Davis_Bacon_Wages_Hwy_SantaCruzCo.doc

DOC document 35 KB Posted

Attached to
Forestwide Roads IDIQ 2009, Coronado National Forest
Solicitation number
AG-8197-S-09-0012
Issued by

About this file

Davis-Bacon Wage Rates Santa Cruz County, AZ

View the file

Other files

File Type Posted
Combined Award Information List.xls XLS spreadsheet
sf-30_Amend_#2_IDIQ_Roads.rtf RTF text file
Amendment2_Economic_Fuel_Price_Adj.doc DOC document
RFP_Coronado_Amendment1.doc DOC document
sf-30_Amend_#1_IDIQ_Roads.rtf RTF text file
Amendment1_Pre_Bid_Meeting_Notes.doc DOC document
Sheet2-B_Roadsaver_silicon_sealant-Apply.pdf PDF
Sheet6-Concrete-Repair-Dwg.pdf PDF
Hot_Tar_Sealant.pdf PDF
Davis_Bacon_Wages_Hwy_PimaCo.doc DOC document
Sheet9-gate-fabrication.pdf PDF
Sheet8-gate_30ft_fabrication.pdf PDF
Sheet3-C_polyflex_type2-Product.pdf PDF
Sheet7-gate_16ft_fabrication.pdf PDF
CNF_Map.pdf PDF
Sheet1-A_roadsaver_silicone_Product.pdf PDF
Sheet4-D_polyflex-Type2-Apply.pdf PDF
RFP_Coronado.doc DOC document
Sheet5-Concrete-New-Details.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL DECISION: AZ20080003 02/13/2009 AZ3

Date: February 13, 2009

General Decision Number: AZ20080003 02/13/2009

Superseded General Decision Number: AZ20070003

State: Arizona

Construction Type: Highway

Counties: Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo, Santa Cruz and Yavapai Counties in Arizona.

HIGHWAY CONSTRUCTION PROJETS

Modification Number Publication Date

0 02/08/2008

1 06/20/2008

2 08/08/2008

3 08/22/2008

4 02/13/2009

* CARP0408-006 09/01/2007

Rates Fringes

CARPENTER........................$ 22.50 5.97

ENGI0428-012 06/15/2008

Rates Fringes

Power Equipment Operator

(2) Loader 3 to 6 cu yd;

Motor Grader (Rough)........$ 23.16 8.84

(3) Loader 6 to 10 cu yd;

Motor Grader (Finish);

Paving Machine..............$ 24.24 8.84

(4) Loader 10 cu yd and over........................$ 25.27 8.84

IRON0075-006 08/01/2008

Rates Fringes

Ironworker, Rebar

Zone 1......................$ 25.52 16.39

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson

Zone 2: 050 to 100 miles - Add $4.00

Zone 3: 100 to 150 miles - Add $5.00

Zone 4: 150 miles & over - Add $6.50

LABO0383-007 06/01/2007

Rates Fringes

Laborers

(2) Concrete Laborer........$ 15.64 4.55

(4) Asphalt Raker and

Ironer......................$ 17.28 4.55

SUAZ2004-004 03/04/2004

Rates Fringes

Cement Mason/Finisher............$ 15.90 0.00

Laborers

Flagger.....................$ 9.49 0.00

General/Cleanup.............$ 11.59 2.06

Power Equipment Operator

Backhoe.....................$ 17.20 2.44

Crane.......................$ 23.29 0.00

Driller.....................$ 23.29 0.00

Gradall.....................$ 13.00 0.00

Pilot Car...................$ 13.54 0.41

Roller......................$ 18.64 3.97

Screedman...................$ 22.89 3.85

TEAM0104-007 06/01/2007

Rates Fringes

TRUCK DRIVER

(2) 2 or 3 axle Dump;

Water Truck under 2500 gallons.....................$ 17.18 3.40+a

(3) 4 axle Dump.............$ 17.58 3.40+a

(4) 5 axle Dump; Water

Truck 2500 to 3900 gallons..$ 18.20 3.40+a

(5) 6 axle Dump; Water

Truck 3900 gallons & over...$ 18.44 3.40+a

(6) 7 axle Dump............$ 19.02 3.40+a

FOOTNOTE:

a. Health & Welfare $586.36 per month.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION