About this file
Task Order 1 Benton Falls Trail
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award Notice for FBO 4_10.docx | DOCX document | |
| sf-30 2 page.pdf | ||
| Task Order 3_Gee Creek Falls final.pdf | ||
| Amendment 2.pdf | ||
| Task Order 1_Conasauga Falls.pdf | ||
| Task Order 2_Sill Branch final.pdf | ||
| NOTICE posted FBO 2.12.10.docx | DOCX document | |
| Pre Bid Meeting Attendees.pdf | ||
| ARRA Trail mtce sf_30_amendment 1.doc | DOC document | |
| contract_bluehole map.pdf | ||
| contract_sill branch map.pdf | ||
| Trail Specs Customary Units_ July 05 1 .pdf | ||
| contract_benton falls map.pdf | ||
| AG-4756-S-10-0003.docx | DOCX document | |
| Special Project Specifications.docx | DOCX document | |
| Wage Determination 1998-0637.htm | HTM file | |
| Waterfall Trails_Map.pdf | ||
| Schedule of Items.docx | DOCX document | |
| Waterfall Trail Drawings_1_12_10.pdf | ||
| Task Order 2_Sill Branch.docx | DOCX document | |
| Task Order 3_Blue Hole.docx | DOCX document | |
| experience and business questionnaire.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order 1: Benton Falls Trail General Scope of Work:
Forest Trail 131, Benton Falls Trail, is located in the Cherokee National Forest, Ocoee Ranger District, Polk County, Tennessee. The Benton Falls Trail is comprised of two sections: the first section, which is approximately 1.5 miles, is designed and managed for mountain biking and hiking. The second section, where this work will be performed, is approximately 0.1 miles and is managed as a trail class 3, standard terra trail for hiker/pedestrian use only.
Design Parameters for a Trail Class 3 Hiker/Pedestrian Trail include:
· Design tread width = 24” to 36”
· Target cross slope = 5-10%
· Design surface = less than or equal to 3” maybe common, not continuous
· Design clearing = height 7’ to 8’ and width 18” to 30” uphill & downhill from trail center line
· Design turn = 3’ to 6’
Other Specifications:
· Treated round timbers with a minimum diameter of 8-inches shall be used for side cribbing as part of Item Number 933(03) as shown on drawing 933-3 to match character of existing side cribbing on the trail.
· Stairways shall be constructed uphill from the bottom beginning at a location to be staked near Rock Creek.
· Post and rail and mounted handrail shall be constructed after associated stairways have been constructed and approved by the CO.
Bid Item 1, Benton Falls Trail:
| Item Number |
| Description |
| Method of Measurement |
| Pay |
Unit
| Quantity |
| Unit Price |
| Total |
| 933(03) |
| Stairway, cribbed treated timber riser |
| AQ |
| SY |
| 250.0 |
| 933(04) |
| Rock masonry backfill |
| AQ |
| SY |
| 50.0 |
| 933(05) |
| Stairway, 8x8 treated timber |
| AQ |
| LF |
| 5.00 |
| 941(01) |
| Aggregate surfacing and backfill |
| AQ |
| TON |
| 2.0 |
| 953(04) |
| Post and Rail, round timber 36" to 48" high |
| AQ |
| LF |
| 100.0 |
| 953(05) |
| Mounted handrail, steel |
1-1/2" diameter
| AQ |
| LF |
| 100.0 |
Total, Bid Item 1: $__________________
Project Location:
See attached map. The commercially available National Geographic Trails Illustrated Map #781 also identifies Forest Trail 131, Benton Falls Trail, by both trail name and number.
The project is located approximately 15 miles east of Benton, Tennessee at the Chilhowee Recreation Area trailhead parking area on Forest Road 77 B. From the intersection of Highway 411 and 64, drive east on Highway 64 for approximately 7 miles, turning left onto FR 77. Follow FR 77 for 7 more miles to FR 77 B. Turn right onto FR 77 B and follow to Chilhowee Recreation Area trailhead parking area. Map of project attached.
Access to worksite:
Work to be accomplished will be approximately 1.5 miles from the trailhead, therefore, driving access to the worksite will be allowed. Equipment used for access to worksite, as well to maintain and construct trails, shall be sized appropriately so as not to damage to the trail and surroundings. Incidental damage caused to trails or any other natural or man-made feature shall be repaired and/or maintained to pre-existing condition.