457 17210
APPRAISAL SUMMARY
CONTRACT VOLUME (CCF) 6457
APPRAISAL VOLUME (CCF) 1622
CONTRACT VOLUME (TONS) 17210 (Note: Total Tons to be used for Rd. Maintenance Appr.)
WTD TONS/CCF 2.67
ASSIGN CONTRACT SPECIES UTILIZATION STANDARDS
TIM Gate 3 - Prep 105 TIM Gate 4 - Contract Prep Information ADVR114
Contract Species Association
Conversion Factors
Contract Species
Minimum Specifications
MBF CCF DBH Length DIB
DF Live and Dead 0.1723 0.3432 7 1 8.0 5.6 10.67
#### CS Live and Dead 0.2226 0.3873 4 1 8.0 2.5 50
C14
(only applicable to weight scale sales)
(Enter from Species
Volume Summary)
Full Name for
Contract
(Major Species
Group)
Contract species need to be grouped to reflect differences in utilization and/or how species shall be grouped in A(T) 2 of the
Timber Sale Contract.
All Non-sawtimber shall be grouped as Combined Softwood
(CS) under Contract Species
Fill out Minimum Specifications below to reflect how sawtimber & non-sawtimber were cruised.
From the list below select the description of non-sawtimber products that reflects how the products were cruised and input in NCS.
The description below is to be included in A(T)2 of timber sale. (Refer to non-sawtimber appraisal guide for more details & instructions).
Cedar Products - Net
Merch. Factor - Refer to C(T)6.804#
Number of Pieces
Non-sawtimber products include only the top portion of a saw log tree and those trees less than the minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801).
Diameter Breast High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
Non-sawtimber products include only those trees less than the minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801).
Select Non-Sawtimber Products description from the following:
Non-sawtimber products include any log or portion of a tree not meeting minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
Non-sawtimber products include only that portion of a saw log tree not meeting minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast High (d.b.h.)
is not applicable for the non-sawtimber portion of sawtimber trees.
Non-sawtimber products include only the top portion of a saw log tree less than the minimum sawtimber specifications
(C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast
High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
Merch.
Factor
Check one
EXTERNAL YARDING DISTANCE EXTERNAL YARDING DISTANCE
Unit # % Slope Unit # % Slope
10d 305 900 30%
1 415 400 20%
1b 177 350 20%
3 54 1000 46%
3a 165 1000 50%
3b 48 250 20% o11 20 300 8% o12 9 300 8%
11 89 1000 30%
4 340 1000 30%
Tractor Forwarder Helicopter Ground Lead
420 1038 VOL 492 0 VOL 480 0 VOL 450 0 VOL
779 AVE EYD 0 AVE EYD 0 AVE EYD 0 AVE EYD
Skyline
430 584 VOL
720 AVE EYD Page 10
SLOPE
NOTE!
Volume
CCF
EYD
Feet
Top
Elevation
Bottom
Elevation
Volume
CCF
EYD
Feet
Top
Elevation
Bottom
Elevation
Appraisal Point:
Total Sawtimber Tributary Volume:
(Haul Appraisal for Sawtimber only. Non-Sawtimber included in Non-Sawtimber Adjustments)
Sawtimber
Paved Unpaved Trib Vol
2402 4 3a 3b 3 10d 11 1 1b 2 1a 0.65 1593 0.638
16-3 4 3a 3b 3 10d 11 1 1b 2 1a 0.3 1593 0.295
16-1 4 3a 3b 3 10d 11 1 1b 2 1a 0.25 1593 0.246
Hwy200 all 5 1622 5
WTD Total Paved Miles WTD Total Unpaved Miles
(Sheet 1) (Sheet 1) (Sheet 1) 6.2
Page 11a
WTD Haul Note
TRL
WTD HAUL MILES
HAUL
1,622
(The appraisal point is most advantageous when total transportation cost, including road work, are less than other appraisal points. Appraise to a mill where timber product can be processed. SBA Set Aside Sales are appraised the same way; not to the nearest SBA mill)
Road
No.
Miles WTD
MILESUnits
5.0 1.2
WDT Total Miles
NON-SAWTIMBER SUMMARY
DATA INPUT
Total Nonsawtimber Volume (CCF)
(Primary + Secondary) 4,835 0 enter cable pri nonsaw CCF
Total Nonsawtimber Volume (Tons)
(Primary + Secondary) 12,484 0 enter cable pri nonsaw tons
Tons / CCF for nonsawtimber material 2.58 Adjustment
Total Appraised Sawlog Volume
(CCF) 1,622
Total One Way Weighted Haul Miles 14 8 Adjustment
Logging System
All Ground
Based All Cable
Range of Data
Input
Nonsawtimber Primary Product (CCF) 3,197 1,157
Net CCF / Acre Harvested for nonsawtimber primary product 16.1 5.8
4 - 39 green
CCF / acre
Average DBH Harvested for nonsawtimber primary product 6.4 6.4 6 - 10.5 inches
Average Yarding Distance (Feet) 779 720 600 - 1800 feet
Nonsawtimber Primary Product
(Tons) 8,255 2,987 Net Tons / Acre Harvested for nonsawtimber primary product 41.5 15.0
No Appraisal Allowance For Nonsawtimber
Removal included under Mandatory Item 1 and Optional Item 9
RIGHTS - OF - WAY
Road # Length
$/CCF $/TON
$0.62 $0.23
$0.00 $0.00
$0.62 $0.23 ( A )
$0.47 $0.18 ( B )
( C )
$1.09 $0.41
(Entries for 2400 - 17)
$ $1.87 CCF
$ $4.34 CCF
(Enter appropriate rate in TIM - Gate 4 - Road Maint. Plan - ADVR105
C(T)5.32# - Total Required Deposits (Part B)
C(T)5.314 - Total Dust Abatement (Part C)
TOTAL MAINTENANCE COST (Parts A-B-C)
(Attach worksheets with road costs)
Appraisal Rates
Total Required Deposits
Total Road Maintenance Costs (Performance + Deposits)
Refer to Road Maintenance Appraisal for Road Reconditioning cost per road segment.
C(T)5.31 - Recurrent Maintenance
C(T)5.312 - Reconditioning
Total Performance (Part A)
Total Required Deposits (Recurrent and Deferred) (Part B)
ROAD MAINTENANCE
(From Road Maintenance Appraisal Summary, sheets are attached)
Contract Rates
Total Performance Recurrent Maintenance (Part A)
16-1 and 16-3 Temp Road Use DNRC and FS
(Include Cost share Agreements)
Road Name Type of Agreement Agreement with (Names)
Tractor Skyline Forwarder TOTAL
Acres 199 0 72 0 0 271
Volume 1038 0 584 0 0 1622
EYD 779 0 720 0 0
FALSE
LOGGING METHOD SUMMARY
Ground
Lead
Aerial
Heli
Construction or Reconstruction of roads not included on haul route are to be included as Stewardship
Projects (K-G9#) and Appraised using Davis Beacon Wages.
ROAD CONSTRUCTION / RECONSTRUCTION
Check Box if road(s) being Constructed or Reconstructed are Specified Roads needed for harvesting Included Timber.
"Check Box" if Brush disposal is to be included as a contractual requirement under TRUE
K-G.7 Hazard Reduction and Site Preparation.
Forest Service Rate (Fund Code BDBD) $0.00 Total $ (a) $0.00 CCF
Purchaser Rate (Fund Code PPPP) $1,736.00 Total$ (b) $1.07 CCF
$1.07 CCF
Forest Service Rate Per CCF (Fund Code BDBD) $0.00 CCF
$0.00 TON
FALSE Lump Sum BD Deposits for Weight Scaled Sales
(Sheet 1) Page 16A
Total Cost $0.00
BRUSH DISPOSAL
Stewardship Contract From FACTS - Detailed Listing of BD and Purchaser Slash Treatment Activities
Appraisal Rates for 2400-17 (Applied to Sawtimber only)
TOTAL: (a) + (b) =
Contract Rates (Applied to All Products)
Cutting Unit Number Required Deposits
Check Box to use.
EROSION CONTROL
The following seed and fertilizer mix is the standard mix to be used on the Kootenai.
This mix is to be included in C(T)6.601# - Erosion Control Seeding and Special Project
Specifications (SPS) 625.05 in the road package.
Make sure that the seed mix and fertilizer are the same in both contract and road package.
Site specific areas, such as gravel pits and very dry sites may call for more and/or different species in the mix. Document below the rational for deviation from the standard seed mix.
Annual Rye or Winter Wheat 18
Hard Fescue 6
Orchard Grass 6
TOTAL 30 TOTAL 240
Crossdrains
Installation of crossdrains on temporary roads, skid trails and firelines are included in their respective cost allowance.
Scarification acres @ per acre =
Seed and Fertilizer
Temporay Roads seeding is included in Temporary Road cost
Temporary Roads chains X 1/2 / 10 = 0.0 acres
Firelines chains X 1/4 / 10 = 0.0 acres
Skid Trails
Number of acres to be skidded using ground based systems times the percentage of area requiring seed and fertilizer. 199 acres X 5% = 10.0 acres
Number of acres to be yarded using cable systems times the percentage of area requiring seed and fertilizer. 72 acres X 2% = 1.4 acres
Landings
Number of landings 10 X 0.25 acres per landing = 2.5 acres
TOTAL 13.9 acres
Species of Seed Pounds per Acre Type of Fertilizer
$0.00
Pounds per Acre
25-10-10 or 27-12-12 or
34-16-10
Seed mix, fert., labor costs:
Lbs / Acre $ / Lb $ per Acre
Annual Rye or Winter Wheat 18 X $0.79 = $14.22
Hard Fescue 6 X $3.19 = $19.14
Orchard Grass 6 X $1.69 = $10.14
Fertilizer 240 X $0.20 = $48.00
*Labor per Acre = $249.00
$ per acre $340.50
Total cost for
SEEDING 13.9 acres X $43.50 $/acre =
FERTILIZER 13.9 acres X $48.00 $/acre =
LABOR 13.9 acres X $249.00 $/acre =
SCARIFICATION
TOTAL
COST / 1622 CCF = $2.92 PER CCF
* Engineers estimate Page 114 of the Cost Guide Item Labor Rates.
Document Rational for Changes to Standard Seed Mix.
$4,732.95
$604.65
$667.20
$3,461.10
$0.00
$4,732.95
OTHER CONTRACTUAL RQUIREMENTS ( A )
Other - Include Contractual Obligations Requiring Performance Bond Coverage
(Road closure, Barriers, Trail Restoration, etc.)
ITEM # X COST = TOT COST
17210 X $0.05 per XXX = $860.50
1 X $1,500.00 per XXX = $1,500.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
Cost / 1622 CCF = $1.46 CCF
Subtotal Other Contractual Requirements ( A ) = $1.46 CCF
$2,360.50
Road Use Fee $.05/ton
Gate Installation
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
OTHER CONTRACTUAL REQUIREMENTS ( B )
Cost Cost per
Per oz UOM
$0.00 $0.00 mile
$0.00 $0.00 mile
$0.00 $0.00 mile
$0.00 $0.00 mile
Price qoute for herbicide obtained from:
Sufactant & Dye
.32 oz/gal H2O $0.68/acre = $2.45/ mile
Labor Rate $40/ hour (2 Miles per hour)
Miles of road to be sprayed: 0 miles
Herbicide to be applied: Miles $ UOM Tot Cost
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Sufactant & dye: 0 $2.45 $0.00
Application Cost (Labor): 0 $20.00 $0.00
Misc. Expensense: 0 $32.00 $0.00
TOTAL WEED TREATMENT: $0.00 cost / 1622 CCF = $0.00 CCF
ON-SITE EQUIPMENT WASHING C(T)6.351#
Cost allowance for washing off-road equipment Prior To Leaving locations identified in EIS/EA
Number (pieces of equipment) Number of seasons
Cleaning costs per piece $0.00 CCF 1622
Total cost for washing equipment per CCF $0.00 CCF
Subtotal Other Contractual Requirements (B) $0.00 CCF
Wilbur Ellis
The cost allowance for herbicide application has been based on the following assumptions; 300 gallon sprayer with herbicide injectors (not tank mixed); 20 gallon of carrier/ac; one trip will be required for each herbicide per road; labor rate and production includes mix, loading, cleanup and daily documentatiion; misc. expenses include equipment maintenance and depreciation, herbicide storage and handling and licensing fees. One mile of road with an average ROW of 30 feet is equal to 3.6 acres. Herbicides approved for use are listed in C(T)6.27# under Technical Spraying
Specifications.
Application Rate oz per acre
Herbicide
(Common name)
MISCELLANEOUS CONTRACTUAL REQUIREMENTS ( C )
(Contractual Obligations That Would Not Require Coverage Under The Performance Bond)
Stump Shoveling (Not required under normal operating/winter conditions. Include if clippers not allowed)
# stumps X $0.00 per stump =
Cost / 1622 CCF = $0.00 CCF
Snow Plowing
# miles X $0.00 per mile X # plowings =
Cost / 1622 CCF = $0.00 CCF
Miscellaneous: (Helicopter Landing Construction, Traffic Control etc…)
ITEM # X COST = TOT COST
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
Stewardship Base Rate Adjustment =
Cost / 1622 CCF = $0.00 CCF
Subtotal Miscellaneous Contractual Requirements ( C ) = $0.00 CCF
Total Other Contractual Requirements (A+B+C) $1.46 CCF
Brush Disposal (Purchaser and FS) $0.00 CCF
Total Environmental Protection Cost $1.46 CCF
$0.00
N/A N/A
$0.00
$0.00
$0.00
$0.00
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
TEMPORARY ROADS
0.74 Miles
Temporary Road #1 Cost $
Temporary Road #2 Cost $
Temporary Road #3 Cost $
Temporary Road #4 Cost $
Temporary Road #5 Cost $
TOTAL TEMPORARY ROAD COST =
(Total Temporary Development Costs)
COST / 1622 CCF = $3.68 CCF
Cost Guide for Temporary Roads
Temporary Road Seeding, Fertilizing and Obliteration Costs per CCF $0.82
UNUSUAL CONDITION ADJUSTMENTS
Cost $ / 1622 CCF = $0.00 CCF
Page 22a
$0.00
$5,971.00
Ridge Top Temp - units 3A, 3B, 10D
$0.00
$0.00
$0.00
$0.00
$5,971.00
$5,971.00 http://www.fs.fed.us/r1/projects/costguide_index.shtml
Appendix G-4 http://www.fs.fed.us/r1/projects/costguide_index.shtml
Unit or Road Number:
Reference to Cost estimating procedures for temporary roads from Cost Guide pages 100-104
Average Side Slope 20 %
Length 3900 Feet 0.74 Miles
Volume per Acre 10
(Note: Do not adjust project costs for inflation or deflation)
Costs Prer Mile
Clearing and Grubbing (Table T-1) = $3,570.00 Mile
Excavation (Table T-1) = $1,620.00 Mile
Seeding (Table T-1) = $730.00 Mile
Obliteration (Table T-1) = $1,060.00 Mile
Total Unit Cost Per Mile =
Baisc Cost Total X Length =
Drainage Structures
6 Dips X $125.00 = $750.00
18" CMP X $0.00 = $0.00
other CMP" X $0.00 = $0.00
Drainage Cost Total =
Other Requirements
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
Other Cost Total =
Subtotal (Basic + Drainage + Other) =
Mobilization (Table T-4) 7% =
Subtotal =
TOTAL COST / 1.06 Profit =
Total Cost to be entered on 2400-17
Page 22c
$6,329.00
$6,329.00 $5,971.00
$0.00
$5,915.00
$414.00
TEMPORARY ROAD COSTS #2
Ridge Top Temp - units 3A, 3B, 10D
$750.00
$6,980.00
$5,165.00
Reference to Cost estimating procedures for temporary roads from Cost Guide pages 100-104
File details come from the government source that posted it. Updated .