Table 2 - Description of Work

View the file

Other files for this federal contract opportunity

Other files attached to Harden Ridge Recreation Area Paving, newest first.
File Type Posted
SF 30_ORB 3027_HRRA Paving_Amendment 2.pdf PDF
ORB3027_Harden Ridge_Hoosier_Sec J_amend 1.pdf PDF
ORB3027_Harden Ridge_Hoosier_Davis Bacon.pdf PDF
ORB3027_Harden Ridge_Map 2_amend 1.pdf PDF
ORB3027_Harden Ridge_Typical Sections and Details_amend 1.pdf PDF
ORB3027_Harden Ridge_Sec B_Schedule of Items_amend 1.xls XLS spreadsheet
SF 30_ORB 3027_HRRA Paving_Hoosier.pdf PDF
ORB3027_Harden Ridge_Hoosier_Table1_Description of Work.pdf PDF
ORB3027_Harden Ridge_General Notes.pdf PDF
ORB3027_Harden Ridge_Hoosier_Sec K_amend 1.pdf PDF
ORB3027_Harden Ridge_Map 1_amend 1.pdf PDF
ORB3027_Harden Ridge_Vicinity Map_amend 1.pdf PDF
ORB3027_Harden Ridge_Hoosier_Specifications.pdf PDF
ORB3027_Harden Ridge_Drawings_2.pdf PDF
ORB3027_Harden Ridge_Hoosier_Davis Bacon.pdf PDF
ORB3027_Harden Ridge_Hoosier_Specifications.pdf PDF
ORB3027_Harden Ridge_Hoosier_Solicitation.pdf PDF
ORB3027_Harden Ridge_General Notes.pdf PDF
ORB3027_Harden Ridge_Hoosier_prerproposal package_A_K.pdf PDF
ORB3027_Harden Ridge_Sec B_Schedule of Items.pdf PDF
ORB3027_Harden Ridge_Sec B_Schedule of Items.pdf PDF
ORB3027_Harden Ridge_Hoosier_Table1_Description of Work.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 2 - Hardin Ridge

Length (Feet) Width

(inches) Sq Ft. Work Status

28 32 75 Base

31 30 78 Base

28 32 75 Base

28 32 75 Base

28 32 75 Base

27 30 68 Base

16 30 39 Base

19 40 63 Base

HRRA Paving Contract

Table 2 - Description of Work

ORB-3027

Holland

Total

HRRA Paving Contract ORB-3027 - Tier 1 - Additional Paving needs

Location Remove 3" depth of existing fill material and patch over designated culverts with 3" compacted depth of

#9 HMA Binder.

Bluegill Site 126

Bluegill Site 127

Bluegill Site 128

Southern Point Site 25

Southern Point Site 26

Southern Point Site 27

White Oak

HRRA Paving Contract

Table 2

HRRA Paving Contract ORB-3027 - Pine Camping Loop

Spur # Width

(Feet) Length (Feet) Sq Ft.

Tree to remove Work Status

187 20 48 960 1 Base

188 20 48 960 3 Base

189 20 53 1060 7 Base

190 20 43 860 5 Base

153 20 48 960 3 Base

172 20 55 1100 0 Base

164 20 50 1000 1 Base

165 20 58 1160 Base

Bath house 1 27 90 2430 Base

Bath house 2 20 45 900 Base

Totals 11390 20

Remove existing asphalt, excavate, and shape to meet required dimensions. Place 6" depth of #53 aggregate and place 3' depth of #9 asphalt binder. Paint parking lines and walkway (optional item).

Construct parking area as staked on the ground by the FS. Place 6" depth of #53 aggregate and place 3" depth of #9 asphalt binder. Paint parking lines (optional item).

Add material to gain width

Remove pipe across jct. Const ditch between lift station and spur.

Camping spur work shall consist of excavating spur to a depth of 8" to length and width shown. Backfill excavated area with 6" of compacted #53 aggregate. Pave spur with a 3" depth of #9 HMA. Place #73 aggregate along edge of asphalt sloping to drain.

Remove identified trees along with stump(s). Backfill and compact stump hole(s) with excavated spur material.

Raise grade at back of spur as staked

HRRA Paving Contract ORB-3027 - Bluegill Camping Loop

Spur # Width

(Feet) Length (Feet) Sq Ft.

Tree to remove Work Status

131 20 36 720 1 Base

87 20 50 1000 2 Base

88 20 43 860 Base

20 42 840 Base

20 47 940 1 Base

20 60 1200 5 Base

20 70 1400 Base

90 20 50 1000 1 Base

Totals 7960 10

Install 15" pipe across junction

Numerous small trees to be removed

Camping spur work shall consist of excavating spur to a depth of 8" to length and width shown. Backfill excavated area with 6" of compacted #53 aggregate. Pave spur with a 3" depth of #9 HMA. Place #73 aggregate along edge of asphalt sloping to drain.

Remove identified trees along with stump(s). Backfill and compact stump hole(s) with excavated spur material.

Raise grade at back of spur as staked

HRRA Paving Contract ORB-3027 - Southern Point Camping Loop

Spur # Width

(Feet) Length (Feet) Sq Ft.

Tree to remove Work Status

59 20 47 940 2 Base

44 20 42 840 Base

43 20 43 860 Base

20 37 740 Base

20 40 800 1 Base

Totals 4180 3

Reconstruct ditch left side of spur

Camping spur work shall consist of excavating spur to a depth of 8" to length and width shown. Backfill excavated area with 6" of compacted #53 aggregate. Pave spur with a 3" depth of #9 HMA. Place #73 aggregate along edge of asphalt sloping to drain.

Remove identified trees along with stump(s). Backfill and compact stump hole(s) with excavated spur material.

Need to excavate spur as staked to meet grade.

Raise grade as staked

Raise grade as staked