AG-64R4-S-14-0010_-_Wolf_Mountain_and_McDaniel_Road_Reconditioning_-_Plans_and_Drawings.pdf

PDF 5 MB Posted

Attached to
MCDANIEL AND WOLF MOUNTAIN ROAD RECONDITIONGING - MARK TWAIN NATIONAL FOREST
Solicitation number
AG-64R4-S-14-0010
Issued by

About this file

Plans and Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TOTAL

B2 NO. SHEETS

ERFO NF 2011(1)

Various Sites

15101-0000 LPSM ALL ALL

15215-3000 EACH 2 2 2

15301-0000 LPSM ALL ALL

15401-0000 LPSM ALL ALL

15501-0000 LPSM ALL ALL

15705-1400 LNFT 490 490 500

20301-1900 EACH 1 1 1

25102-2000 TON 16 16 20

25306-1000 EACH 1 1 1

30301-6000 STA 289 289 300

30802-1000 TON 7,527 7,527 8,000

60201-0800 LNFT 22 22 25

60210-0800 EACH 2 2 2

60704-0000 EACH 1 1 1

63502-0600 EACH 4 4 4

63504-1000 SQFT 20 20 20

15101-0000 LPSM ALL ALL

15215-3000 EACH 1 1 1

15301-0000 LPSM ALL ALL

15401-0000 LPSM ALL ALL

15501-0000 LPSM ALL ALL

15705-1400 LNFT 60 60 75

25102-2000 TON 36 36 38

25306-1000 EACH 1 1 1

30301-6000 STA 11 11 13

30802-1000 TON 261 261 300

63502-0600 EACH 2 2 2

63504-1000 SQFT 10 10 10

MOBILIZATION

SURVEY AND STAKING, DRAINAGE STRUCTURE

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SEDIMENT LOG

PLACED RIPRAP, CLASS 2

REVETMENT MAT, ARTICULATED CONCRETE BLOCK

ROADWAY RECONDITIONING

FR 372 MCDANIEL

3/ 1/

2:

P M

The following quantities are approximate unless noted as a contract quantity. Payment will be made for the actual quantities of work performed and accepted or for materials furnished according to the contract.

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

FR 3213 WOLF MOUNTAIN

ROADWAY AGGREGATE, METHOD 1

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

MOBILIZATION

SURVEY AND STAKING, DRAINAGE STRUCTURE

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

SUMMARY OF QUANTITIES

REG STATE

B1

PROJECT

REMARKS AND/OR DETERMINATION OF

ESTIMATED QUANTITY

R9 MO

B2ITEM NO. ITEM DESCRIPTION UNIT

Miscellaneous Summaries

END SECTION FOR 24-INCH PIPE CULVERT

CLEANING CULVERTS IN PLACE

N

EF

L\

ER

FO

\R oa dw ay

\C A D

D _S he et s\ M

O E

R

FO

N F

(1

B -S um m

M

O E

R

FO

N F

(1

S um m ar y of

Q ua nt iti es .x ls ]S um En gl is h

ESTIMATED

QUANTITIES

PLAN BID

Sheet Number and Description

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SEDIMENT LOG

REMOVAL OF PIPE CULVERTS

PLACED RIPRAP, CLASS 2

REVETMENT MAT, ARTICULATED CONCRETE BLOCK

ROADWAY RECONDITIONING

ROADWAY AGGREGATE, METHOD 1

24-INCH PIPE CULVERT

MO ERFO MTNF 2011(1) 100% Plan Title Sheet signed 3-1-13
MO ERFO MTNF 2011(1) 100%PS
A1-Untitled
A2-Untitled
A3-Untitled
A4-Untitled
A5-Untitled
B1_MO ERFO NF 2011(1) Summary of Quantities
B2_MISC_SUMMARY-US_Sur_ft2D-000
E1_SPL157-A-US_Sur_ft2D-000
G1_C251-50-US Customary-000
G2_DE253A-US_Sur_ft2D-000
G3_SP253-US_Sur_ft2D-000
T1_st60201-US Customary-000
T2_st60202-US Customary-000
T3_st60203-US Customary-000
T4_st60204-US Customary-000
T5_TTC-US_Sur_ft2D-000
T6_sp63501-USC-000

File details come from the government source that posted it. Updated .