G-2_mand_TSTAEReport.pdf
PDF 482 KB Posted
- Attached to
- RECOVERY - Little Beaver Hazardous Fuels Reduction Project - Stewardship - Kootenai Nationjal Forest Montana
- Solicitation number
- AG-82B1-S-10-0040
About this file
Appendix G-2 - Mandatory removal Timber Sale Transactional Evidence Appraisal Report.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRICT 07
Expiration Date = April 1, 2010
V9.12
Select Contract Type
TIM/STARS #
TYPE UOM TON
Prepared by (Signature) (Date)
Prepared by (Signature) (Date)
Approved by District Ranger (Date)
Reviewed by (Signature) (Date)
Certification Reports for Gates 3 and 4 from TIM are attached to this timber sale report.
Timber Sale Final Package Approved By: (Date)
NORTHERN REGION - R-1
KOOTENAI NATIONAL FOREST - 14
TIMBER SALE AND
TRANSACTION EVIDENCE
APPRAISAL REPORT
Little Beaver HFRA Mandatory
(SALE NAME)
/s/ John Craig Oct 19,2009
(6) =2400-13
All attached documents and specifications for this timber sale have been completed in accordance with regulations at 36 CFR, Part 223, Subpart B, and the applicable Forest Service Manual and
Handbook requirements and standards related to timber sales. Furthermore, the environmental documentation and NEPA decision have been reviewed; no significant new information or changed circumstances relating to the environmental impacts of this proposed action exist that require a correction, supplement, or revision to the documentation or decision; and implementation
(advertisement) should continue.
19-Oct-09
/s/ Linda Meyer 19-Oct-09
Appendix G-2
AG-82B1-S-10-0040
Sale Area Legal Description (short T & R):
Sale Area Legal Description (long):
Compartment (s): 0
Briefly describe additions or changes made to project design during timber sale preparation.
T22N, R30W, PMM
Portions of Sections 6, 7, 17, 18, 20, T22N, R30W, Sections 13, T23N, R31,County, State of Montana,PMM
The format that the description is entered here and inputted to TIM is exactly the way it will print out in the
Contract, Ad and prospectus at Gate 4.
Environmental Documentation:
Project Association: List NEPA Project(s) that approved the timber sale.
NEPA Document Name Percentage of Sale Volume (CCF)
The above NEPA Document(s) shall be included in the Prospectus, General Narrative, TIM Gate 4 -
Prospectus (ADVR115). Include the following statement in the Prospectus: The environmental document(s) that approved this sale:________________________________
100Little Beaver HFRA
TIMBER SALE INFORMATION
TIM, Gate 3, Create Timber Sale (Prep101)
Sale Area Description:
Primary County Name (FIPS Code): (089) Sanders
Activity
Management Areas Sale Purpose Code Type of sale
All suitable MA's TC/01 All sawtimber, non-sawtimber and fuelwood sales on all contract forms including permits.
(MA 11,12,14,15,16,17)
Non suitable MA's FS/___ All sawtimber sales, select the most appropriate activity based on documented sale purpose.
MA 3, 5, 19 FS/10 General salvage
MA 6 FS/20 Hazard tree removal
MA 10 FS/30 Wildlife Habitat Improvement
MA 18 FS/90 Test Regen Techniques
FS/70/100% Commercial sale of post, poles, Christmas trees, mushrooms, etc.
Firewood or Christmas Permits PP/80/100% Intent is personal use.
Convertible product permits and non timber commercial sale contracts or permits.
FS - Forest Stewardship Purpose
FS - Forest Stewardship Purpose
KOOTENAI SALE PURPOSE CODING INSTRUCTIONS
10 - Forest and Health
01 - Timber Purpose
TSPIRS INFORMATION, SALE OBJECTIVES
TIM, Gate 3, Create Timber Sale (Prep101)
In the absence of documented sale purpose reasons for nonsuitable MA'S, the following codes, based on stated goals and objectives in the
Forest Plan, will be used.
Percentage: The percentage distribution will be 100% EXCEPT when an individual sale includes a mix of suitable and nonsuitable MA's. In this circumstance, the percentage split between TC and FS coding will be based on the sawtimber volume in the MA's. DO NOT distribute the percentage for nonchargeable product volume that may be included on sawtimber sales in suitable MA's. Code these as 100% TC/01.
