AG-64R4-S-14-0010_-_Wolf_Mountain_and_McDaniel_Road_Reconditioning_-_Description_of_Work.docx

DOCX document 524 KB Posted

Attached to
MCDANIEL AND WOLF MOUNTAIN ROAD RECONDITIONGING - MARK TWAIN NATIONAL FOREST
Solicitation number
AG-64R4-S-14-0010
Issued by

About this file

Description of Work

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. AG-64R4-S-14-0010

ROAD RECONDITIONING – MARK TWAIN NATIONAL FOREST

DESCRIPTION OF WORK

ROAD RECONDITIONING

ITEM 1 – FOREST ROAD 3213

WOLF MOUNTAIN

ELEVEN POINT RANGER DISTRICT

RIPLEY COUNTY, MISSOURI

MARK TWAIN NATIONAL FOREST

Description of Work

FR 3213

MPDescription of Work
0.00Beginning at State Highway V begin road reconditioning reshape ditchline and establishingcrown in road prism.
Place 1” crushed base aggegrate 12’ width and 2” depth.
0.17Recondition drainage features according to plans.

0.21 Clean inlet and outlet of culvert.

0.29Replace corrugated metal pipe culvert with 24”x22’ culvert.
Remove old culvert off National Forest land.

0.45 Recondition drainage features according to plans.

0.47 Recondition drainage features according to plans.

0.49 Recondition drainage features according to plans.

0.54 Clean AA type outlet ditches left and right.

0.56 Clean AA type outlet ditches left and right.

0.59 Clean AA type outlet ditches left and right.

0.62 Clean AA type outlet ditches left and right.

0.78 Clean AA type outlet ditch right.

0.81 Clean AA type outlet ditches left and right.

0.86 Clean AA type outlet ditches left and right.

0.90 Clean AA type outlet ditch left.

0.94 Clean AA type outlet ditches left and right.

1.03 Clean BB type outlet ditches left and right.

1.08 Clean BB type outlet ditches left and right.

1.13 Clean BB type outlet ditches left and right.

FR 3213

MPDescription of Work
1.22Clean AA type outlet ditches left and right.

1.31 Clean AA type outlet ditches left and right.

1.40 FR 3286 right.

1.49Clean AA type outlet ditches left and right.
Road narrows; lessen ditch depth to stay within clearing.

1.56 FR 3149 left.

1.60 Clean BB type outlet ditches left and right.

1.78 Clean BB type outlet ditches left and right.

1.86 Clean BB type outlet ditches left and right.

2.00 Clean BB type outlet ditches left and right.

2.08 Clean BB type outlet ditches left and right.

2.22 Clean AA type outlet ditches left and right.

2.27 Clean BB type outlet ditches left and right.

2.51 Clean AA type outlet ditches left and right.

2.60 Clean AA type outlet ditches left and right.

2.67 Clean BB type outlet ditches left and right.

2.88 Clean AA type outlet ditches left and right.

3.00 Clean AA type outlet ditch left.

3.14 Clean BB type outlet ditches left and right.

3.19 Clean AA type outlet ditch right.

3.22 Clean AA type outlet ditch right.

3.42 Clean BB type outlet ditches left and right.

3.59 Clean AA type outlet ditches left and right.

FR 3213

MPDescription of Work
3.61Clean AA type outlet ditches left and right.

3.64 Clean AA type outlet ditches left and right.

3.66 Clean AA type outlet ditches left and right.

3.67 Clean AA type outlet ditch right.

3.71 Clean AA type outlet ditch left.

3.76Clean BB type outlet ditch left.
Maintain B type dip.

3.85 Clean BB type outlet ditch right.

3.88 Clean AA type outlet ditch right.

3.90 Clean AA type outlet ditch left.

3.93 Clean AA type outlet ditch right.

3.99 Clean BB type outlet ditches left and right.

4.05Clean AA type outlet ditches left and right.
4.17Clean BB type outlet ditches left and right.

4.24 Clean AA type outlet ditch right.

4.26 Clean AA type outlet ditch left.

4.40 Clean AA type outlet ditches left and right.

4.46 Clean BB type outlet ditches left and right.

4.53 Maintain B type dip.

4.64 Clean AA type outlet ditches left and right.

4.79 Clean AA type outlet ditches left and right.

4.86 Clean AA type outlet ditches left and right.

4.94 Clean AA type outlet ditches left and right.

FR 3213

MPDescription of Work
5.06Install low water crossing according to plans.

5.21 Maintain natural drain.

5.32 Maintain natural drain.

5.40 Clean BB type outlet ditch right.

5.44 Clean BB type outlet ditch right.

5.53 Clean AA type outlet ditches left and right.

5.56 End of FR 3213; State Highway 160.

ROAD RECONDITIONING

ITEM 2 – FOREST ROAD 372

McDANIEL

HOUSTON RANGER DISTRICT

PULASKI COUNTY, MISSOURI

MARK TWAIN NATIONAL FOREST

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION NINE

MARK TWAIN NATIONAL FOREST

MISSOURI

Rolla-Houston District

PULASKI COUNTY

EMERGENCY RELIEF FOR FEDERALLY OWNED ROADS

DISASTER NO. MO2011-1-FS

McDaniel – FR 372 Road Length – 1.3 Miles

PROJECT NUMBER: FR 372PROJECT NAME: McDaniel
MilepostDescription of Work
0.0Establish temporary traffic controls (See Sheet T5)
0.40 – 0.41Submit temporary erosion control plan to COR (See Sheet B2 for quantities).

Upon acceptance, establish temporary erosion controls for the low water crossing.

0.38 – 0.58Establish grade staking for Low Water Crossing at MP 0.40. Upon approval staking, construct 40’ low water crossing (See Sheet G1-G3). Perform Road Reconditioning according to typical sections (See Sheet A5) and according to the aggregate quantities summary (See Sheet B2).
0.58End of FR372 maintenance.

image3.jpeg image4.emf image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .