ORB3027_Harden Ridge_Sec B_Schedule of Items_amend 1.xls

XLS spreadsheet 35 KB Posted

Attached to
Harden Ridge Recreation Area Paving
Solicitation number
AG-52B1-S-10-0057
Issued by

About this file

Section B - Schedule of Items

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

HRRA Paving Contract
ORB-3027
SECTION B - Schedule of Items
Base Items
Hardin Ridge Recreation Area Road and Camping Loops Rehab Project
Rd 4725.000 Surface Repairs (Digouts)
StationDescriptionUnitQuantityUnit PriceTotal Price
105+50Pave ditch trough/curb & riprap relief ditchLin. Ft.800$$
101+07edge crackingsq. ft.1260$$
96+43pavement distresssq. ft.336$$
94+19pavement distresssq. ft.4500$$
88+86pavement distresssq. ft.1249.5$$
85+79pavement distresssq. ft.1071$$
81+44pavement distresssq. ft.661.5$$
69+23weak subgradesq. ft.3927$$
67+55edge crackingsq. ft.976.5$$
63+91pavement distresssq. ft.987$$
57+51pavement distresssq. ft.1428$$
50+91pavement distresssq. ft.1827$$
32+55weak subgradesq. ft.4902$$
30+64pavement distresssq. ft.2090$$
14+98edge crackingsq. ft.380$$
11+03pavement distresssq. ft.2919$$
9+08pavement distresssq. ft.2039$$
8+50pavement distresssq. ft.1254$$
7+10edge crackingsq. ft.1551$$
5+06pavement distresssq. ft.1054$$
4+35pavement distresssq. ft.756$$
Surface Repair Total Costs$____________
Pine Camping Loop Upgrades
Camping Spur #DescriptionUnitQuantityUnit PriceTotal Price
187Camping Spur Rehabsq. ft.960$$
188Camping Spur Rehabsq. ft.960$$
189Camping Spur Rehabsq. ft.1060$$
190Camping Spur Rehabsq. ft.860$$
153Camping Spur Rehabsq. ft.960$$
172Camping Spur Rehabsq. ft.1100$$
164Camping Spur Rehabsq. ft.1000$$
165Camping Spur Rehabsq. ft.1160$$
Bath House #1Reconstruct Parking Areasq. ft.2430$$
Bath House #2Construct Parking Areasq. ft.900$$
Pine Camping Loop Uprade Total Cost$___________
Blue Gill Camping Loop Upgrades
Camping Spur #DescriptionUnitQuantityUnit PriceTotal Price
131Camping Spur Rehabsq. ft.720$$
87Camping Spur Rehabsq. ft.1000$$
88Camping Spur Rehabsq. ft.860$$
89Camping Spur Rehabsq. ft.840$$
130Camping Spur Rehabsq. ft.940$$
99Camping Spur Rehabsq. ft.1200$$
91Camping Spur Rehabsq. ft.1400$$
90Camping Spur Rehabsq. ft.1000$$
Blue Gill Camping Loop Upgrades Total Cost$___________
Southern Point Camping Loop Upgrades
Camping Spur #DescriptionUnitQuantityUnit PriceTotal Price
42Camping Spur Rehabsq. ft.740$$
41Camping Spur Rehabsq. ft.800$$
59Camping Spur Rehabsq. ft.940$$
44Camping Spur Rehabsq. ft.840$$
43Camping Spur Rehabsq. ft.860$$
Southern Point Camping Loop Upgrades Total Cost$____________
Asphalt Patch Over Culverts
LocationDescriptionUnitQuantityUnit PriceTotal Price
Southern Point Spur 25Culvert Patchsq. ft.74$$
Southern Point Spur 26Culvert Patchsq. ft.74$$
Southern Point Spur 27Culvert Patchsq. ft.74$$
White Oak Camp LoopCulvert Patchsq. ft.39$$
Holland Camping LoopCulvert Patchsq. ft.63$$
Blue Gill Spur 126Culvert Patchsq. ft.74$$
Blue Gill Spur 127Culvert Patchsq. ft.82$$
Blue Gill Spur 128Culvert Patchsq. ft.74$$
Culvert Asphalt Patch Total Cost$____________
Miscellaneous Items
Disposal Site rehab and silt fence installationLS1$$
Mobilization for Base itemsLump Sum1$$
Miscellaneous Total Cost$___________
Base Item Total Cost$_________
HRRA Paving Contract
ORB-3027
Optional Bid Items
The following optional bid items will be awarded in the order shown as funding allows.
Schedule of Items
Option 1 Bid Items
Hardin Ridge Recreation Area Road - 4725.000
Station/Spur #DescriptionUnitQuantityUnit PriceTotal Price
Rd 4725.000 Overlay
118+73 (EOP) - 89+86 (Pine Loop)Place 1 1/2" #11 asphalt surface course (includes overlook pulloff). Mill ends of asphalt and side roads.Ton571$$
89+86 - 40+60 (Southern Point Loop)Place 1 1/2" #11 asphalt surface course. Includes placement of 3" depth of surface course for length of 25' on junction with sewage treatement road at station 84.38. Mill side roads and ends as needed.Ton913$$
40+60 - 4+35 GatehousePlace 1 1/2" #11 asphalt surface course. Mill all side roads.Ton700$$
4+35 - 0+00 (BOP)1 1/2" #11 asphalt surface course (includes small parking area at 3+00). Mill surfacing through and around gatehouse and at jct with the county road.Ton250$$
Mobilization for Option 1Lump Sum1$$
Option 1 Overlay & Shoulder Aggregate Total Cost$____________
HRRA Paving Contract
ORB-3027
Schedule of Items
Option 2 Bid Items
Hardin Ridge Recreation Area Road - 4725.000 Stripping
Station/Spur #DescriptionUnitQuantityUnit PriceTotal Price
Rd 4725.000 Road Stripping
0+60Yellow solid stripeLF267$$
0+60White Solid stripeLF284$$
40+18White Crosswalk stripesLF68$$
90+76White Crosswalk stripesLF76$$
Pine Camp Loop Bath House 1Stripe parking space lines, walkway, and 1 handicap symbolLump sum1$$
Pine Camp Loop Bath House 2Stripe parking space lines.Lump sum1$$
Mobilization for Option 2Lump Sum1$$
Option 2 Stripping Total Price$____________
HRRA Paving Contract
ORB-3027
Schedule of Items
Option 3 Bid Items
Hardin Ridge Recreation Area Road - 4725.000 Shoulder Aggregate
Station/Spur #DescriptionUnitQuantityUnit PriceTotal Price
Rd 4725.000 Shoulder Aggregate
0+00 - 118+73#73 Shoulder AggregateTon435$$
Mobilization for Option 3Lump Sum1$$
Option 3 Stripping Total Price$____________
Optional Items Total Cost$____________
TOTAL PROJECT COST$_________

Sheet2

File details come from the government source that posted it. Updated .