Attachment Package for Amend 004.pdf
PDF 122 KB Posted
- Attached to
- Building 5 Install waste water pumping and piping system Federal contract opportunity
- Solicitation number
- ag-5114-S-09-AA07
About this file
Attachment Package for Amend 004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 005.pdf | ||
| SF 30 Amend 004.pdf | ||
| sf1442.pdf | ||
| Bid Bond sf24e.pdf | ||
| Bldg 5 Specifications.pdf | ||
| OF-17.pdf | ||
| DBA WD IA110 07-24-2009.pdf | ||
| SF LLL 97.pdf | ||
| Bldg 5 Drawings.pdf | ||
| Building 5 Solicitation.pdf | ||
| SF LLL 97.pdf | ||
| Bldg 5 Specifications.pdf | ||
| Bldg 5 Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multiple files are bound together in this PDF Package.
Adobe recommends using Adobe Reader or Adobe Acrobat version 8 or later to work with documents contained within a PDF Package. By updating to the latest version, you’ll enjoy the following benefits:
• Efficient, integrated PDF viewing
• Easy printing
• Quick searches
Don’t have the latest version of Adobe Reader?
Click here to download the latest version of Adobe Reader
If you already have Adobe Reader 8, click a file in this PDF Package to view it.
http://www.adobe.com/products/acrobat/readstep2.html file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm
General Decision Number: IA080110 08/28/2009 IA110
State: Iowa
Construction Type: Building
County: Story County in Iowa.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 11/21/2008 1 12/26/2008 2 03/20/2009 3 06/05/2009 4 06/19/2009 5 07/17/2009 6 07/24/2009 7 08/28/2009
BRIA0027-002 05/01/2009
Rates Fringes
BRICKLAYER.......................$ 25.64 8.17
CAULKER..........................$ 25.64 8.17
ELEC0347-006 06/01/2007
ELECTRICIAN......................$ 30.13 12.20
ENGI0234-016 05/01/2009
Power equipment operators:
GROUP 1.....................$ 23.97 13.70
GROUP 2.....................$ 23.68 13.70
file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (1 of 6) [9/1/2009 9:17:38 AM]
GROUP 3.....................$ 21.78 13.70
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1 - Backhoes; Excavators GROUP 2 - Bulldozers; Forklift; Scraper GROUP 3 - Bobcat/Skid Loader; Grader/Blade; Loader; Rollers
IRON0067-007 05/01/2009
IRONWORKER
Ornamental, Reinforcing and Structural..............$ 23.81 14.64
* LABO0177-001 05/01/2009
LABORER
Mason Tender-Brick..........$ 22.42 9.03 Mason Tender- Cement/Concrete.............$ 22.42 9.03 Pipelayer...................$ 22.42 9.03
PLUM0033-013 06/01/2008
PIPEFITTER, Including HVAC Pipe Installation................$ 30.15 15.35 PLUMBER, Excluding HVAC Pipe Installation.....................$ 30.15 15.35
PLUM0033-014 06/01/2008
PIPEFITTER (HVAC Pipe Installation Only)...............$ 30.15 15.35
ROOF0142-003 06/01/2008
file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (2 of 6) [9/1/2009 9:17:38 AM]
ROOFER
Excluding Metal Roofs.......$ 21.67 8.82 Metal Roof Only.............$ 21.67 8.82
SHEE0045-009 06/01/2008
SHEETMETAL WORKER (Including HVAC Duct Installation)..........$ 29.17 12.82
SHEE0045-015 06/01/2008
SHEETMETAL WORKER (HVAC Duct Work Only).......................$ 29.17 12.82
SUIA2008-041 09/11/2008
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 12.79 0.00
CARPENTER, Including Drywall Hanging..........................$ 16.60 0.00
CEMENT MASON/CONCRETE FINISHER...$ 14.11 2.36
LABORER: Common or General......$ 11.70 0.00
LABORER: Irrigation & Landscape........................$ 8.98 0.00
OPERATOR: Crane.................$ 20.58 0.00
WELDERS - Receive rate prescribed for craft performing file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (3 of 6) [9/1/2009 9:17:38 AM] operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (4 of 6) [9/1/2009 9:17:38 AM] response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (5 of 6) [9/1/2009 9:17:38 AM]
Administrative Review Board U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (6 of 6) [9/1/2009 9:17:39 AM]
Local Disk file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 1
0001 Aug 13, 2009
MWA Contracting Office 1815 N. University Peoria, IL 61604
See Block 6
AG-5114-S-09-AA07
Mar 4, 2009
Add SF LLL 97 to Bid Package
Rebecca A Holzinger
PAO\MWA\ARS\USDA
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
0002 Aug 13, 2009
Revise Bid Package to add all files as required Solicitation Drawings Specs Wage Determination Bid Bond
SF LLL
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
0003 Aug 27, 2009
Revise Bid Package to add SF 1442
File details come from the government source that posted it. Updated .