AG-64R4-S-10-0010_-_Amendment_No._0002.docx

DOCX document 36 KB Posted

Attached to
MCDANIEL AND WOLF MOUNTAIN ROAD RECONDITIONGING - MARK TWAIN NATIONAL FOREST
Solicitation number
AG-64R4-S-14-0010
Issued by

About this file

Amendment No. 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. AG-64R4-S-14-0010 AMENDMENT NO. 0002 dated 06/23/2014

ROAD RECONDITIONING - MARK TWAIN NATIONAL FOREST

AMENDMENT OF SOLICITATION
1. CONTRACT ID CODE: 64R4
PAGE 1 OF 3 PAGE(S)

2. AMENDMENT NO.

3. EFFECTIVE DATE

06/23/2014

4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)

6. ISSUED BY:

USDA, Forest Service, Mark Twain National Forest Attn: Anita Young, Acquisition Management 401 Fairgrounds Road Rolla, MO 65401

7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

XX

9A. AMENDMENT OF SOLICITATION NO.

AG-64R4-S-14-0010 –ROAD RECONDITIONING – MARK TWAIN NATIONAL FOREST

9B. DATED (SEE ITEM 11): 05/12/2014

10A. MODIFICATION OF CONTRACT/ORDER

FACILITY CODE:

10B. DATED (SEE ITEM 13):

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[XX]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ XX] is extended, [] is not extended. Offerors are required to acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) n/a

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor []is not, [XX] is required to sign this document and return _1_copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The above-numbered solicitation is amended as follows:

REPLACE Pages 2 and 3 of Part I, Section B with the REVISED Pages 2 and 3. For clarification, the “UNIT” on Item 1, Line Item 60704-0000 and Item 2, Line Item 25306-1000 is intended as a LUMP SUM measurement

THE DATE AND TIME SET FOR RECEIPT OF BIDS IS EXTENDED TO JUNE 27, 2014, 2:00 P.M. (LOCAL TIME AT PLACE OF OPENING).

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Anita J. Young, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B. UNITED STATES OF AMERICA

BY

( Signature of Contracting Officer)

16C. DATE SIGNED

PART I – THE SCHEDULE (REVISED 06/23/2014)

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

The contractor shall furnish all transportation, material, labor, equipment, operators, tools, supplies, licenses, permits and other incidentals necessary for road reconstruction on the Mark Twain National Forest. All work shall be performed in accordance with terms, conditions, specifications and drawings of this Invitation for Bids (IFB) and any resultant contract.

B-1 SCHEDULE OF ITEMS

ITEM 1 – FOREST ROAD 3213 – WOLF MOUNTAIN

ELEVEN POINT RANGER DISTRICT, RIPLEY COUNTY, MISSOURI

Line Item
Title
Quantity
Unit
Unit Price
Total Price

15101-

Mobilization1
1
Lump Sum
XXXXXXXXXX
$

15215-

Survey and Staking, Drainage Structure
2
Each
$
$

15705-

Soil Erosion Control, Sediment Log
490
LNFT
$
$

20301-

Removal of Pipe Culverts
1
Each
$
$

25102-

Placed Riprap, Class 2
16
Ton
$
$

**ALT 1: 25306-

Revetment Mat, Articulated Concrete Block -
1
Each
$
$

**ALT 2:

25306-1000

Articulating concrete mat, 150’x16’ with barrier, CC45 or equivalent
1
Lump

Sum

$
$

30301-

Roadway Reconditioning
289
Sta
$
$
30802-1000
Roadway Aggregate, Method 1
7,527
Ton
$
$

60201-

24-inch Pipe Culvert
22
LNFT
$
$

60210-

End Section for 24-inch Pipe Culvert
2
Each
$
$
60704-0000
Cleaning Culverts in Place
1
Lump

Sum

$
$

TOTAL PRICE FOR ITEM 1 – FR 3213 – WOLF MOUNTAIN

ITEM 2 – FOREST ROAD 372 – McDANIEL

HOUSTON RANGER DISTRICT, PULASKI COUNTY, MISSOURI

Line Item
Title
Quantity
Unit
Unit Price
Total Price

15101-

Mobilization1
1
Lump Sum
XXXXXXXXXX
$

15215-

Survey and Staking, Drainage Structure
1
Each
$
$

15705-

Soil Erosion Control, Sediment Log
60
LNFT
$
$

25102-

Placed Riprap, Class 2
36
Ton
$
$

**ALT 1: 25306-

Revetment Mat, Articulated Concrete Block -
1
Each
$
$

**ALT 2:

25306-1000

Articulating concrete mat, 40’x16’ with barrier, CC45 or equivalent
1
Lump

Sum

$
$

25306-

Revetment Mat, Articulated Concrete Block
1
Lump

Sum

$
$

30301-

Roadway Reconditioning
11
Sta
$
$
30802-1000
Roadway Aggregate, Method 1
261
Ton
$
$

TOTAL PRICE FOR ITEM 2 – FR 372 – McDANIEL

**An alternate item has been provided for Item No. 25306-1000. Bidders should provide a bid for the alternative they plan to provide. Only one line of Pay Item No. 25306-1000 will be awarded per bid item.

B-2 CONSTRUCTION NOTES:

Reimbursement for bond premiums, in accordance with FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include payment for bond premiums under Pay Item 15101-0000 - Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

The following items of work are considered incidental to the contract and will not be paid for separately: contractor quality control; contractor testing; construction schedule; temporary traffic control barricades and signing.

B-3 PRE-BID MEETING AND TOUR:

A pre-bid meeting and tour will be held on May 27, 2014 at 10:00 a.m. at the project site for Item 1 – FR 3213 Wolf Mountain Road and on May 28, 2014 at 10:00 a.m. at the project site for Item 2 – FR 372 McDaniel Road. Interested bidders are encouraged to attend these meetings. For more information, contact Jeremy Brown at 573-785-1475 for Item 1 and Shawn Bleiler at 573-729-6656 for Item 2.

B-4 SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:

In order to be eligible for an award, potential contractors must comply with all requirements of FAR Clause 52.204-7--System for Award Management. Bidders may register in SAM at www.sam.gov. There is no charge to register when registration is done at the official SAM website shown here.