MN Wage Rate 5.4.12.docx
DOCX document 19 KB Posted
- Solicitation number
- AG-56A1-S-12-0002
About this file
Davis Bacon Wage Determination MN Wage Rates 7 pages
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WalkerAmdmnt004.PDF | ||
| Amendment003.doc | DOC document | |
| 0013_001 | — | |
| 5.30.12Attendees.pdf | ||
| Walkeramdmnt002attachments.PDF | ||
| walkeramdmnt002.PDF | ||
| Electrical_100CD_4.27.12.pdf | ||
| Walkeramdmnt001.PDF | ||
| SECTION J.docx | DOCX document | |
| SF 25APaymentBond.pdf | ||
| Responsibility Questionnaire.doc | DOC document | |
| Fire Protection_100CD_4.27.12.pdf | ||
| V1_Specifications_100CD_5.06a.12.pdf | ||
| SF 25PerformanceBond.pdf | ||
| V2_Specifications_100CD_4.27.12.pdf | ||
| SF 24BidBond.pdf | ||
| Final_Walker2012.pdf | ||
| General_100CD_4.27.12.pdf | ||
| Structural_100CD_5.6.12.pdf | ||
| Architectural_100CD_4.27.12.pdf | ||
| Technology_100CD_4.27.12.pdf | ||
| Plumbing_100CD_4.27.12.pdf | ||
| CIVIL_100CD_4.27.12.pdf | ||
| Landscape_100CD_4.27.12.pdf | ||
| Mechanical_100CD_4.27.12.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MN120051 05/04/2012 MN51
Superseded General Decision Number: MN20100085
State: Minnesota
Construction Type: Building
County: Cass County in Minnesota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/06/2012 1 02/03/2012 2 04/06/2012 3 05/04/2012
BOIL0647-001 01/01/2012
Rates Fringes
BOILERMAKER......................$ 31.72 24.40
BRMN0015-001 05/01/2010
Rates Fringes
BRICKLAYER.......................$ 30.72 15.03
BRMN0015-003 05/01/2010
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.27 15.03
CARP0606-018 08/03/2009
AITKIN, ITASCA, KOOCHICHING, LAKE OF THE WOODS
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work & Metal Stud Installation)...............$ 25.75 12.69
ELEC0242-015 05/29/2011
CASS (Southern part bounded on the north by the south line of Leech Lake, Minnesota Island, Could, Bay River & Salem Townships)
Rates Fringes
ELECTRICIAN......................$ 30.39 22.90
ELEC0294-001 05/29/2011
CASS (Northern part bounded on the south by a line extending east & west of the south line of Boy River & Salem Townships)
ELECTRICIAN......................$ 31.68 23.32
ELEV0009-004 01/01/2012
Rates Fringes
ELEVATOR MECHANIC................$ 43.21 23.535
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
* ENGI0049-050 05/01/2012
Rates Fringes
OPERATOR: Power Equipment
GROUP 1.....................$ 35.19 15.95
GROUP 2.....................$ 34.85 15.95
GROUP 3.....................$ 33.44 15.95
GROUP 4.....................$ 33.10 15.95
GROUP 5.....................$ 32.93 15.95
GROUP 6.....................$ 31.42 15.95
GROUP 7.....................$ 30.30 15.95
GROUP 8.....................$ 28.29 15.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.
GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane 200' & Over.
GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane (Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.
GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);
Overhead Crane (inside building perimeter).
GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor 450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.
GROUP 6: Bobcat/Skid Loader, Loader up to 1 cu. yd., Tractor D2 or similar size.
GROUP 7: Crane Oiler.
GROUP 8: Oiler, Greaser (Tractor/Truck).
* IRON0512-019 05/01/2012
Rates Fringes
IRONWORKER, ORNAMENTAL,
REINFORCING, AND STRUCTURAL......$ 29.24 21.20
LABO0132-024 03/04/2011
Rates Fringes
LABORER (ASBESTOS ABATEMENT)
Removal from Floors, Walls & Ceilings..................$ 29.43 12.75
LABO0132-025 05/01/2011
Rates Fringes
LABORER (LANDSCAPE)..............$ 18.79 10.05
LABO0563-017 06/01/2010
Rates Fringes
Laborers:
(1) Mason Tender (Brick, Cement/Concrete)............$ 23.91 12.18
(2) Pipelayer...............$ 24.66 12.18
PROJECTS OVER $950,000: $1.75 additional per hour.
PAIN0884-012 06/01/2010
Rates Fringes
PAINTER
Brush, Roller, Paperhanger..$ 24.16 13.31
PROJECTS UNDER $8,000: Receive 80% of basic hourly rate.
PAINTER'S PREMIUM: $0.75 per hour additional for the following work: Two Component Paints, Epoxies, Sandblasting & Rigging, Work done on Swing Scaffolding, Safety harness, Window Jacks, Boatswain's Chair, Coverings & erection of scaffolding for same, Work on erected Structural Steel, Abrasive Blasting.
PAIN0884-015 08/01/2011
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 22.86 13.53
PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.
PLUM0011-021 05/01/2011
CASS (Southern half)
Rates Fringes
PLUMBER/PIPEFITTER...............$ 29.69 12.81
PLUM0589-001 05/01/2011
CASS (North of a parallel line drawn from the northern boundary of Crow Wing County west to the east boundary of Wadena County)
PLUMBER/PIPEFITTER...............$ 33.36 18.55
ROOF0096-009 07/01/2011
Rates Fringes
ROOFER...........................$ 29.11 10.50
SHEE0010-009 06/01/2010
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct and System Installation)....................$ 30.07 16.67
SUMN2009-005 07/27/2009
Rates Fringes
GLAZIER..........................$ 19.75 5.53
LABORER: Common or General......$ 14.16 3.97
LABORER: Roof Tearoff...........$ 10.42 2.08
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 20.75 0.00
OPERATOR: Excavator.............$ 17.64 2.97
OPERATOR: Mechanic..............$ 19.74 4.47
TRUCK DRIVER: Dump Truck........$ 13.92 1.08
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .