_2_Plans.pdf
PDF 1 MB Posted
- Attached to
- HIA - Munising Bunkhouse Bathroom Renovation
- Solicitation number
- AG-569R-S-15-0003
About this file
AG-569R-S-15-0003 Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Munising_Bunkhouse_Remodel_Pre-Bid_Meeting_Notes_ _Attendee_list.docx | DOCX document | |
| Munising_Bunkhouse_Bathroom_Renovations_Prebid_Questions_11.docx | DOCX document | |
| FAR_52.222-99_USDA_Deviation_Clause_11-3-2014.docx | DOCX document | |
| SF_1442.pdf | ||
| _1_Specifications.docx | DOCX document | |
| _3_Plan_Signature_Page.pdf | ||
| _5_Experience_Questionnaire.doc | DOC document | |
| _4_MI103_Wage_Determination.pdf | ||
| AG-569R-S-15-0003.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing shower stalls.
Existing exhaust fan/heat/light fixture
Existing floor drain serving showers
Demo and remove existing drain and concrete floor as needed to install flood resistant type floor drain.
Furnace
Electric Panel
Existing kitchen sink
Existing waste stack
Demo and remove existing drain and concrete floor as needed to install flood resistant type floor drain.
Note: Not all building features are shown.
Demo and remove existing shower stalls, raised floor decking, and all water piping not designated for re-use, maintain water service to exterior hose bib, existing showers have above floor drains to the floor drain in the corner.
Demo and remove existing fan/heat/exhaust fan and duct.
Cover and seal hole through rim joist, patch siding, and insulate interior of rim joist between floor joists. Remove all extraneous wiring, conduit, and accessories.
Demo and remove existing drain and concrete floor as needed to install flood resistant type floor drain. Approximately 1 sf floor demo.
Demo and remove existing drain and concrete floor as needed to install flood resistant type floor drain.
General location of concrete demolition, required for new drain piping installation. Contractor to field fit with approval of CO, Saw cut joints. Approximately 110 sf floor demo and replacement.
Demo and remove existing drain and concrete floor as needed to install flood resistant type floor drain.
2x6 wall all visible sides have sheating
2x4 stud wall constructed against
1" XPS insulation adhered to concrete with taped seams.
2x4 furring strip wall
2x4 wall all visible sides have sheating
Access Panels
1" XPS insulation adhered to concrete with taped seams and standard wall studs on flats constructed against rigid insulation.
Standard 2x wall construction 16"OC Vinyl Base
2x treated bp
Varies approx.
6'8"-7'2"
See construction note 10 for paneling sizes and type
Wall Details
No Scale
All Gypsum Board sheathing shall have level 4 finish
Install 1" rigid xps insulation between concrete wall and studs.
Wall Plan
No Scale
Install unfaced batt insulation between studs where indicated in wall plan.
Unfaced batt insulation between studs on walls between restrooms and exterior walls.
Install gasket/capillary break under wall bottom plates
Seal rigid insulation against concrete wall continuously along top and bottom of wall assembly. Run rigid insulation to floor. Leave 1/4" gap between drywall and floor.
FD
FD
New sewer drain lines and venting, tie new venting into existing vent system;
Contractor may install more efficient layout with prior CO approval
Install backflow preventer
Install flood resistant floor drain, maintain existing tie in with stack
Install flood resistant floor drain, tie existing lateral line into new main, run W.H.
condensate line to drain.
Existing stack
Shower
Stall
Shower
Stall
FD
FD
FD
Replace existing hose bib with anti-syphon frost proof type.
Replace existing hose bib with anti-syphon frost proof type.
Install flood resistant floor drain.
CO
Install T-8 Fluorescent fixture, match existing fluorescent fixtures, install new switch at room entrance, tie into existing light circuit, new wiring in exposed locations shall be installed i conduit. Remove extraneous wiring.
Install T-8 Fluorescent vanity fixture, share circuit with vanity light in adjacent restroom.
Install fan/light combo fixture, share circuit with fan/light in adjacent restroom. Adjust location as needed to avoid existing equipment.
Install 20A GFCI receptacle, share circuit with GFCI in adjacent restroom. Mounting height should be above sink, may share device box with switches if possible.
See Note 8 on Notes page for new circuit information.
Existing J-box in this area provide access in ceiling finish.
Existing fan and vent to be removed, see demo plan.
Existing 6" round duct
(typical) run along bottom and between joists.
Existing 3" plastic furnace combustion and vent pipes
Hatched area indicates floor clear working space for furnace.
Existing HVAC
Frame and install ceiling around ductwork piping.
Adjust furnace exhaust and combustion air vents to ensure a minimum finished ceiling height above the finished floor of 6'8".
Adjust HVAC ducts around new walls
Install shower exhaust fan/light combo with rigid ducts and inline backdraft dampers installed at wall protrusions install louvered vent termination kits with bug screen.
Proposed HVAC
File details come from the government source that posted it. Updated .