Schedule of Items etc.doc
DOC document 51 KB Posted
- Attached to
- RECOVERY: Rhinelander: Window Replacement Federal contract opportunity
- Solicitation number
- AG-63PX-S-09-0008
About this file
Amended Schedule of Items Part C and Part J
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R -Replacement Window Final Schedule Details.docx | DOCX document | |
| SF30 7.pdf | ||
| R -SECTION_08551 Final version 10.19.09.docx | DOCX document | |
| SF30 6.pdf | ||
| SF 30.pdf | ||
| ARRA SF-30 Amendement of Solicitation.doc | DOC document | |
| SF-30 Amendement of Solicitation.doc | DOC document | |
| ARRA SF-30 Amendement of Solicitation.docx | DOCX document | |
| SF-30 Amendement of Solicitation.docx | DOCX document | |
| 1970 wing framing details .pdf | ||
| Window Types sketch.pdf | ||
| 1970 Wing Exterior Wall Details.pdf | ||
| 1960 Wing Window Framing Details.pdf | ||
| Wage Decision.WI080011.doc | DOC document | |
| 1960 Wing West Elevation Details.pdf | ||
| SECTION 08551.doc | DOC document | |
| Existing Windows Tables Photos.doc | DOC document | |
| SECTION 07900.doc | DOC document | |
| SF-1442 SOLICITATION OFFER AND AWARD.doc | DOC document | |
| LBP_final_report.pdf | ||
| Rhinelander Window Schedule Final Table Submittal.doc | DOC document | |
| SECTION 06114.doc | DOC document |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amended 08/20/2009: AG-63PX-S-09-0008 Rhinelander Window Replacement
PART I—THE SCHEDULE
SECTION B - SCHEDULE OF ITEMS
Window Unit Replacements
Rhinelander Forest Sciences Laboratory
Rhinelander, Wisconsin
ITEM
* METHOD OF
PAY
ESTIMATED
NO.
DESCRIPTION
MEASUREMENT
UNIT
QUANTITY
AMOUNT
Base Bid
01 Remove existing window Unit (Set) Each units and replace with new window units 1960/1970 wings.
**All window sills shall be replaced on the 1960/1970 window units.
Additive Alternate 1
02 Remove existing window Unit (Set) Each units and replace with new window units in the 1956
Annex.
TOTAL BID $____________
SUBMIT BIDS TO:
USDA FOREST SERVICE
NORTHERN RESEARCH STATION
SOLICITATION: AG-63P-X-S-09-0008
5985 HIGHWAY K
RHINELANDER, WI 54501
E. REFUSE/WASTE DISPOSAL
1. Each window unit removed in conjunction with this project shall become the property of the Contractor, who shall be responsible for removing the window unit off government property and disposing of said unit in an approved landfill.
NOTE: Window units have Lead Based Paint (LBP) containing materials. Because, this is the case, appropriate LBP handling and disposal procedures will be mandatory.
2. Removed window units may be stockpiled at a site acceptable to the Government for removal off-site upon completion of the project, or deposited in a Contractor-provided dumpster. See NOTE above.
3. The Contractor will be required to provide a dumpster or hauler for disposal of all project-generated debris.
4. The Contractor shall maintain the project site free and clear of garbage/debris on a daily basis.
F. WORKING SCHEDULE
1. The standard working hours for this facility are 8:00 – 4:30, Monday thru Friday, excepting official Federal holidays.
2. The Contractor shall submit a complete plan of work, work schedule and safety plan to the Contracting Officer prior to the start of work. The Contractor shall notify the CO, the COR and the on-site Government representative seven (7) days prior to the commencing of work. The work schedule shall delineate the rooms in which the window units will be replaced such that adequate notification of office occupants can be made.
G. FIELD VERIFICATION
1. The drawings provided are rough sketches and do not necessarily represent the actual construction/installation of the window units. It is the Contractor’s responsibility to field-verify existing window cavities prior to ordering new window units for this project.
PART 2 – PRODUCTS
A. WINDOW UNITS
1. The Contractor shall reference Section 08551 – Aluminum-Clad Wood Casement Windows and Part 3 – Execution of this scope for a complete product description of new window units.
PART 3 – EXECUTION
A. TEMPORARY WINDOW PROTECTION
1. Each window cavity shall be protected during the removal and installation for the new window unit such that no cavity is left unprotected overnight during the execution of this project. All window cavities shall be secured against unauthorized access. Upon removal of the existing window unit, the new window unit shall be installed and fully secured in place.
B. WINDOW REMOVAL AND INSTALLATION
1. The Contractor shall reference Section 08551 – Aluminum-Clad Wood Casement Windows, for a complete description of installation requirements for new window units.
2. Base Bid:
The window units to be removed are wood casement or wood fixed-pane units with single pane glass. The replacement windows vary in size and configuration (see sketch and Base Bid Table). Replacement windows in the 1960/1970 wings shall be wood-framed triple-glazed with exterior tan aluminum cladding and interior wood stained or painted, as indicated on the table (Pella, or approved equal). All windows are to be constructed with integral Slim-shade blinds, with hand-crank operators mounted at the interior bottom of the window unit. Casement windows shall be equipped with removable screens and hand-crank operators and matching hardware.
Add/Alternate Bid 1:
The window units in the 1956 Annex Building are aluminum framed, with aluminum trim both interior and exterior. Most have an awning panel at the bottom that hinges open to allow natural ventilation. These windows are to be replaced with brown fiberglass-framed double-glazed Low-E argon-filled window units with thru-frame mounting (Pella, or approved equal). TEN new units will be two-lite slider-type windows; four will be single lite fixed; and one will be single-hung. (See Add/Alternate Table).
3. The Contractor is responsible to perform all necessary work for the complete installation of each window unit, including but not limited to: rough opening modifications as necessary to install the new window units, existing sill preservation and/or modifications or replacement if necessary, application of exterior joint sealant, replacement of interior trim (in-kind), and finishing of interior exposed wood on the new window units and trim. Exterior trim shall match and be included in the installation of the window units. Also included is all work and materials necessary to ensure proper insulation of the windows, mullions (if applicable), and wall cavities surrounding the windows, and repair and painting (to match) of any wall or other surfaces damaged in the course of this work.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Title of Attachment
Located
Page (s) Specifications: 06114 attached
2 pages
Specifications: 07900
4 pages
Specifications: 08551
7 pages
Lead Based Paint (LBP) Report
1 page
Existing Windows Tables & Photos
11 pages
Window Types Sketch
1 page
Window Schedule
General Decision No.
WI080011 (08/21/2009)
29 pages 1960/1970 Blueprints