Coronado NF IDIQ Roads Solicitation/Specs

View the file

Other files

File Type Posted
Combined Award Information List.xls XLS spreadsheet
sf-30_Amend_#2_IDIQ_Roads.rtf RTF text file
Amendment2_Economic_Fuel_Price_Adj.doc DOC document
RFP_Coronado_Amendment1.doc DOC document
sf-30_Amend_#1_IDIQ_Roads.rtf RTF text file
Amendment1_Pre_Bid_Meeting_Notes.doc DOC document
Sheet2-B_Roadsaver_silicon_sealant-Apply.pdf PDF
Sheet6-Concrete-Repair-Dwg.pdf PDF
Hot_Tar_Sealant.pdf PDF
Davis_Bacon_Wages_Hwy_PimaCo.doc DOC document
Sheet9-gate-fabrication.pdf PDF
Sheet8-gate_30ft_fabrication.pdf PDF
Sheet3-C_polyflex_type2-Product.pdf PDF
Sheet7-gate_16ft_fabrication.pdf PDF
CNF_Map.pdf PDF
Davis_Bacon_Wages_Hwy_SantaCruzCo.doc DOC document
Sheet1-A_roadsaver_silicone_Product.pdf PDF
Sheet4-D_polyflex-Type2-Apply.pdf PDF
Sheet5-Concrete-New-Details.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-8197-S-09-0012

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

X NEGOTIATED (RFP)

3. DATE ISSUED

03/04/09

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

USDA Forest Service Coronado National Forest Supervisor’s Office – Acquisition Management

300 W Congress

Tucson AZ 85701

SAME AS BOX NO. 7

9. FOR INFORMATION

CALL:

A. NAME

SYLVIA NUNEZ

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 520-388-8311

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

The USDA Forest Service, Coronado National Forest, Tucson, Arizona, has a requirement for Forestwide Road Maintenance, Repairs, Construction, Trails, Installation of Culverts and Cattle-guards, Small Building Construction (non-residential), and other Miscellaneous Structure projects. All of this work is covered under the Davis-Bacon Act, for which wage determinations for various locations will be incorporated into the solicitation packages. This work may consist of road blading, dozer maintenance on roads, hauling, aggregate and borrow placement, culvert installations, clearing roadsides and/or trails, constructing trails, miscellaneous road and parking lot construction or repair, concrete and asphalt patching and or paving, road crack sealing, small construction of non-residential buildings, sign construction, guardrail construction, and other miscellaneous work. The Government anticipates making multiple awards (MAS) of Firm Fixed-Price IDIQ (Indefinite-Delivery / Indefinite-Quantity) contracts under the Request For Proposal (RFP) format. This is a 100% Small Business Set-Aside. The Small Business size standard is $31.0 Million under NAICS code 237310.

Price Range The Government's estimate is:

Some Task Orders below $25,000

Some Task Orders between $25,000 and $100,000.

Some Task Orders between $100,000 and $250,000.

SomeTask Orders between $250,000 and $500,000.

11. The Contractor shall begin performance within 15 calendar days and complete it within time specified calendar days after receiving

FORMCHECKBOX

award, X notice to proceed. This performance period is X mandatory, FORMCHECKBOX negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

X YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:30pm local time 03/31/09. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, X is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101

STANDARD FORM 1442 (REV. 4-85)

Computer Generated

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Construction and Maintenance

(e)

Aggregate/ Base Surface Maintenance

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D Crushed Rock Surfacing, Stock Piled

1 ½” Minus

¾” Minus

Pit Run

Rip Rap 1’- 4’ 1 ½” Minus

¾” Minus

Pit Run

Rip Rap 1’-4’ Circle Pay Unit

CY or Ton

CY or Ton

CY or Ton

CY or Ton

-A

-B Loader, *Size_________, (Min. 8 Hrs.) - Rate Includes Operator.

Loader, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator

Loader

Loader

HR

HR

-B Surface Blading – Per Hour Motor Grader. Grader *Size ______, (Min. 8 Hrs.), Rate Includes Operator and Mobilization, Aggregate Placement – Per Hour Motor Grader. Grader, *Size ______, (Min. 8 Hrs.) Rate Includes Operator and Mobilization, Grader1

Grader2

HR

Haul Vehicles –

Per Hour Belly Dump Rate. Rate Includes Operator & Mobilization

Number available _________

Belly Dump
HR

-B Haul Vehicles – End Dump, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator & Mobilization

Number available _________

End Dump, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator & Mobilization

Number available _________

End Dump

End Dump

HR

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Aggregate/ Base Surface Maintenance

ZONE 1
ZONE 2
ZONE 3

-A

-B Bull Dozer, *Size_________, (Min. 8 Hrs.) - Rate Includes Operator.

Bull Dozer, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator

Dozer

Dozer

HR

Grid Roller, *Size ________, (Min. 8 Hrs.)

Grid Roller
HR

-B

Track Excavator, *Size __________, (Min. 8 Hrs.) – Rate Includes Operator

Track Excavator, *Size __________, (Min. 8 Hrs.) – Rate Includes Operator

Excavator

Excavator

HR

-B

-C

-D

-E Track Excavator, *Size __________,W /

Hammer, *Size ___________lbs.

– Rate Includes Operator

Track Excavator, *Size __________,W /

Hammer, *Size ___________lbs.

– Rate Includes Operator

Track Excavator, *Size __________,W /

Hammer, *Size ___________lbs.

– Rate Includes Operator

Operating Rate for Track Excavator W/ Hammer

-Rate Includes Operator

Permit to Transport Track Excavator W/ Hammer.

-Rate for 30 day Permit Excavator w/ Hammer

Excavator w/ Hammer

Excavator w/ Hammer

Operator

Permit

HR

Week

Month

Ea.

-B Backhoe, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator

Backhoe, *Size ________, (Min. 8 Hrs.) – Rate Includes Operator

Backhoe

Backhoe

HR

Transport, *Size ________, - Rate Includes Operator
Transport
HR

ITEM NO.

SUPPLIES/ SERVICES

(b)

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Aggregate/ Base Surface Maintenance

ZONE 1
ZONE 2
ZONE 3

Vibratory Steel Wheel, Compactor *Size ________, - Rate Includes Operator

Compactor
HR

Bobcat, *Type ________, (Min. 8 Hrs.) – Rate Includes Operator

List Attachments: ___________________________

Bobcat
HR

Tractor with Gannon, *Type ________, (Min. 8 Hrs.) – Rate Includes Operator

List Other Attachments:

Bobcat
HR

Laborer

Laborer
HR

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Aggregate/ Base Surface Maintenance

ZONE 1
ZONE 2
ZONE 3

-A

-B Service Vehicle, *Type________, (Rate Includes Operator & Mobilization

(ie: 4x4 Truck, tractor etc.)

Service Vehicle, *Type________, (Rate Includes Operator & Mobilization

(ie: 4x4 Truck, tractor etc.)

Service Vehicle

Service Vehicle

HR

Welding Unit, Shall include, Cutting torches, Arc Welder and Wire Feed, Grinders & Misc. (Rate Includes Operator and Mobilization)
Welding Unit
HR

-B

-C Water Truck, Self Drafting, *Size ________ Gallons, - Rate Includes Operator & Mobilization

Water Truck, Self Drafting, *Size ________ Gallons, - Rate Includes Operator & Mobilization

Additional Water Fee to be Included as dollars per 1000 Gallons Water Truck

Water Truck

Water

HR

1000/gal.

-B Vibratory Steel Wheel, Compactor *Size ________, Rate Includes Operator Mobilization, One way miles from *___________, to job site. (One time per job)

Compactor Mobilization

HR

Mile

Clearing

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

Roadside Clearing and Brushing Crew (Crew = truck plus 2 Sawyers), work as identified by F.S.

Limbing (Add) Backhoe and bucket equipped with Safety Harness for use by Roadside Clearing and Brushing crew. Rate Includes Backhoe Operator

Roadside Chipping as identified by F.S.

Crew = 2 Laborers with chipper

Mobilization, One way miles from *___________, to job site. (One time per job)

* Specifiy mobilization origin location (ie: Tucson)

Sawyer

Backhoe equipped

Crew

HR

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Dust Palliative

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D Application Rate per Task Order

Product:

Lignosulfonate –

Minimum order of concentrated product

4500 Gallons (Truckload)

Suppliers: DustPro (602) 251-3878

Georgia Pacific (360) 733-4410

Lyman Dust Control (406) 543-3377

Mobilization, One way miles from *____________ to job site. (One time per job include skid tank)

* Specifiy mobilization location (ie: Tucson) Computerized Rate Controlled Applicator

Minimum 4 hours

Computerized Rate Controlled Applicator

Standby Time Rate

Ligno-

Sulfonate

Mobilization

Applicator

Applicator

Standby Rate

Gal

Hr

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Roadway Misc. Structures

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

Cattle Guards, HS-20 Loading, Steel, Pay Item to include necessary hardware (brackets, bolts, etc.) for installation.

7.5 Foot Section

15 Foot Section

Cattle Guard Wings

Swing Gates, Fabricated per Attached Drawings

16 Foot Swing Gate

30 Foot Swing Gate

Items 22 & 23 Do not include delivery or installation. Delivery and Installation will be provided under other applicable pay items.

CG – 7.5’

CG – 15’

CG-Wings

16’ Gate

30’ Gate

Ea.

Pair

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Culvert Materials, Installation and Repair

ZONE 1
ZONE 2
ZONE 3

-A (18)

-B(24)

-A(18)

-B(24)

-C

-D

-E

-F

-G

-H

Contractor shall supply backhoe, wacker, acetylene torch, laborers and other miscellaneous items necessary for repair or extension of culvert. Work shall include removal, disposal of existing culvert and replacement of culvert as staked by F.S.

Contractor shall supply backhoe, laborers and other miscellaneous items necessary for installation of culvert. Culvert shall be installed in a 2 sack concrete slurry mix, with slurry mix min. 6” on all sides of culvert. Work shall include removal, disposal of existing culvert and replacement of culvert as staked by F.S.

Concrete Slurry for Culvert Installation. Mix shall be 2 sack cement per C.Y.

Mobilization, (One way miles from *___________, to job site. (One time per job)

* Specifiy mobilization location (ie: Tucson)

18” Galvanized Culvert

24” Galvanized Culvert

18” Galvanized Band

24” Galvanized Band

Note: Items 25 E thru 25 H do not include delivery. Borrow and or bedding material as needed shall be paid for under item no.’s 1-5.

Extension of Existing

New Installation

Concrete Slurry

Mobilization

Culvert Materials 18” L.F.

24” L.F.

18” L.F.

24” L.F.

C.Y.

Mile

18” L.F.

24” L.F.

18” Ea, 24” Ea.

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Sign Installation and Repair

ZONE 1 ZONE 2 ZONE 3

-A(MP)

-B(WP)

-C(CP)

Work shall include removal & disposal of existing signs and replacement of single sign and single post as staked by Forest Service. Contractor shall supply laborers and other miscellaneous items necessary for installation and/ or repair of signs. Signs shall be installed in accordance with Forest Service, Sign Installation Guide, 9771-2813-MTDC, which will be provided.

Carsonite Post (Install Only)

Item 26 Note: Forest Service shall provide new signs, bolts, posts and decals as necessary per installation.

Metal Post

(Install Only)

Wood Post

(Install Only)

Carsonite Post

Each

Each

Each

Roadway and Parking Lot Striping

ZONE 1
ZONE 2
ZONE 3

-A(M)

-B(Y4)

-C(W4)

-D(12)

-E(AL)

-F(DA)

Work shall include brooming and all miscellaneous preparation prior to painting. Mobilization shall be paid at a one-way per mile rate from business location to project site.

Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project. Contractor to supply waterborne traffic paint and retroreflective glass beads, painting truck and support equipment.

Accessible Logo and directional arrows shall be

White on asphalt pavements and yellow on concrete pavements.

Note:

Forest Service shall provide site plan for striping layout unless contractor is notified in writing that existing scheme is to be replicated at which point contractor shall generate striping site plan. Paint shall be as per 718.14 Waterborne Traffic Paint.

Mobilization

Yellow 4”

White 4”

White 12” Stop Bar

Accessible Logo

Directional Arrows

Mile

Ft

Ft

Ft

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Asphalt Roadway Patching

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

-E

-F

Asphalt

UPM

Cold Mix

Hot Mix (MAG spec 3/8” hot mix per MAG spec 710)

Haul Vehicles –

End Dump, *Size ________, Round Trip Time from Source to Job Site and Return.

Work shall include removal of failed material as marked, re-compaction of existing subgrade, placement of new material and compaction with a steel wheel roller. Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project.

Mobilization, One way miles from *___________, to job site. (One time per job)

* Specifiy mobilization location (ie: Tucson, etc.)

Note:

Forest Service shall mark roadway area to be repaired. All cuts shall be neat providing a uniform appearance. Tack coat shall be included in S.F. unit price

UPM

Cold Mix

Hot Mix

End Dump

Crew & Equipment

Ton

Ton

Ton

Hr.

SF

ITEM NO.

SUPPLIES/ SERVICES

(b)

QUANTITY

Or ITEM

(c)

UUNIT

(d)

UNIT PRICE

Asphalt Roadway Seal Coats

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

-E Fog Seal application rate .1 gal./ S.Y.

Flush Seal application rate .15 gal/S.Y.

Slurry Seal application rate will vary

1:1 Dilution, tons of diluted product:

ERA1 by Copperstate or equal

ERA25 by Copperstate or equal

Boot Truck, Round Trip Time from Source to Job Site and Return.

Power Broom

Mobilization, One way miles from *____________ to job site. (One time per job)

* Specifiy mobilization location (ie: Tucson)

ERA1

ERA25

Boot Truck

Power Broom

Ton

Hr

Asphalt Roadway Surface Treatment

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

-E

-F

-G

-H CRS – 2LM by Copper State or equal

CRS – 2 by Copper State or equal

Boot Truck, Round Trip Time from Source to Job Site and Return.

3/8” Chips per Table 409-1 & 49-2 Haul Vehicles –

End Dump, *Size ________, (Min. 8 Hrs.)

Round Trip Time from Source to Job Site and Return.

Placement: 1 Spreader with 2 Laborers, 2 Pneumatic Rollers with Operators.

Power Broom

Mobilization, One way miles from *____________ to job site. (One time per job)

* Specifiy mobilization location (ie: Tucson)

CRS – 2LM

CRS - 2

Boot Truck

Chips

End Dump

Equipment w/ Crew

Power Broom

Ton

Hr

Ton

Hr

Hr

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or ITEM

(c)

UNIT

(d)

UNIT PRICE

Asphalt

-B

-C

-D

Asphalt Placement – Overlay or New Placement, Base preparation under other items or done by others. Site Plan to be provided by Forest Service COR

Asphalt Hot Mix (MAG spec 3/8” hot mix per MAG spec 710) Total Quantity Required less than 300 Ton

Asphalt Hot Mix (MAG spec 3/8” hot mix per MAG spec 710) Total Quantity Required greater than 300 Ton Haul Vehicles –

End Dump, *Size ________, Round Trip Time from Source to Job Site and Return.

Haul Vehicles –

Belly Dump, *Size ________, Round Trip Time from Source to Job Site and Return.

Placement shall include a minimum of a Lay down machine, 2 pneumatic rollers and 2 laborers.

Quality control, include technician with nuclear gauge to establish and monitor rolling pattern for compaction, check depth, temperature and compaction.

Hot Mix

≤300 Ton Hot Mix

>300 Ton End Dump

Belly Dump

Placement

Crew & Equipment Quality Control Ton

Ton

HR

HR

ITEM NO.

SUPPLIES/ SERVICES

(b)

QUANTITY

Or Item (c)

UNIT

(d)

UNIT PRICE

Asphalt Pavement Crack & Joint Sealing

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

-E -F Crafco 34231 or equal

Application: 2 laborers, 1 Driver

Preparation: Air Compressor, 1 Driver, 1 Laborer

Power Broom

Crack Sealing Applicator

Crack Sealing Applicator

Mobilization, One way miles from *____________ to job site. (One time per job)

* Specifiy mobilization location (ie: Tucson)

Sealant Application Crew

Prep Equip. w/ Crew

Equipment Rental

Equipment Rental

Ton

Hr

Day Week

Slope Reinforcement and Retaining Walls

-B

-C

-D Mechanically Stabilized Earth-type roadway edge retaining structure (MSE Wall), supplied, site excavated, materials installed and finished, 8 foot width, max height 8 feet (may be less), length as marked in field: Backhoe, operator, 2 laborers, service/supply truck, traffic control signage. Per specification SPS 255_1 R3_COR. Measurement is by square feet of all wire facing only.

(add) Haul and disposal of excavated unsuitable material within five miles of excavation site and importation of ¾” minus aggregate base course for MSE Wall construction. Includes haul truck, material purchase and handling.

(add) Install Culvert pipe through MSE Wall per wall manufacturer’s instructions. Culvert paid for separately.

Mobilization, (One way miles from *___________, to job site. (One time per job)

MSE Wall

MSE ABC

MSE Culv

Mobilization Sq. Ft.

Ton

Ea

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or Item (c)

UNIT

(d)

UNIT PRICE

Concrete Crack Sealing

ZONE 1
ZONE 2
ZONE 3

-A

-B

-C

-D

Work shall include cleaning and preparation of concrete joints, installation of backer rod and application of siloxane-type sealant or approved equal. Mobilization shall be paid at a one-way per mile rate from business location to project site.

Preparation: Air Compressor, 1 Driver, 1 Laborer

Power Broom

Contractor shall supply laborers and other miscellaneous items necessary for layout and completion of the project.

Siloxane Sealant

3-Man Crew

Prep Equip. w/ Crew

Siloxane Sealant

Hr

Gal

-B

-C

-D

-E -F Same work as above, with changes to accommodate asphaltic concrete sealing – 4 Man Crew, Hot Tar Sealant, or approved equal.

Crack sealing applicator rental equipment:

Crack sealing applicator rental equipment:

Preparation: Air Compressor, 1 Driver, 1 Laborer

Power Broom

Crafco 34231 Sealant or approved equal.

4-Man Crew

Equip Rental

Equip Rental

Prep Equip. w/ Crew

Sealant

Hr

Day

Week

Hr

Lb

ITEM NO.

SUPPLIES/ SERVICES

QUANTITY

Or Item (c)

UNIT

(d)

UNIT PRICE

Concrete Crack Sealing

ZONE 1
ZONE 2
ZONE 3

-A

-C

Traffic Countrol Flagging Operation—2 man crew. Conform flagging activities and traffic control plan to Manual on Uniform Traffic Control Devices. Signing includes six construction-type retroreflective signs on flexible mounts, flagger’s vests, paddles and flags. Mobilization shall be paid at a one-way per mile rate from business location to project site.

(add) Pilot Car and pilot car driver.

2-Man Crew

Pilot Car w/ operator

HR

MI

SECTION B

AGAR 452.216-73 Minimum and Maximum Contract Amounts (FEB 1988) During the period specified in FAR clause 52.216-18, ORDERING, the Government shall place orders totaling a minimum of $500 , but not in excess of $500,000 for each contract awarded under Multiple Award IDIQ format. Total of all awarded contracts awarded, combined, shall not exceed $5 Million.

SPECIFICATIONS INCLUDED BY REFERENCE:

The specifications are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resulting work.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03, U.S. Customary Units

These specifications can be ordered from FHWA. For information on how to order books, go to the FHWA’s website, http://www.wfl.fha.dot.gov/design/specs/fp03.htm.

UNIFORM STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, Sponsored and Distributed by the Maricopa Association of Governments (“MAG specs”), 2009 edition, website, http://www.mag.maricopa.gov/detail.cms?item=5192 The following specifications from FP-03 are applicable:

SECTION

TITLE

Terms, Format, and Definitions

Scope of Work

Control of Work

Control of Material

Acceptance of Work

Measurement and Payment

DIVISION

Project Requirements

Earthwork

Aggregate Courses

Asphalt Pavements and Surface treatments

Incidental Construction

Material

And all specifications referenced by the above specifications.

Special Project Specifications Listings

Special Project Specification (SPS) may add to, delete from, or modify the FP-03. Only those specifications shown on the SPS List are applicable to this project and are included in full text.

SECTION

SPS_FHWA_FP03

General Forest Service SPS to FP-03.

SPS_255_1_R3_COR

Mechanically Stabilized Earth Walls, Wire Faced, For Roadway Edge Stabilization.

Asphaltic concrete pavement is subject to MAG specs in this contract.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Scope of Contract The project consists of the following work: Roadway and parking lot construction and maintenance, trail maintenance and construction, surfacing, clearing, culvert installation, sign installation, striping, asphalt and concrete repair. Contractor is not required to propose an offer for all line items. Contractor may offer only those line items for which the contractor has expertise, equipment, and materials.

Project Location

The project areas are located on the Coronado National Forest, in Southeastern Arizona.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F

AGAR 452.211-74 Period of Performance (FEB 1988)

The period of performance of this contract is from date of award through one (1) year.

AGAR 452.211-75 Effective Period of the Contract (FEB 1988) The effective period of this contract is from ______ through ______.

SECTION F--DELIVERIES OR PERFORMANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

FAR 52.242-14

Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within __10__ calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _number of calendar days stated in each task order. The time stated for completion shall include final cleanup of the premises.

AGAR 452.236-75 Maximum Workweek – Construction Schedule (NOV 1996) Within _5_ calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is Monday through Friday, daylight hours, unless authorized in writing by Contracting Officer.

SECTION G--CONTRACT ADMINISTRATION DATA

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

Item
Description
Where, When, How
1.1 Project Maps
Exhibit 2 - Vicinity Map and Drawings
Provided in Section J.
1.2 Access Roads
The Government will allow access to the National Forest roads shown on the vicinity map.
Provided in Section J.

G.2.0. INVOICES, PAYMENTS, AND ACCRUALS

All payments for services rendered shall be made by proper invoice. The successful offeror will be provided FS-6300-30, Contract Payment Estimate and Invoice, form at the Pre-Work Conference prior to issuance of any task orders. The Government may introduce total electronic invoicing at some point during the life of contracts awarded from this RFP. Total electronic invoicing will allow contractors to submit an invoice on-line (via internet) or by fax or mail to a designated third party agent or vendor that will verify the accuracy of the invoice and either accept or reject the submitted invoice on a timely basis.

It is the Contractor’s responsibility to submit a proper invoice as required in FAR 52.232-25(3). At a minimum, a proper invoice shall contain the following:

· Contractor name and address that matches CCR database

· Invoice date and Invoice number (unique for each submission)

· Contract Number and Task Order Number

· Line item descriptions that match the Contract Line Item Number (CLIN), reference the CLIN

· Name and address of Contractor’s official to whom payment shall be sent (from awarded contract)

· Name, address, phone number, and mailing address of Contractor’s representative to be notified in event of defective invoice

· Any other terms and conditions required by contract for proper invoice

G.3.0. CONTRACTOR REGISTRATION PROCESS ------- DUNS/CCR/ORCA ---------- REQUIRED:

All vendors who wish to do business with the Department of Agriculture (USDA) Forest Service must first be registered in the Central Contractor Registration (CCR) database and complete the Online Representations and Certifications Application (ORCA).

· All vendors, including individuals, are required to obtain a Data Universal Numbering System (DUNS) Number, a unique, nine-character identification number provided by Dun & Bradstreet (D&B). If you do not already have a DUNS number, call D&B at 1-866-705-5711 to obtain your free number. The process takes about 10 minutes and is free of charge. You can view instructions for obtaining your DUNS number at www.ccr.gov/pdfs/DUNSGuideGovVendors.pdf . You must have a DUNS number to register in CCR.

· Using your DUNS number, register with the Central Contractor Registration (CCR) database. Go to their website at www.ccr.gov (preferred method) or call the CCR Assistance Center at 1-888-227-2423 to obtain a hard copy registration form. Also call the CCR Assistance Center if you need help while navigating the website. YOU MUST HAVE AN ACTIVE REGISTRATION TO BE AWARDED A PROCUREMENT ACTION. You must update your registration whenever you change phone numbers, address, banking information, etc. or at least annually to keep it active.

· Once you register, the CCR administrators will mail you a Trading Partner Identification Number (TPIN). You must have your DUNS number and TPIN to update your registration. Keep these in a safe place where you can find them. If you misplace or forget your TPIN, go to www.ccr.gov , click on Register in CCR, click Update/Renew, click CCR Update TPIN. In the large green box at the top of the screen you will see “Don’t know your TPIN? Click here for TPIN letter request.” A new TPIN will be mailed to you at the address you used in CCR. Do NOT give anyone your TPIN or MPIN numbers.

· Make sure you use the same federal Taxpayer Identification (TIN) in CCR that you use to do business with the government. This may be a social security number for individuals or sole proprietors and an Employer Identification Number for others. It must be the same TIN you use to pay taxes for your business to IRS.

· For vendors responding to a solicitation, a Blanket Purchase Agreement (BPA) or an Emergency Equipment Rental Agreement (EERA) the Federal Acquisition Regulation requires the use of the Online Representations and Certifications Application (ORCA) as part of the proposal submission process. To register in ORCA you must have two items: an active CCR record and a Marketing Personal Identification Number (MPIN) identified in your CCR record. Your DUNS number and MPIN act as your company’s ID and password into ORCA. To enter your information via the Internet go to https://orca.bpn.gov .

· Provide your TIN number and DUNS number to the contracting office with whom you are doing business. The office will go on line to verify your active registration in CCR and ORCA. If you have not completed BOTH registrations, you may be excluded from consideration for an award or agreement.

· NOTE: If you make any changes to your address, phone or bank account information in CCR, be sure to notify any federal offices with whom you do business so they can have your finance record updated. If your finance record is not updated, payments will continue to be routed to your old bank account.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1.0. FAR 52.236-4 Physical Data (APR 1984) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by: none.

(b) Weather conditions See Fire Plan.

(c) Transportation facilities none.

Utility Services : None.

Utility Services There are no utilities available for use at project locations.

FIRE PLAN

The contractor shall be responsible for the cost of suppressing all fires caused by his operation, and for all damage to any property of the USDA Forest Service or third parties. The USDA Forest Service reserves the right to participate in extinguishing any fires caused by the contractor's operations and the contractor shall reimburse the USDA Forest Service for the cost of all suppression activities ordered or directed by the USDA Forest Service. The following requirements are a part of this solicitation and any resultant contract.

A. Fire Prevention

During periods of contract performance, fire requirements shall be met by the contractor.

B. Execution of Fire Plan

1. Forest Service personnel involved will, in all cases, coordinate through the Contracting Officer's Representative (COR), except in cases of emergency or Forest closure.

2. The contractor shall designate a fire plan representative who shall be responsible for executing and carrying out the fire requirements.

3. The contractor shall include the fire requirements in all subcontracts.

4. The contractor shall assure that all contract employees are informed of the existence and conditions of the fire requirements.

C. Compliance Inspection

1. Inspection by the Forest Service will be made to insure compliance with the fire requirements.

2 Should any deficiencies appear during the inspection, the contractor will be informed and the deficiencies shall be corrected within 24 hours. Activities with the potential to start fires shall be halted until the deficiencies are corrected and the corrections approved by the COR.

3. The contractor's fire plan representative shall make daily inspections to insure that the terms of the fire requirements are met at all times.

D. Fire Presuppression Requirements

1. Fire Toolbox

a. During contract performance, the contractor shall furnish and maintain, at the contractor's expense, one fire Tool box at the campsite or some central location, as long as it is within 1/4 mile of the location where the contractor is currently performing work.

D. Fire Presuppression Requirements (continued)

b. The fire tool box is to be maintained with tools in good condition in the following quantities for each five people in the contractor's work force. The equipment is for the sole purpose of firefighting. Four shovels, two axes, one pulaski and five each 1-gallon canteens. Where needed, brushhooks and McLeod tools may be substituted for shovels or axes.

c. The fire tool box shall be replenished by the contractor after each incidence of fire use.

2. Work Hours

a. The contractor shall restrict operations in accordance with the following emergency fire precaution schedule unless the COR waives the requirement in writing.

b. Each day of operation when there is a predicted change in the fire precaution plan, the Forest Service will inform the contractor between 3:00 and 6:00 p.m. MST (4:00 and 7:00 p.m. MDT). Notification will be made of the alphabetical industrial fire precaution plan (Exhibit 1) to be followed the next day within the local operating area.

c. No later than 9:00 a.m. MST (10:00 a.m. MDT) the following day, the Forest Service will inform the contractor of any change in the fire precaution schedule.

3. Blasting

Use of caps and safety fuse detonators for blasting is not permitted during periods when fire precaution plan C or D is in effect. A fire guard shall be required in accordance with the enclosed emergency fire precaution schedule. This individual, when required, shall remain on duty for at least 1 hour after blasting is finished. Minimum equipment shall consist of a round-pointed, size 0 or larger shovel and a 3- to 5-gallon backpack pump filled with water. Blasting hours are restricted under fire precaution plan C, and blasting is prohibited under fire precaution plan D.

4. Welding

An area commensurate with the amount of welding to be accomplished shall be cleared before welding operations are started. Written permission must be obtained from the COR during fire precaution plan B, C and D. As a minimum, a 3- to 5-gallon backpack pump filled with water is to be available in addition to the vehicle fire extinguisher. The area in the immediate vicinity of the operation shall be wet down before and after operations. The area adjacent to the welding operations shall be thoroughly checked for fires for one hour after welding.

5. Fire Guard

The contractor shall designate at least one representative to train and supervise each work crew in fire prevention, detection, and suppression.

To prevent, detect, and suppress fires, the contractor shall provide a trained fire guard for projects involving internal combustion engines. The fire guard shall perform guard duties during operating hours. The fire guard may perform contract work in conjunction with fire guard duties.

Each fire guard shall report all fires and take suppression action on any fire that starts on the project area. Each fire guard shall be equipped with a vehicle and a fire tool cache consisting of a fire cache box, two size 0 shovels, two pulaskis, two McLeod tools, and two 4- to 5-gallon backpack pumps filled with water. All equipment and tools shall be maintained in serviceable condition.

E. Fire Suppression

1. The contractor shall take independent action on the suppression of all fires in the work area or vicinity. Vicinity is defined as a 1/4 mile extension from the operations area boundary.

2. All Forest fires shall be reported to the District Ranger's Office as soon as possible. Even though the fire has been suppressed by the contractor's crew, this report is required. The office and telephone number to which fires shall be reported will be furnished to the contractor prior to start of contract work.

F. Equipment Requirements

1. All gasoline and diesel equipment (except turbocharged) used on the project shall be equipped with spark arresters approved in the Spark Arrester Guide, USDA Forest Service, June 1983.

2. All internal combustion engines must be inspected before use on the job and periodically thereafter by the Forest Service. Equipment not passing inspection cannot be used until repairs are made.

3. Serviceable baffled mufflers with standard exhaust tailpipes are considered adequate on trucks, pickups, and sedans.

4. Equipment service areas and gas and oil storage areas shall be cleared of brush, litter, debris, and grass for a radius of at least 50 feet.

5. Each piece of motorized equipment not included in Item d below shall be equipped with a round-pointed shovel and fire extinguisher.

6. Fuel trucks, service trucks, and the work camp shall be equipped with a shovel, DB axe, and class ABC pressurized chemical fire extinguisher of not less than 15 pounds capacity by weight.

The shovels and fire extinguishers are in addition to those required for the tool box (4. a.). These shall be furnished and maintained at the contractor's expense.

7. All crawler tractors and rubber-tired equipment suitable for fire suppression work shall be prepared for nighttime use by mounting of brackets for portable, self-contained, battery-operated lights, provided by the F saws shall be kept in a safe, serviceable condition at all times. Each power saw shall be equipped with an approved spark arrester/muffler system meeting the SAE J-335b standard

a. The refueling of power saws shall be done on mineral soil and the saw shall be moved at least 10 feet from the point of refueling to another barren spot before being started.

8. Power saws shall be kept in a safe, serviceable condition at all times. Each power saw shall be equipped with an approved spark arrester/muffler system meeting the SAE J-335b standard.

b. Powersaws with warm or hot spark arresters/mufflers (running or not) shall not be placed or rested on sawdust piles, litter duff, stumps or spots that are easily ignited.

c. Each powersaw shall be accompanied by one round pointed shovel in good condition and a metal fuel-safety can. One chemical pressurized fire extinguisher, 8 ounces or larger, is to be kept with the powersaw operator at all times while working on the project. The shovel is to be kept with the fuel supply.

G. Smoking and Fires

1. Smoking

a. No smoking shall be allowed while traveling, except on surfaced highways. A surfaced highway is any road that is oiled, graveled or otherwise paved.

b. Smoking is not permitted while working. Smoking is only permitted on breaks in areas having a clearing of at least three feet in diameter to bare soil.

2. Fires

a. No warming, burning of debris, or cooking fires shall be permitted during periods of high or above fire danger except in designated places or by written permission.

H. Violations

1. Violations of the smoking regulations (36 CFR 261.52(a)(c)(d)) and fire requirement will result in criminal action against the violator. The contractor shall advise all employees of this regulation.

b. Violation or deficiencies of fire requirements shall result in immediate suspension of operations until the deficiency or violation is corrected. Repetitive violations will be grounds for default termination.

I. Historical Data

The following data on the Forest area involved is to be provided for the contractor's information. The data will be based on records for the past 10 years.

Total fire season: May 1 to September 30

Average number of days of Plan A: 119

Average number of days of Plan B: 15

Average number of days of Plan C: 6

Average number of days of Plan D: 14

EXHIBIT 1

EMERGENCY FIRE PRECAUTION SCHEDULE

Predicted Manning Class for the Industrial Fire Precaution Plan

Fire Danger Rating Area

3B

4C

5D

Area closure proclaimed by the Forest Supervisor or Regional Forester

Fire Precaution Plan Description

A. Normal fire precautions. No fire guard required.

B. Designated areas for smoking, warming, and cooking fires require a written permit. Contractor shall provide fire guard unless relieved of this responsibility in writing by the COR.

C. Shutdown from 12:00 noon until 8:00 p.m. MST (1:00 - 9:00 p.m. MDT) of all machine treatment of slash, blasting, welding, metal cutting, and clearing. No smoking, warming, or cooking fires permitted at any time. Powersaws shall be shut down from 9:00 a.m. until 8:00 p.m. MST (10:00 a.m. to 9:00 p.m. MDT). Operations on mineral soil involving road excavation, watering, grading, surfacing, rock crushing and/or other equipment maintenance may continue.

D. Shutdown all operations, except operations on mineral soil involving road excavation, watering, grading, gravel surfacing and rock crushing may continue with a special Forest Service permit.

PART II--CONTRACT CLAUSES

SECTION I

52.217-2 Cancellation Under Multiyear Contracts (OCT 1997) 52.222-30 Davis-Bacon Act—Price Adjustment (None or Separately Specified Method) (DEC 2001)

52.222-32 Davis-Bacon Act—Price Adjustment (Actual Method) (DEC 2001)

52.222-43 Fair Labor Standards Act and Service Contract Act--Price Adjustment (Multiple Year and Option Contracts) (NOV 2006)

52.252-2 Clauses Incorporated by Reference (FEB 1998)

Full Text:

FAR 52.216-18 Ordering (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from __________ through ____________ [insert dates].

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

FAR 52.216-19 Order Limitations (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $500, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor--

(1) Any order for a single item in excess of $1M;

(2) Any order for a combination of items in excess of $1M; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within _____ days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

FAR 52.216-22 Indefinite Quantity (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 10/31/2012.

FAR 52.217-8 Option to Extend Services (NOV 1999) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days 09/30/2012.

FAR 52.217-9 Option to Extend the Term of the Contract (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed ___________ (months)(years).

FAR 52.222-31 Davis-Bacon Act Price Adjust (Percentage Method) (DEC 2001)

(a) The wage determination issued under the Davis-Bacon Act by the Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.

(b) The Contracting Officer will adjust the portion of the contract price or contract unit price(s) containing the labor costs subject to the Davis-Bacon Act to provide for an increase in wages and fringe benefits at the exercise of each option to extend the term of the contract in accordance with the following procedures:

(1) The Contracting Officer has determined that the portion of the contract price or contract unit price(s) containing labor costs subject to the Davis-Bacon Act is ______________(Contracting Officer insert percentage rate) percent.

(2) The Contracting Officer will increase the portion of the contract price or contract unit price(s) containing the labor costs subject to the Davis-Bacon Act by percentage rate published in ____________(Contracting Officer insert publication).

(c) The Contracting Officer will make the price adjustment at the exercise of each option to extend the term of the contract. This adjustment is the only adjustment that the Contracting Officer will make to cover any increases in wages and benefits as a result of-

(1) Incorporation of the Department of Labor’s wage determination applicable at the exercise of the option to extend the term of the contract;

(2) Incorporation of a wage determination otherwise applied to the contract by operation of law; or

(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the Davis-Bacon Act.

52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING PAYMENT OF UNION DUES OR FEES (DEC 2004)

(a) Definition. As used in this clause-

"United States" means the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.

(b) Except as provided in paragraph (e) of this clause, during the term of this contract, the Contractor shall post a notice, in the form of a poster, informing employees of their rights concerning union membership and payment of union dues…