Purpose (TIM -PREP101) % of Sale Volume - CCF (TIM - PREP101)
TIM, Gate 4, Salvage Sale Fund Plan (ADVR112)
Reference to FSH 2409.18 - 52.45a - for assitance with SSF collections
SSF Volume (CCF): 0% % of total volume
0%
CRUISE: # CHECK CRUISE:
Date of Cruise Date of Check:
Cruisers: Cruisers:
Method: Results:
SE%: 13.7
CRUISE INFORMATION
D7/D4 Timber Crew
9/1/2008
D7/D4 Timber Crew
Passed
Sep-08
Determined from unit volume
Method of determining ROW volume:
Basis for Percent Defect:
SEEN DEFECT PLUS ADDITIONAL CULL AND BREAKAGE.
STR, PNT
SALVAGE SALE FUND INFORMATION
Salvage Component with Sanitation, Stand Improvement, or Regeneration
(Use for all other sales - stand(s) that include a salvage component)
SSF Silviculture Treatment Type (Pick one)
(Contact SO for percentage to enter into Funding Source form. Funding Source percentage must be equal to or less than % of salvage in the SSF Plan.)
FUNDING SOURCE
Funding Source (button on tool bar) - From STAT102
Sale Preparation Funding Source ---SSSS (Salvage Fund) % http://fsweb.wo.fs.fed.us/directives/fsh/2409.18/
Appendix G-2 http://fsweb.wo.fs.fed.us/directives/fsh/2409.18/
TOTAL CF VOLUME BY UNIT --- NCS REPORT
Unit # Acres Sawtimber CCF Non-Saw CCF
1a 64 43533 435 114663 1147
2 17 7597 76 30015 300
3c 8 5442 54 14333 143
5 39 26528 265 69873 699
6 25 17005 170 44790 448
8 18 17130 171 33464 335
9 9 8565 86 16732 167
10 78 88001 880 145037 1450
10a 12 13539 135 22313 223
10b 57 64308 643 105988 1060
10c 24 27077 271 44627 446
NET
LR1 6 6769 68 11157 112
LR2 2 1903 19 3718 37
LR3 1 680 7 1792 18 0.5020
0.5747
20 49 65469 655 19503 195
20a 23 30703 307 9155 92
20b 11 14697 147 4378 44
21 94 125594 1256 37415 374
22 20 26722 267 7961 80
23 3 4008 40 1194 12
691555 Sawtimber 959992 Non-Saw
TOTAL SALE UNIT VOLUME (CCF) 5952 6916 7382 9601
(Sheet 1) (Sheet 1&2) (Sheet 1) (Sheet 1&2)
TOTAL SALE CF VOLUME BY SPECIES --- NCS REPORT (R101)
Species Saw Rounded %Defect Av. DBH Logs/Unit Non-Saw Rounded
AF 0 0
C 0 0
DF 327514 3275 9 10.4 19.7 102883 1029
GF 31619 316 6 11 14.7 9700 97
H 0 0 0
L 135294 1353 9 8.7 27.7 137417 1374
LP 197159 1972 9 8.5 26 709186 7093
PP 0 806 8
S 0 0
WP 0 0
691586 959992
TOTAL VOLUME 6916 CCF 9601 CCF
Page 5a
MBF/CCF Ratio from
NCS Report CS1
ROUNDED VOLUME IS THE DIFERENCE BETWEEN UNIT VOLUME AND SPECIES VOLUME (AFTER
ROUNDING TO CCF) ADDED TO THE SPECIES WITH THE LARGEST VOLUME
Sawtimber (Product 01)
Non-Saw (Product 08)
TOTAL CF VOLUME BY UNIT --- UC5 REPORT
Unit # Acres Sawtimber CCF Non-Saw CCF
40 39 26528 265 69873 699
41 30 20406 204 53749 537
7 48 45679 457 89237 892 o21 1 952 10 1859 19 o22 2 1360 14 3583 36 o23 2 1360 14 3583 36
96285 Sawtimber 221884 Non-Saw
TOTAL UNIT VOLUME CCF 6916 9601
SHEETS 1&2
Page 5b
Cruise Appraisal ROW Logging Harvest Land Suit
Unit # P.U.# Unit AcresUnit Acres Acres Method Method Class MA Saw+Add Non-Saw CL NL
1a 64 64 420 435 1147
2 17 17 420 76 300
3c 8 8 420 54 143
5 39 39 420 265 699
6 25 25 420 170 448
8 18 18 420 171 335
9 9 9 430 86 167
10 78 78 430 880 1450
10a 12 12 430 135 223
10b 57 57 420 643 1060
10c 24 24 420 271 446
LR1 6 6 6 420 857 68 112
LR2 2 2 2 420 857 19 37
LR3 1 1 1 420 857 7 18
20 49 49 420 655 195
20a 23 23 420 307 92
20b 11 11 420 147 44
21 94 94 430 1256 374
22 20 20 430 267 80
23 3 3 430 40 12
Totals Sheet 1 560 560 9 5952 7382 0 0
Total Sale Area: 0 Sale Area Acres Total Sawtimber (Sheet 1) 5952 CCF
Total Cutting Area: 560 Acres Net Acres 551 Total Saw + Non-Saw (Sheet 1) 13334 CCF
(Sheet 1)
Page 6a
Unit Volume CCF Yield Component
VOLUME - DIRECT ENTRY
(TIM GATE 3 - PREP 103)
CUTTING UNIT DESCRIPTION
(TIM GATE 3 - PREP 104)
Cruise Appraisal ROW Logging Harvest Land Suit
Unit # P.U.# Unit AcresUnit Acres Acres Method Method Class MA Saw+Add Non-Saw CL NL
40 39 39 430 265 699
41 30 30 430 204 537
7 48 48 430 457 892 o21 1 1 1 420 857 10 19 o22 2 2 2 420 857 14 36 o23 2 2 2 420 857 14 36
Total (Sheets 1&2) 682 682 14 6916 9601 0 0
Total Sale Area: 0 Sale Area Acres Total Sawtimber (Sheets 1&2) 6916 CCF
Total Cutting Area: 682 Acres Net Acres 668 Total Saw + Non-Saw (Sheets 1&2) 16517 CCF
(Sheets (1&2)
Page 6c
Unit Volume CCF Yield Component
VOLUME - DIRECT ENTRY
(TIM GATE 3 - PREP 103)
CUTTING UNIT DESCRIPTION
(TIM GATE 3 - PREP 104)
APPRAISAL CCF TO TON WORKSHEET
SAWTIMBER - CCF
Defect Net Total Total Tons Per Total
Species % Volume Additional Net CCF Tons
AF 0 0 0 0 2.65 0
C 0 0 0 0 2.15 0
DF 9 3275 0 3275 3.00 9825
GF 6 316 0 316 3.25 1027
H 0 0 0 0 3.40 0 Net MBF/CCF Ratio For
L 9 1353 0 1353 3.15 4262 Sawtimber From NCS
LP 9 1972 0 1972 2.80 5522 Report CS1 0.5020
PP 0 0 0 0 3.30 0
S 0 0 0 0 2.80 0 TIM Prep 105
WP 0 0 0 0 2.60 0 Conversion Factors
MBF CCF
TOTAL = 9 6916 0 6916 20636 = 0.1682 0.3351
NON-SAWTIMBER - CCF
Net Additional Total Tons Per Total
Species Volume Non-Saw Net CCF Tons
AF 0 0 2.65 0
C 0 0 2.15 0
DF 1029 1029 3.00 3087
GF 97 97 3.25 315
H 0 0 3.40 0 Net MBF/CCF Ratio For
L 1374 1374 3.15 4328 Non-Sawtimber From NCS
LP Reduce Wt 12% 7093 7093 2.46 17449 Report CS1 0.5747
PP 8 8 3.30 26
S 0 0 2.80 0
WP 0 0 2.60 0 TIM Prep 105
Conversion Factors
MBF CCF
TOTAL = 9601 0 9601 25205 = 0.2189 0.3809
Gross Net Tons
TOTALS = 0 16517 45841
APPRAISAL SUMMARY
CONTRACT VOLUME (CCF) 16517
APPRAISAL VOLUME (CCF) 6916
CONTRACT VOLUME (TONS) 45841 (Note: Total Tons to be used for Rd. Maintenance Appr.)
WTD TONS/CCF 2.78
ASSIGN CONTRACT SPECIES UTILIZATION STANDARDS
TIM Gate 3 - Prep 105 TIM Gate 4 - Contract Prep Information ADVR114
Contract Species Association
Conversion Factors
Contract Species
Minimum Specifications
MBF CCF DBH Length DIB
DF Live and Dead 0.1682 0.3351 7 1 8.0 5.6 10.67
#### CS Live and Dead 0.2189 0.3809 4 1 8.0 2.5 50
C14
Non-sawtimber products include only those trees less than the minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801).
Select Non-Sawtimber Products description from the following:
Non-sawtimber products include any log or portion of a tree not meeting minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
Non-sawtimber products include only that portion of a saw log tree not meeting minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast High (d.b.h.)
is not applicable for the non-sawtimber portion of sawtimber trees.
Non-sawtimber products include only the top portion of a saw log tree less than the minimum sawtimber specifications
(C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801). Diameter Breast
High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
Number of Pieces
Merch.
Factor
Non-sawtimber products include only the top portion of a saw log tree and those trees less than the minimum sawtimber specifications (C(T)2.2), and containing at least 50% pulpable woodfiber in terms of gross cubic volume (C(T)6.801).
Diameter Breast High (d.b.h.) is not applicable for the non-sawtimber portion of sawtimber trees.
(only applicable to weight scale sales)
(Enter from Species
Volume Summary)
Full Name for
Contract
(Major Species
Group)
Cedar Products - Net
Merch. Factor - Refer to C(T)6.804#
Contract species need to be grouped to reflect differences in utilization and/or how species shall be grouped in A(T) 2 of the
Timber Sale Contract.
All Non-sawtimber shall be grouped as Combined Softwood
(CS) under Contract Species
Fill out Minimum Specifications below to reflect how sawtimber & non-sawtimber were cruised.
From the list below select the description of non-sawtimber products that reflects how the products were cruised and input in NCS.
The description below is to be included in A(T)2 of timber sale. (Refer to non-sawtimber appraisal guide for more details & instructions).
Check one
EXTERNAL YARDING DISTANCE EXTERNAL YARDING DISTANCE
Unit # % Slope Unit # % Slope
1a 435 700 15% 40 265 1400 30%
2 76 700 30% 41 204 800 45%
3c 54 500 32% 7 457 900 500%
5 265 2000 3800 3200 30% o21 10 300 8%
6 170 960 25% o22 14 300 8%
8 171 600 3000 2800 33% o23 14 300 8%
9 86 1000 42%
10 880 800 43%
10a 135 500 45%
10b 643 800 28%
10c 271 1230 30%
30%
20%
20%
46%
50%
20%
LR1 68 300 8%
LR2 19 300 8%
LR3 7 300 8%
30%
8%
8%
30%
20 655 750 30%
20a 307 350 25%
20b 147 350 25%
21 1256 900 44%
22 267 850 45%
23 40 250 45%
Tractor Forwarder Helicopter Ground Lead
420 3326 VOL 492 0 VOL 480 0 VOL 450 0 VOL
846 AVE EYD 0 AVE EYD 0 AVE EYD 0 AVE EYD
Skyline
430 3590 VOL
834 AVE EYD Page 10
Volume
CCF
EYD
Feet
Top
Elevation
Bottom
Elevation
Volume
CCF
EYD
Feet
Top
Elevation
Bottom
Elevation
SLOPE
NOTE!
Appraisal Point:
Total Sawtimber Tributary Volume:
(Haul Appraisal for Sawtimber only. Non-Sawtimber included in Non-Sawtimber Adjustments)
Sawtimber
Paved Unpaved Trib Vol
2400B 7 40 41 o21 22 o23 0.68 1217 0.12
2400 7 40 41 o21 22 o23 10a 10b 8 9 6 5 3c 10 10c 1.2 3892 0.675
16-1 2 1a 0.65 511 0.048
16-1 7 40 41 o21 22 o23 10a 10b 8 9 6 5 3c 10 10c 0.75 3892 0.422
16-1 2 1a 0.3 511 0.022
16-1 7 40 41 o21 22 o23 10a 10b 8 9 6 5 3c 10 10c 0.25 3892 0.141
16-1 2 1a 0.25 511 0.018
152 23 22 20b 21 20 20a 4.32 2672 1.669
301 23 22 20b 21 20 20a 3.9 2672 1.507
2720 23 22 20b 21 20 20a 2.35 2672 0.908
Hwy200 23 22 20b 21 20 20a 8 2672 3.091
Hwy200 all 5 6916 5
WTD Total Paved Miles WTD Total Unpaved Miles
(Sheet 1) (Sheet 1) (Sheet 1) 13.6
Page 11a
HAUL
6,916
(The appraisal point is most advantageous when total transportation cost, including road work, are less than other appraisal points. Appraise to a mill where timber product can be processed. SBA Set Aside Sales are appraised the same way; not to the nearest SBA mill)
WDT Total Miles
Road
No.
Miles WTD
MILESUnits
8.1 5.5
WTD Haul Note
TRL
WTD HAUL MILES
NON-SAWTIMBER SUMMARY
DATA INPUT
Total Nonsawtimber Volume (CCF)
(Primary + Secondary) 9,601 0 enter cable pri nonsaw CCF
Total Nonsawtimber Volume (Tons)
(Primary + Secondary) 25,205 0 enter cable pri nonsaw tons
Tons / CCF for nonsawtimber material 2.63 Adjustment
Total One Way Weighted Haul Miles 17 3 Adjustment
Logging System
All Ground
Based All Cable
Range of Data
Input
Nonsawtimber Primary Product (CCF) 4,418 3,674
Net CCF / Acre Harvested for nonsawtimber primary product 12.7 10.5
4 - 39 green
CCF / acre
Average DBH Harvested for nonsawtimber primary product 6.4 6.4 6 - 10.5 inches
Average Yarding Distance (Feet) 846 834 600 - 1800 feet
Nonsawtimber Primary Product
(Tons) 11,598 9,645 Net Tons / Acre Harvested for nonsawtimber primary product 33.2 27.6
Removal included under Mandatory Item 1 and Optional Item 9
No Appraisal Allowance For Nonsawtimber
RIGHTS - OF - WAY
Road # Length
16.1 1.56 mile
$/CCF $/TON
$1.39 $0.50
$0.00 $0.00
$1.39 $0.50 ( A )
$0.86 $0.32 ( B )
$0.87 $0.32 ( C )
$3.12 $1.14
(Entries for 2400 - 17)
$ $2.05 CCF
$ $7.45 CCF
(Include Cost share Agreements)
Road Name Type of Agreement Agreement with (Names)
16.1 Temp Road Agree DNRC and FS
Total Performance (Part A)
ROAD MAINTENANCE
(From Road Maintenance Appraisal Summary, sheets are attached)
Contract Rates
Total Performance Recurrent Maintenance (Part A)
C(T)5.31 - Recurrent Maintenance
C(T)5.312 - Reconditioning
(Attach worksheets with road costs)
Appraisal Rates
Total Required Deposits
Total Road Maintenance Costs (Performance + Deposits)
Refer to Road Maintenance Appraisal for Road Reconditioning cost per road segment.
Total Required Deposits (Recurrent and Deferred) (Part B)
(Enter appropriate rate in TIM - Gate 4 - Road Maint. Plan - ADVR105
C(T)5.32# - Total Required Deposits (Part B)
C(T)5.314 - Total Dust Abatement (Part C)
TOTAL MAINTENANCE COST (Parts A-B-C)
Tractor Skyline Forwarder TOTAL
Acres 349 0 333 0 0 682
Volume 3326 0 3590 0 0 6916
EYD 846 0 834 0 0
FALSE
LOGGING METHOD SUMMARY
Ground
Lead
Aerial
Heli
Construction or Reconstruction of roads not included on haul route are to be included as Stewardship
Projects (K-G9#) and Appraised using Davis Beacon Wages.
ROAD CONSTRUCTION / RECONSTRUCTION
Check Box if road(s) being Constructed or Reconstructed are Specified Roads needed for harvesting Included Timber.
"Check Box" if Brush disposal is to be included as a contractual requirement under TRUE
K-G.7 Hazard Reduction and Site Preparation.
Forest Service Rate (Fund Code BDBD) $0.00 Total $ (a) $0.00 CCF
Purchaser Rate (Fund Code PPPP) $6,254.00 Total$ (b) $0.90 CCF
$0.90 CCF
Forest Service Rate Per CCF (Fund Code BDBD) $0.00 CCF
$0.00 TON
FALSE Lump Sum BD Deposits for Weight Scaled Sales
(Sheet 1) Page 16A
BRUSH DISPOSAL
Stewardship Contract From FACTS - Detailed Listing of BD and Purchaser Slash Treatment Activities
Appraisal Rates for 2400-17 (Applied to Sawtimber only)
TOTAL: (a) + (b) =
Contract Rates (Applied to All Products)
Cutting Unit Number Required Deposits
Total Cost $0.00
Check Box to use.
EROSION CONTROL
The following seed and fertilizer mix is the standard mix to be used on the Kootenai.
This mix is to be included in C(T)6.601# - Erosion Control Seeding and Special Project
Specifications (SPS) 625.05 in the road package.
Make sure that the seed mix and fertilizer are the same in both contract and road package.
Site specific areas, such as gravel pits and very dry sites may call for more and/or different species in the mix. Document below the rational for deviation from the standard seed mix.
Annual Rye or Winter Wheat 18
Hard Fescue 6
Orchard Grass 6
TOTAL 30 TOTAL 240
Crossdrains
Installation of crossdrains on temporary roads, skid trails and firelines are included in their respective cost allowance.
Scarification acres @ per acre =
Seed and Fertilizer
Temporay Roads seeding is included in Temporary Road cost
Temporary Roads chains X 1/2 / 10 = 0.0 acres
Firelines chains X 1/4 / 10 = 0.0 acres
Skid Trails
Number of acres to be skidded using ground based systems times the percentage of area requiring seed and fertilizer. 388 acres X 5% = 19.4 acres
Number of acres to be yarded using cable systems times the percentage of area requiring seed and fertilizer. 294 acres X 2% = 5.9 acres
Landings
Number of landings 32 X 0.25 acres per landing = 8.0 acres
TOTAL 33.3 acres
Species of Seed Pounds per Acre Type of Fertilizer
$0.00
Pounds per Acre
25-10-10 or 27-12-12 or
34-16-10
Seed mix, fert., labor costs:
Lbs / Acre $ / Lb $ per Acre
Annual Rye or Winter Wheat 18 X $0.79 = $14.22
Hard Fescue 6 X $3.19 = $19.14
Orchard Grass 6 X $1.69 = $10.14
Fertilizer 240 X $0.20 = $48.00
*Labor per Acre = $249.00
$ per acre $340.50
Total cost for
SEEDING 33.3 acres X $43.50 $/acre =
FERTILIZER 33.3 acres X $48.00 $/acre =
LABOR 33.3 acres X $249.00 $/acre =
SCARIFICATION
TOTAL
COST / 6916 CCF = $1.64 PER CCF
* Engineers estimate Page 114 of the Cost Guide Item Labor Rates.
Document Rational for Changes to Standard Seed Mix.
$11,338.65
$1,448.55
$1,598.40
$8,291.70
$0.00
$11,338.65
OTHER CONTRACTUAL RQUIREMENTS ( A )
Other - Include Contractual Obligations Requiring Performance Bond Coverage
(Road closure, Barriers, Trail Restoration, etc.)
ITEM # X COST = TOT COST
1 X $1,500.00 per gate = $1,500.00
35864 X $0.05 per XXX = $1,793.20
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
Cost / 6916 CCF = $0.48 CCF
Subtotal Other Contractual Requirements ( A ) = $0.48 CCF
$3,293.20
Purchase and install 1 gates
Road Use Fee $.05/Tom
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
OTHER CONTRACTUAL REQUIREMENTS ( B )
Cost Cost per
Per oz UOM
$0.00 $0.00 mile
$0.00 $0.00 mile
$0.00 $0.00 mile
$0.00 $0.00 mile
Price qoute for herbicide obtained from:
Sufactant & Dye
.32 oz/gal H2O $0.68/acre = $2.45/ mile
Labor Rate $40/ hour (2 Miles per hour)
Miles of road to be sprayed: 0 miles
Herbicide to be applied: Miles $ UOM Tot Cost
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Sufactant & dye: 0 $2.45 $0.00
Application Cost (Labor): 0 $20.00 $0.00
Misc. Expensense: 0 $32.00 $0.00
TOTAL WEED TREATMENT: $0.00 cost / 6916 CCF = $0.00 CCF
ON-SITE EQUIPMENT WASHING C(T)6.351#
Cost allowance for washing off-road equipment Prior To Leaving locations identified in EIS/EA
Number (pieces of equipment) Number of seasons
Cleaning costs per piece $0.00 CCF 6916
Total cost for washing equipment per CCF $0.00 CCF
Subtotal Other Contractual Requirements (B) $0.00 CCF
The cost allowance for herbicide application has been based on the following assumptions; 300 gallon sprayer with herbicide injectors (not tank mixed); 20 gallon of carrier/ac; one trip will be required for each herbicide per road; labor rate and production includes mix, loading, cleanup and daily documentatiion; misc. expenses include equipment maintenance and depreciation, herbicide storage and handling and licensing fees. One mile of road with an average ROW of 30 feet is equal to 3.6 acres. Herbicides approved for use are listed in C(T)6.27# under Technical Spraying
Specifications.
Application Rate oz per acre
Herbicide
(Common name)
Wilbur Ellis
MISCELLANEOUS CONTRACTUAL REQUIREMENTS ( C )
(Contractual Obligations That Would Not Require Coverage Under The Performance Bond)
Stump Shoveling (Not required under normal operating/winter conditions. Include if clippers not allowed)
# stumps X $0.00 per stump =
Cost / 6916 CCF = $0.00 CCF
Snow Plowing
# miles X $0.00 per mile X # plowings =
Cost / 6916 CCF = $0.00 CCF
Miscellaneous: (Helicopter Landing Construction, Traffic Control etc…)
ITEM # X COST = TOT COST
X per XXX = $0.00
X per XXX = $0.00
X per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
X $0.00 per XXX = $0.00
Stewardship Base Rate Adjustment =
Cost / 6916 CCF = $0.00 CCF
Subtotal Miscellaneous Contractual Requirements ( C ) = $0.00 CCF
Total Other Contractual Requirements (A+B+C) $0.48 CCF
Brush Disposal (Purchaser and FS) $0.00 CCF
Total Environmental Protection Cost $0.48 CCF
$0.00
N/A N/A
$0.00
$0.00
$0.00
$0.00
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
TEMPORARY ROADS
1.83 Miles
Temporary Road #1 Cost $
Temporary Road #2 Cost $
Temporary Road #3 Cost $
Temporary Road #4 Cost $
Temporary Road #5 Cost $
TOTAL TEMPORARY ROAD COST =
(Total Temporary Development Costs)
COST / 6916 CCF = $2.11 CCF
Cost Guide for Temporary Roads
Temporary Road Seeding, Fertilizing and Obliteration Costs per CCF $0.59
UNUSUAL CONDITION ADJUSTMENTS
Cost $ / 6916 CCF = $0.00 CCF
Page 22a
$0.00
$3,169.00
$8,120.00
$0.00
$14,566.00
$14,566.00
Temp A-west bdy 20 (New 600') and Temp B = 3700' (unit 20,21)
Unit 1A http://www.fs.fed.us/r1/projects/costguide_index.shtml
$1,726.00
$1,551.00
Temp A (existing) West Bdy Unit 20
Temps units 9,10A,7
Appendix G-2 http://www.fs.fed.us/r1/projects/costguide_index.shtml
Unit or Road Number:
Reference to Cost estimating procedures for temporary roads from Cost Guide pages 100-104
Average Side Slope 0 %
Length 2300 Feet 0.44 Miles
Volume per Acre 0
(Note: Do not adjust project costs for inflation or deflation)
Costs Prer Mile
Clearing and Grubbing (Table T-1) = $0.00 Mile
Excavation (Table T-1) = $1,320.00 Mile
Seeding (Table T-1) = $730.00 Mile
Obliteration (Table T-1) = $700.00 Mile
Total Unit Cost Per Mile =
Baisc Cost Total X Length =
Drainage Structures
4 Dips X $125.00 = $500.00
18" CMP X $0.00 = $0.00
other CMP" X $0.00 = $0.00
Drainage Cost Total =
Other Requirements
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
Other Cost Total =
Subtotal (Basic + Drainage + Other) =
Mobilization (Table T-4) 7% =
Subtotal =
TOTAL COST / 1.06 Profit =
Total Cost to be entered on 2400-17
Page 22b
TEMPORARY ROAD COSTS #1
Temp A (existing) West Bdy Unit 20
$2,750.00
$1,210.00
$500.00
$1,726.00$1,830.00
$0.00
$1,710.00
$120.00
$1,830.00
Average Side Slope 20 %
Length 1150 Feet 0.22 Miles
Volume per Acre 10
(Note: Do not adjust project costs for inflation or deflation)
Costs Prer Mile
Clearing and Grubbing (Table T-1) = $3,570.00 Mile
Excavation (Table T-1) = $1,620.00 Mile
Seeding (Table T-1) = $730.00 Mile
Obliteration (Table T-1) = $1,060.00 Mile
Total Unit Cost Per Mile =
Baisc Cost Total X Length =
Drainage Structures
Dips X = $0.00
18" CMP X $0.00 = $0.00
other CMP" X $0.00 = $0.00
Drainage Cost Total =
Other Requirements
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
Other Cost Total =
Subtotal (Basic + Drainage + Other) =
Mobilization (Table T-4) 7% =
Subtotal =
TOTAL COST / 1.06 Profit =
Total Cost to be entered on 2400-17
Page 22c
TEMPORARY ROAD COSTS #2
Temps units 9,10A,7
$6,980.00
$1,536.00
$0.00
$1,644.00
$1,644.00 $1,551.00
$0.00
$1,536.00
$108.00
Average Side Slope 0 %
Length 2500 Feet 0.47 Miles
Volume per Acre 5
(Note: Do not adjust project costs for inflation or deflation)
Costs Prer Mile
Clearing and Grubbing (Table T-1) = $3,220.00 Mile
Excavation (Table T-1) = $1,320.00 Mile
Seeding (Table T-1) = $640.00 Mile
Obliteration (Table T-1) = $700.00 Mile
Total Unit Cost Per Mile =
Baisc Cost Total X Length =
Drainage Structures
3 Dips X $125.00 = $375.00
18" CMP X $0.00 = $0.00
other CMP" X $0.00 = $0.00
Drainage Cost Total =
Other Requirements
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
Other Cost Total =
Subtotal (Basic + Drainage + Other) =
Mobilization (Table T-4) 7% =
Subtotal =
TOTAL COST / 1.06 Profit =
Total Cost to be entered on 2400-17
Page 22d
TEMPORARY ROAD COSTS #3
Unit 1A
$5,880.00
$2,764.00
$375.00
$3,359.00
$3,359.00 $3,169.00
$0.00
$3,139.00
$220.00
Average Side Slope 30 %
Length 3700 Feet 0.70 Miles
Volume per Acre 10
(Note: Do not adjust project costs for inflation or deflation)
Costs Prer Mile
Clearing and Grubbing (Table T-1) = $3,980.00 Mile
Excavation (Table T-1) = $2,240.00 Mile
Seeding (Table T-1) = $870.00 Mile
Obliteration (Table T-1) = $2,615.00 Mile
Total Unit Cost Per Mile =
Baisc Cost Total X Length =
Drainage Structures
10 Dips X $125.00 = $1,250.00
18" CMP X $0.00 = $0.00
other CMP" X $0.00 = $0.00
Drainage Cost Total =
Other Requirements
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
### X $0.00 = $0.00
Other Cost Total =
Subtotal (Basic + Drainage + Other) =
Mobilization (Table T-4) 7% =
Subtotal =
TOTAL COST / 1.06 Profit =
Total Cost to be entered on 2400-17
Page 22e
TEMPORARY ROAD COSTS #4
Temp A-west bdy 20 (New 600') and Temp B = 3700' (unit 20,21)
$9,705.00
$6,794.00
$1,250.00
$8,607.00
$8,607.00 $8,120.00
$0.00
$8,044.00
$563.00