AG-64R4-S-14-0010_-_Wolf_Mountain_and_McDaniel_Road_Reconditioning_-_Description_of_Work.docx
DOCX document 524 KB Posted
- Solicitation number
- AG-64R4-S-14-0010
About this file
Description of Work
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. AG-64R4-S-14-0010
ROAD RECONDITIONING – MARK TWAIN NATIONAL FOREST
DESCRIPTION OF WORK
ROAD RECONDITIONING
ITEM 1 – FOREST ROAD 3213
WOLF MOUNTAIN
ELEVEN POINT RANGER DISTRICT
RIPLEY COUNTY, MISSOURI
MARK TWAIN NATIONAL FOREST
Description of Work
FR 3213
| MP | Description of Work | |
| 0.00 | Beginning at State Highway V begin road reconditioning reshape ditchline and establishing | crown in road prism. |
| Place 1” crushed base aggegrate 12’ width and 2” depth. | ||
| 0.17 | Recondition drainage features according to plans. |
0.21 Clean inlet and outlet of culvert.
| 0.29 | Replace corrugated metal pipe culvert with 24”x22’ culvert. |
| Remove old culvert off National Forest land. |
0.45 Recondition drainage features according to plans.
0.47 Recondition drainage features according to plans.
0.49 Recondition drainage features according to plans.
0.54 Clean AA type outlet ditches left and right.
0.56 Clean AA type outlet ditches left and right.
0.59 Clean AA type outlet ditches left and right.
0.62 Clean AA type outlet ditches left and right.
0.78 Clean AA type outlet ditch right.
0.81 Clean AA type outlet ditches left and right.
0.86 Clean AA type outlet ditches left and right.
0.90 Clean AA type outlet ditch left.
0.94 Clean AA type outlet ditches left and right.
1.03 Clean BB type outlet ditches left and right.
1.08 Clean BB type outlet ditches left and right.
1.13 Clean BB type outlet ditches left and right.
FR 3213
| MP | Description of Work |
| 1.22 | Clean AA type outlet ditches left and right. |
1.31 Clean AA type outlet ditches left and right.
1.40 FR 3286 right.
| 1.49 | Clean AA type outlet ditches left and right. |
| Road narrows; lessen ditch depth to stay within clearing. |
1.56 FR 3149 left.
1.60 Clean BB type outlet ditches left and right.
1.78 Clean BB type outlet ditches left and right.
1.86 Clean BB type outlet ditches left and right.
2.00 Clean BB type outlet ditches left and right.
2.08 Clean BB type outlet ditches left and right.
2.22 Clean AA type outlet ditches left and right.
2.27 Clean BB type outlet ditches left and right.
2.51 Clean AA type outlet ditches left and right.
2.60 Clean AA type outlet ditches left and right.
2.67 Clean BB type outlet ditches left and right.
2.88 Clean AA type outlet ditches left and right.
3.00 Clean AA type outlet ditch left.
3.14 Clean BB type outlet ditches left and right.
3.19 Clean AA type outlet ditch right.
3.22 Clean AA type outlet ditch right.
3.42 Clean BB type outlet ditches left and right.
3.59 Clean AA type outlet ditches left and right.
FR 3213
| MP | Description of Work |
| 3.61 | Clean AA type outlet ditches left and right. |
3.64 Clean AA type outlet ditches left and right.
3.66 Clean AA type outlet ditches left and right.
3.67 Clean AA type outlet ditch right.
3.71 Clean AA type outlet ditch left.
| 3.76 | Clean BB type outlet ditch left. |
| Maintain B type dip. |
3.85 Clean BB type outlet ditch right.
3.88 Clean AA type outlet ditch right.
3.90 Clean AA type outlet ditch left.
3.93 Clean AA type outlet ditch right.
3.99 Clean BB type outlet ditches left and right.
| 4.05 | Clean AA type outlet ditches left and right. |
| 4.17 | Clean BB type outlet ditches left and right. |
4.24 Clean AA type outlet ditch right.
4.26 Clean AA type outlet ditch left.
4.40 Clean AA type outlet ditches left and right.
4.46 Clean BB type outlet ditches left and right.
4.53 Maintain B type dip.
4.64 Clean AA type outlet ditches left and right.
4.79 Clean AA type outlet ditches left and right.
4.86 Clean AA type outlet ditches left and right.
4.94 Clean AA type outlet ditches left and right.
FR 3213
| MP | Description of Work |
| 5.06 | Install low water crossing according to plans. |
5.21 Maintain natural drain.
5.32 Maintain natural drain.
5.40 Clean BB type outlet ditch right.
5.44 Clean BB type outlet ditch right.
5.53 Clean AA type outlet ditches left and right.
5.56 End of FR 3213; State Highway 160.
ROAD RECONDITIONING
ITEM 2 – FOREST ROAD 372
McDANIEL
HOUSTON RANGER DISTRICT
PULASKI COUNTY, MISSOURI
MARK TWAIN NATIONAL FOREST
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION NINE
MARK TWAIN NATIONAL FOREST
MISSOURI
Rolla-Houston District
PULASKI COUNTY
EMERGENCY RELIEF FOR FEDERALLY OWNED ROADS
DISASTER NO. MO2011-1-FS
McDaniel – FR 372 Road Length – 1.3 Miles
| PROJECT NUMBER: FR 372 | PROJECT NAME: McDaniel | ||
| Milepost | Description of Work | ||
| 0.0 | Establish temporary traffic controls (See Sheet T5) | ||
| 0.40 – 0.41 | Submit temporary erosion control plan to COR (See Sheet B2 for quantities). |
Upon acceptance, establish temporary erosion controls for the low water crossing.
| 0.38 – 0.58 | Establish grade staking for Low Water Crossing at MP 0.40. Upon approval staking, construct 40’ low water crossing (See Sheet G1-G3). Perform Road Reconditioning according to typical sections (See Sheet A5) and according to the aggregate quantities summary (See Sheet B2). |
| 0.58 | End of FR372 maintenance. |
image3.jpeg image4.emf image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .