Hardin Ridge Asphalt Road Repairs - Road 4725.000
Section 1A
Sq. Ft. Area
Section 2A
Sq. Ft. Area
Section 4
Sq. Ft.
Area
0+00 1/ Both 1 1/2" #11 HMA 323 40 12,920
Begin 1 1/2" asphalt surface course overlay and
#73 shoulder aggregate to protect edge of pavement. Mill beginning and end of road and all road junctions.
0+60 Right Yellow Stripping 267 Stripe centerline of the road
0+60 Right White Stripping 284 Stripe right lane of the road
3+00 Right Parking area 23 27 621 Place 1 1/2" asphalt surface course overlay parking area
3+45 Right Rt lane gatehouse 175 12 2,100 Mill road and place 1 1/2" asphalt surface course overlay right lane at gatehouse
3+45 Left Left Lane gatehouse 285 12 3,420 Mill and place 1 1/2" asphalt surface course overlay left lane at gatehouse
3+45 Center lane gatehouse 196 15 2,940 Mill road and place 1 1/2" asphalt surface course overlay center lane thru gatehouse
4+35 1/ Both 1 1/2" #11 HMA 11,438 20 228,760
4+35 Left Pavement distress 63 12 756
5+06 Both Pavement distress 43 24.5 1053.5
7+10 (MP
0.1A) Right edge cracking 141 11
8+50 Both Pavement distress 57 22 1254
9+08 Right Pavement distress 151 13.5 2038.5
11+03
(MP 0.2A)
Both Pavement distress 139 21 2919
14+98 (MP
0.2B) Right edge cracking 38 10 380 Jct with RV dump left.
30+64 (MP
0.5A) Right Pavement distress 190 11 2090
32+55 Both Weak Subgrade 228 21.5 4902
40+18 MP
0.7A) Both Pedestrian Crosswalk 22'
Paint 5' wide yellow crosswalk across road with
4 hash marks
50+91 (MP
0.9A) Right Pavement distress 174 10.5 1827
57+51 Right Pavement distress 136 10.5 1428
63+91
(MP 1.2A)
Right Pavement distress 94 10.5 987
67+55 Right edge cracking 93 10.5 976.5
HRRA Paving Contract
ORB-3027
Table 1 - Description of Work
Width
Road Dig outs
Lane Remarks Overlay Sq.
Ft. Area
Station
(milepost) Description Length
69+23 Both Weak Subgrade 187 21 3927
Excavate to widths and depth shown, slope to drain left thru shoulder. Backfill as shown on drawings. (White Oak Camping Loop jct)
75+83 Both Paving fabric 40 20 Place 90 sq. yds of paving fabric incidental to overlay cost
81+44
(MP 1.6A)
Right Pavement distress 63 10.5 661.5
85+79
(MP 1.6B)
Right Pavement distress 102 10.5 1071
88+86 Left Pavement distress 119 10.5 1249.5
90+76
(MP1.7A)
Both Pedestrian Crosswalk 26
Paint 5' wide yellow crosswalk across road with
4 hash marks
94+19 (MP
1.8A) Both Pavement distress 225 20 4500
96+43 Left edge cracking 32 10.5 336
Construct trench drain consisting of FS supplied perf pipe, geotextile, and #2 aggregate in left ditch line to drain digout
98+72 Left Scenic overlook parking area 150 10 1500 Remove and reset curbing
101+07
(MP 1.9A)
Right Pavement distress 120 10.5 1260
102+27
(MP 2.0)
Disposal area access right for excavated material
105+50 Paved trough (ditch) 300 4 1200
118+73
(MP 2.3) End overlay End Project
All Disposal Area
Shaping of disposal area to drain and installation of silt fence
All Mobilization
Mobilize equipment, men, materials to project and istallation of signs, etc.
TOTALS TOTALS 252,261 3,927 29,508 1,733 35168 sq ft
1/ Average Width is shown for the station
Pave to guardrail, construct a trough in pavement to act as a ditch. Paved ditch is to go from the culvert within guardrail area to end of guardrail. At end of guardrail construct 3' wide runoff ditch draining onto natural ground. Within runoff ditch construct a concrete hardened rock check dam. Line runoff ditch with 8 oz nonwoven geotextile and fill with type 1 riprap..
Table 2 - Hardin Ridge
Length (Feet) Width
(inches) Sq Ft. Work Status
28 32 75 Optional
31 30 78 Optional
28 32 75 Optional
28 32 75 Optional
28 32 75 Optional
27 30 68 Optional
16 30 39 Optional
19 40 63 Optional
HRRA Paving Contract ORB-3027 - Pine Camping Loop
Spur # Width
(inches) Length (Feet) Sq Ft.
Tree to remove Work Status
187 20 48 960 1 Optional
188 20 48 960 3 Optional
189 20 53 1060 7 Optional
190 20 43 860 5 Optional
153 20 48 960 3 Optional
172 20 55 1100 0 Optional
164 20 50 1000 1 Optional
165 20 58 1160 Optional
Bluegill Site 126
Bluegill Site 127
Bluegill Site 128
Southern Point Site 25
Southern Point Site 26
Location
Total
HRRA Paving Contract ORB-3027 - Tier 1 - Additional Paving needs
Southern Point Site 27
White Oak
Holland
Raise grade at back of spur as staked
Remove 3" depth of existing fill material and patch over designated culverts with 3" compacted depth of
#9 HMA Binder.
Add material to gain width
Camping spur work shall consist of excavating spur to a depth of 8" to length and width shown. Backfill excavated area with 6" of compacted #53 aggregate. Pave spur with a 3" depth of #9 HMA. Place #73 aggregate along edge of asphalt sloping to drain.
Remove identified trees along with stump(s). Backfill and compact stump hole(s) with excavated spur material.
Remove pipe across jct. Const ditch between lift station and spur.
Bath house 1 27 90 2430 Optional
Bath house 2 20 45 900 Optional
Totals 11390 20
HRRA Paving Contract ORB-3027 - Bluegill Camping Loop
Spur # Width
(inches) Length (Feet) Sq Ft.
Tree to remove Work Status
131 20 36 720 1 Optional
87 20 50 1000 2 Optional
88 20 43 860 Optional
20 42 840 Optional
20 47 940 1 Optional
20 60 1200 5 Optional
20 70 1400 Optional
90 20 50 1000 1 Optional
Totals 7960 10
Camping spur work shall consist of excavating spur to a depth of 8" to length and width shown. Backfill excavated area with 6" of compacted #53 aggregate. Pave spur with a 3" depth of #9 HMA. Place #73 aggregate along edge of asphalt sloping to drain.
Remove identified trees along with stump(s). Backfill and compact stump hole(s) with excavated spur material.
Remove existing asphalt, excavate, and shape to meet required dimensions. Place 6" depth of #53 aggregate and place 3' depth of #9 asphalt binder. Paint parking lines and walkway.
Construct parking area as staked on the ground by the FS. Place 6" depth of #53 aggregate and place 3" depth of #9 asphalt binder.
Install 15" pipe across junction
Numerous small trees to be removed
Raise grade at back of spur as staked