DBA WD IA110 07-24-2009.pdf
PDF 12 KB Posted
- Attached to
- Building 5 Install waste water pumping and piping system Federal contract opportunity
- Solicitation number
- ag-5114-S-09-AA07
About this file
Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 005.pdf | ||
| Attachment Package for Amend 004.pdf | ||
| SF 30 Amend 004.pdf | ||
| sf1442.pdf | ||
| Bid Bond sf24e.pdf | ||
| Bldg 5 Specifications.pdf | ||
| OF-17.pdf | ||
| Bldg 5 Drawings.pdf | ||
| Building 5 Solicitation.pdf | ||
| SF LLL 97.pdf | ||
| SF LLL 97.pdf | ||
| Bldg 5 Specifications.pdf | ||
| Bldg 5 Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: IA080110 07/24/2009 IA110
State: Iowa
Construction Type: Building
County: Story County in Iowa.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 11/21/2008 1 12/26/2008 2 03/20/2009 3 06/05/2009 4 06/19/2009 5 07/17/2009 6 07/24/2009
* BRIA0027-002 05/01/2009
Rates Fringes
BRICKLAYER.......................$ 25.64 8.17
CAULKER..........................$ 25.64 8.17
ELEC0347-006 06/01/2007
Rates Fringes
ELECTRICIAN......................$ 30.13 12.20
ENGI0234-016 05/01/2009
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 23.97 13.70
GROUP 2.....................$ 23.68 13.70
GROUP 3.....................$ 21.78 13.70
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 - Backhoes; Excavators GROUP 2 - Bulldozers; Forklift; Scraper GROUP 3 - Bobcat/Skid Loader; Grader/Blade; Loader; Rollers
IRON0067-007 05/01/2009
Rates Fringes
IRONWORKER
Ornamental, Reinforcing and Structural..............$ 23.81 14.64
LABO0177-001 05/01/2009
Rates Fringes
LABORER
Mason Tender-Brick..........$ 22.42 9.38
8/13/2009http://www.wdol.gov/wdol/scafiles/davisbacon/IA110.dvb
Mason Tender- Cement/Concrete.............$ 22.42 9.38 Pipelayer...................$ 22.42 9.38
PLUM0033-013 06/01/2008
Rates Fringes
PIPEFITTER, Including HVAC Pipe Installation................$ 30.15 15.35 PLUMBER, Excluding HVAC Pipe Installation.....................$ 30.15 15.35
PLUM0033-014 06/01/2008
Rates Fringes
PIPEFITTER (HVAC Pipe Installation Only)...............$ 30.15 15.35
ROOF0142-003 06/01/2008
Rates Fringes
ROOFER
Excluding Metal Roofs.......$ 21.67 8.82 Metal Roof Only.............$ 21.67 8.82
SHEE0045-009 06/01/2008
Rates Fringes
SHEETMETAL WORKER (Including HVAC Duct Installation)..........$ 29.17 12.82
SHEE0045-015 06/01/2008
Rates Fringes
SHEETMETAL WORKER (HVAC Duct Work Only).......................$ 29.17 12.82
SUIA2008-041 09/11/2008
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 12.79 0.00
CARPENTER, Including Drywall Hanging..........................$ 16.60 0.00
CEMENT MASON/CONCRETE FINISHER...$ 14.11 2.36
LABORER: Common or General......$ 11.70 0.00
LABORER: Irrigation & Landscape........................$ 8.98 0.00
OPERATOR: Crane.................$ 20.58 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION