Attachment Package for Amend 004.pdf

PDF 122 KB Posted

Attached to
Building 5 Install waste water pumping and piping system Federal contract opportunity
Solicitation number
ag-5114-S-09-AA07
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

Attachment Package for Amend 004

View the file

Other files for this federal contract opportunity

Other files attached to Building 5 Install waste water pumping and piping system, newest first.
File Type Posted
SF 30 Amend 005.pdf PDF
SF 30 Amend 004.pdf PDF
sf1442.pdf PDF
Bid Bond sf24e.pdf PDF
Bldg 5 Specifications.pdf PDF
OF-17.pdf PDF
DBA WD IA110 07-24-2009.pdf PDF
SF LLL 97.pdf PDF
Bldg 5 Drawings.pdf PDF
Building 5 Solicitation.pdf PDF
SF LLL 97.pdf PDF
Bldg 5 Specifications.pdf PDF
Bldg 5 Drawings.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Multiple files are bound together in this PDF Package.

Adobe recommends using Adobe Reader or Adobe Acrobat version 8 or later to work with documents contained within a PDF Package. By updating to the latest version, you’ll enjoy the following benefits:

• Efficient, integrated PDF viewing

• Easy printing

• Quick searches

Don’t have the latest version of Adobe Reader?

Click here to download the latest version of Adobe Reader

If you already have Adobe Reader 8, click a file in this PDF Package to view it.

http://www.adobe.com/products/acrobat/readstep2.html file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm

General Decision Number: IA080110 08/28/2009 IA110

State: Iowa

Construction Type: Building

County: Story County in Iowa.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 11/21/2008 1 12/26/2008 2 03/20/2009 3 06/05/2009 4 06/19/2009 5 07/17/2009 6 07/24/2009 7 08/28/2009

BRIA0027-002 05/01/2009

Rates Fringes

BRICKLAYER.......................$ 25.64 8.17

CAULKER..........................$ 25.64 8.17

ELEC0347-006 06/01/2007

ELECTRICIAN......................$ 30.13 12.20

ENGI0234-016 05/01/2009

Power equipment operators:

GROUP 1.....................$ 23.97 13.70

GROUP 2.....................$ 23.68 13.70

file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (1 of 6) [9/1/2009 9:17:38 AM]

GROUP 3.....................$ 21.78 13.70

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Backhoes; Excavators GROUP 2 - Bulldozers; Forklift; Scraper GROUP 3 - Bobcat/Skid Loader; Grader/Blade; Loader; Rollers

IRON0067-007 05/01/2009

IRONWORKER

Ornamental, Reinforcing and Structural..............$ 23.81 14.64

* LABO0177-001 05/01/2009

LABORER

Mason Tender-Brick..........$ 22.42 9.03 Mason Tender- Cement/Concrete.............$ 22.42 9.03 Pipelayer...................$ 22.42 9.03

PLUM0033-013 06/01/2008

PIPEFITTER, Including HVAC Pipe Installation................$ 30.15 15.35 PLUMBER, Excluding HVAC Pipe Installation.....................$ 30.15 15.35

PLUM0033-014 06/01/2008

PIPEFITTER (HVAC Pipe Installation Only)...............$ 30.15 15.35

ROOF0142-003 06/01/2008

file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (2 of 6) [9/1/2009 9:17:38 AM]

ROOFER

Excluding Metal Roofs.......$ 21.67 8.82 Metal Roof Only.............$ 21.67 8.82

SHEE0045-009 06/01/2008

SHEETMETAL WORKER (Including HVAC Duct Installation)..........$ 29.17 12.82

SHEE0045-015 06/01/2008

SHEETMETAL WORKER (HVAC Duct Work Only).......................$ 29.17 12.82

SUIA2008-041 09/11/2008

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 12.79 0.00

CARPENTER, Including Drywall Hanging..........................$ 16.60 0.00

CEMENT MASON/CONCRETE FINISHER...$ 14.11 2.36

LABORER: Common or General......$ 11.70 0.00

LABORER: Irrigation & Landscape........................$ 8.98 0.00

OPERATOR: Crane.................$ 20.58 0.00

WELDERS - Receive rate prescribed for craft performing file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (3 of 6) [9/1/2009 9:17:38 AM] operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (4 of 6) [9/1/2009 9:17:38 AM] response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (5 of 6) [9/1/2009 9:17:38 AM]

Administrative Review Board U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm (6 of 6) [9/1/2009 9:17:39 AM]

Local Disk file:///C|/Documents%20and%20Settings/mark.volk/Desktop/IOWA%20DBA%2008-28-09.htm

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 1

0001 Aug 13, 2009

MWA Contracting Office 1815 N. University Peoria, IL 61604

See Block 6

AG-5114-S-09-AA07

Mar 4, 2009

Add SF LLL 97 to Bid Package

Rebecca A Holzinger

PAO\MWA\ARS\USDA

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

0002 Aug 13, 2009

Revise Bid Package to add all files as required Solicitation Drawings Specs Wage Determination Bid Bond

SF LLL

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

0003 Aug 27, 2009

Revise Bid Package to add SF 1442

File details come from the government source that posted it. Updated .