RFIs_from_8-24-17_site_visit.pdf

PDF 82 KB Posted

Attached to
Construction of maintenance shop and industrial facility
Solicitation number
AG-6395-S-17-0092
Issued by

About this file

RFIs

View the file

Other files

File Type Posted
Amendment_3.pdf PDF
Even_MORE_RFIs.pdf PDF
Spec_section_16716.pdf PDF
More_RFIs.pdf PDF
E-102_3018427-0001_(1).pdf PDF
Amendment_00002.pdf PDF
07531,_revised.pdf PDF
07272,_revised.pdf PDF
07710,_revised.pdf PDF
Amendment_00001.pdf PDF
2008_MDF_WH_geotech_report.pdf PDF
SiteVisitAttLog-8-24-17.pdf PDF
General_Decision_No._MD58.pdf PDF
2017.08.10_Drawings_Maint_Shop_&_Ind_Fac_Rev_C.pdf PDF
2017.08.10_Specs_Vol_2_Maint_Shop_&_Ind_Fac_Rev_C.pdf PDF
AG-6395-S-17-0092.pdf PDF
USDA_Sustainable_Buildings_Implementation_Plan.doc DOC document
All_Green_Products.xls XLS spreadsheet
2017.08.10_Specs_Vol_1_Maint_Shop_&_Ind_Fac_Rev_C.pdf PDF
USDA_Guidance_on_Electric_Metering.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation AG-6395-S-17-0092 Construct New Maintenance Shop & Industrial Facility

RFIs from 8/24 site visit

1. When is the deadline for RFIs? All RFIs are due by 9/8/2017.

2. Is funding in place for this project? Yes

3. Is there a laydown area? A laydown area is addressed in the drawings.

4. Will a construction trailer be allowed? Yes, can be addressed at pre-construction meeting.

5. Are there any contamination concerns? Our work is performed on plant material and is not dangerous to humans. Additionally, your work should not conflict with our experiments.

6. Will security badges be an issue? You will not be issued badges, however every worker must sign in and out at the guard desk each day. A separate log book will be maintained for the duration of the construction project.