SHEET TOTAL
B2 NO. SHEETS
ERFO NF 2011(1)
Various Sites
15101-0000 LPSM ALL ALL
15215-3000 EACH 2 2 2
15301-0000 LPSM ALL ALL
15401-0000 LPSM ALL ALL
15501-0000 LPSM ALL ALL
15705-1400 LNFT 490 490 500
20301-1900 EACH 1 1 1
25102-2000 TON 16 16 20
25306-1000 EACH 1 1 1
30301-6000 STA 289 289 300
30802-1000 TON 7,527 7,527 8,000
60201-0800 LNFT 22 22 25
60210-0800 EACH 2 2 2
60704-0000 EACH 1 1 1
63502-0600 EACH 4 4 4
63504-1000 SQFT 20 20 20
15101-0000 LPSM ALL ALL
15215-3000 EACH 1 1 1
15301-0000 LPSM ALL ALL
15401-0000 LPSM ALL ALL
15501-0000 LPSM ALL ALL
15705-1400 LNFT 60 60 75
25102-2000 TON 36 36 38
25306-1000 EACH 1 1 1
30301-6000 STA 11 11 13
30802-1000 TON 261 261 300
63502-0600 EACH 2 2 2
63504-1000 SQFT 10 10 10
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT LOG
PLACED RIPRAP, CLASS 2
REVETMENT MAT, ARTICULATED CONCRETE BLOCK
ROADWAY RECONDITIONING
FR 372 MCDANIEL
3/ 1/
2:
P M
The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted or for materials furnished according to the contract.
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
FR 3213 WOLF MOUNTAIN
ROADWAY AGGREGATE, METHOD 1
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
MOBILIZATION
SURVEY AND STAKING, DRAINAGE STRUCTURE
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
SUMMARY OF QUANTITIES
REG STATE
B1
PROJECT
REMARKS AND/OR DETERMINATION OF
ESTIMATED QUANTITY
R9 MO
B2ITEM NO. ITEM DESCRIPTION UNIT
Miscellaneous Summaries
END SECTION FOR 24-INCH PIPE CULVERT
CLEANING CULVERTS IN PLACE
N
EF
L\
ER
FO
\R oa dw ay
\C A D
D _S he et s\ M
O E
R
FO
N F
(1
B -S um m
M
O E
R
FO
N F
(1
S um m ar y of
Q ua nt iti es .x ls ]S um En gl is h
ESTIMATED
QUANTITIES
PLAN BID
Sheet Number and Description
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SEDIMENT LOG
REMOVAL OF PIPE CULVERTS
PLACED RIPRAP, CLASS 2
REVETMENT MAT, ARTICULATED CONCRETE BLOCK
ROADWAY RECONDITIONING
ROADWAY AGGREGATE, METHOD 1
24-INCH PIPE CULVERT
| MO ERFO MTNF 2011(1) 100% Plan Title Sheet signed 3-1-13 |
| MO ERFO MTNF 2011(1) 100%PS |
| A1-Untitled |
| A2-Untitled |
| A3-Untitled |
| A4-Untitled |
| A5-Untitled |
| B1_MO ERFO NF 2011(1) Summary of Quantities |
| B2_MISC_SUMMARY-US_Sur_ft2D-000 |
| E1_SPL157-A-US_Sur_ft2D-000 |
| G1_C251-50-US Customary-000 |
| G2_DE253A-US_Sur_ft2D-000 |
| G3_SP253-US_Sur_ft2D-000 |
| T1_st60201-US Customary-000 |
| T2_st60202-US Customary-000 |
| T3_st60203-US Customary-000 |
| T4_st60204-US Customary-000 |
| T5_TTC-US_Sur_ft2D-000 |
| T6_sp63501-USC-000 |
File details come from the government source that posted it. Updated .