SOLICITATION NO. AG-64R4-S-14-0010 AMENDMENT NO. 0002 dated 06/23/2014
ROAD RECONDITIONING - MARK TWAIN NATIONAL FOREST
| AMENDMENT OF SOLICITATION |
| 1. CONTRACT ID CODE: 64R4 |
| PAGE 1 OF 3 PAGE(S) |
2. AMENDMENT NO.
3. EFFECTIVE DATE
06/23/2014
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
6. ISSUED BY:
USDA, Forest Service, Mark Twain National Forest Attn: Anita Young, Acquisition Management 401 Fairgrounds Road Rolla, MO 65401
7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
XX
9A. AMENDMENT OF SOLICITATION NO.
AG-64R4-S-14-0010 –ROAD RECONDITIONING – MARK TWAIN NATIONAL FOREST
9B. DATED (SEE ITEM 11): 05/12/2014
10A. MODIFICATION OF CONTRACT/ORDER
FACILITY CODE:
10B. DATED (SEE ITEM 13):
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[XX]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ XX] is extended, [] is not extended. Offerors are required to acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) n/a
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor []is not, [XX] is required to sign this document and return _1_copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above-numbered solicitation is amended as follows:
REPLACE Pages 2 and 3 of Part I, Section B with the REVISED Pages 2 and 3. For clarification, the “UNIT” on Item 1, Line Item 60704-0000 and Item 2, Line Item 25306-1000 is intended as a LUMP SUM measurement
THE DATE AND TIME SET FOR RECEIPT OF BIDS IS EXTENDED TO JUNE 27, 2014, 2:00 P.M. (LOCAL TIME AT PLACE OF OPENING).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Anita J. Young, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
BY
( Signature of Contracting Officer)
16C. DATE SIGNED
PART I – THE SCHEDULE (REVISED 06/23/2014)
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
The contractor shall furnish all transportation, material, labor, equipment, operators, tools, supplies, licenses, permits and other incidentals necessary for road reconstruction on the Mark Twain National Forest. All work shall be performed in accordance with terms, conditions, specifications and drawings of this Invitation for Bids (IFB) and any resultant contract.
B-1 SCHEDULE OF ITEMS
ITEM 1 – FOREST ROAD 3213 – WOLF MOUNTAIN
ELEVEN POINT RANGER DISTRICT, RIPLEY COUNTY, MISSOURI
| Line Item |
| Title |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
15101-
| Mobilization1 |
| 1 |
| Lump Sum |
| XXXXXXXXXX |
| $ |
15215-
| Survey and Staking, Drainage Structure |
| 2 |
| Each |
| $ |
| $ |
15705-
| Soil Erosion Control, Sediment Log |
| 490 |
| LNFT |
| $ |
| $ |
20301-
| Removal of Pipe Culverts |
| 1 |
| Each |
| $ |
| $ |
25102-
| Placed Riprap, Class 2 |
| 16 |
| Ton |
| $ |
| $ |
**ALT 1: 25306-
| Revetment Mat, Articulated Concrete Block - |
| 1 |
| Each |
| $ |
| $ |
**ALT 2:
25306-1000
| Articulating concrete mat, 150’x16’ with barrier, CC45 or equivalent |
| 1 |
| Lump |
Sum
| $ |
| $ |
30301-
| Roadway Reconditioning |
| 289 |
| Sta |
| $ |
| $ |
| 30802-1000 |
| Roadway Aggregate, Method 1 |
| 7,527 |
| Ton |
| $ |
| $ |
60201-
| 24-inch Pipe Culvert |
| 22 |
| LNFT |
| $ |
| $ |
60210-
| End Section for 24-inch Pipe Culvert |
| 2 |
| Each |
| $ |
| $ |
| 60704-0000 |
| Cleaning Culverts in Place |
| 1 |
| Lump |
Sum
| $ |
| $ |
TOTAL PRICE FOR ITEM 1 – FR 3213 – WOLF MOUNTAIN
ITEM 2 – FOREST ROAD 372 – McDANIEL
HOUSTON RANGER DISTRICT, PULASKI COUNTY, MISSOURI
| Line Item |
| Title |
| Quantity |
| Unit |
| Unit Price |
| Total Price |
15101-
| Mobilization1 |
| 1 |
| Lump Sum |
| XXXXXXXXXX |
| $ |
15215-
| Survey and Staking, Drainage Structure |
| 1 |
| Each |
| $ |
| $ |
15705-
| Soil Erosion Control, Sediment Log |
| 60 |
| LNFT |
| $ |
| $ |
25102-
| Placed Riprap, Class 2 |
| 36 |
| Ton |
| $ |
| $ |
**ALT 1: 25306-
| Revetment Mat, Articulated Concrete Block - |
| 1 |
| Each |
| $ |
| $ |
**ALT 2:
25306-1000
| Articulating concrete mat, 40’x16’ with barrier, CC45 or equivalent |
| 1 |
| Lump |
Sum
| $ |
| $ |
25306-
| Revetment Mat, Articulated Concrete Block |
| 1 |
| Lump |
Sum
| $ |
| $ |
30301-
| Roadway Reconditioning |
| 11 |
| Sta |
| $ |
| $ |
| 30802-1000 |
| Roadway Aggregate, Method 1 |
| 261 |
| Ton |
| $ |
| $ |
TOTAL PRICE FOR ITEM 2 – FR 372 – McDANIEL
**An alternate item has been provided for Item No. 25306-1000. Bidders should provide a bid for the alternative they plan to provide. Only one line of Pay Item No. 25306-1000 will be awarded per bid item.
B-2 CONSTRUCTION NOTES:
Reimbursement for bond premiums, in accordance with FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include payment for bond premiums under Pay Item 15101-0000 - Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
The following items of work are considered incidental to the contract and will not be paid for separately: contractor quality control; contractor testing; construction schedule; temporary traffic control barricades and signing.
B-3 PRE-BID MEETING AND TOUR:
A pre-bid meeting and tour will be held on May 27, 2014 at 10:00 a.m. at the project site for Item 1 – FR 3213 Wolf Mountain Road and on May 28, 2014 at 10:00 a.m. at the project site for Item 2 – FR 372 McDaniel Road. Interested bidders are encouraged to attend these meetings. For more information, contact Jeremy Brown at 573-785-1475 for Item 1 and Shawn Bleiler at 573-729-6656 for Item 2.
B-4 SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:
In order to be eligible for an award, potential contractors must comply with all requirements of FAR Clause 52.204-7--System for Award Management. Bidders may register in SAM at www.sam.gov. There is no charge to register when registration is done at the official SAM website shown here.
File details come from the government source that posted it. Updated .