sf-30 2 page.pdf

PDF 1 MB Posted

Attached to
Trail Maintenance, Cherokee National Forest
Solicitation number
AG-4756-S-10-0003
Issued by

About this file

Amendment 3 acknowledgement required.

View the file

Other files

File Type Posted
Award Notice for FBO 4_10.docx DOCX document
Task Order 3_Gee Creek Falls final.pdf PDF
Amendment 2.pdf PDF
Task Order 1_Conasauga Falls.pdf PDF
Task Order 2_Sill Branch final.pdf PDF
NOTICE posted FBO 2.12.10.docx DOCX document
Pre Bid Meeting Attendees.pdf PDF
ARRA Trail mtce sf_30_amendment 1.doc DOC document
contract_bluehole map.pdf PDF
contract_sill branch map.pdf PDF
Trail Specs Customary Units_ July 05 1 .pdf PDF
contract_benton falls map.pdf PDF
AG-4756-S-10-0003.docx DOCX document
Task Order 1__Benton Falls.docx DOCX document
Special Project Specifications.docx DOCX document
Wage Determination 1998-0637.htm HTM file
Waterfall Trails_Map.pdf PDF
Schedule of Items.docx DOCX document
Waterfall Trail Drawings_1_12_10.pdf PDF
Task Order 2_Sill Branch.docx DOCX document
Task Order 3_Blue Hole.docx DOCX document
experience and business questionnaire.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 1

2. AMENDMENT NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

3 2/24/2010

6. ISSUED BY:

USDA Forest Service Cherokee National Forest 2800 North Ocoee Street Cleveland, TN 37312

7. ADMINISTERED BY (If other than 6.):

8. NAME AND ADDRESS OF CONTRACTOR

[ x ]

9A. AMENDMENT OF SOLICITATION NUMBER

AG-4756-S-10-0003

Trail Maintenance, Cherokee NF

9B. DATED (see item 11)

1/15/2010

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

A. THIS CHANGE IS ISSUED PURSUANT TO:

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (specify type of modification and authority )

E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

RE: Task Order 1, Bid Item 1,Conasauga Falls Trail: Item 915(01) – change quantity from 2031 LF to 2579 LF.

Under Design Parameters, 1 st bullet, Design tread width – change 36” tread typical to 30” tread typical.

At 4 th bullet, Design clearing – add at end of sentence (typical – 36”)

Add attached photos to Task Order 3, Gee Creek Falls Trail.

Notes from site visit to Conasauga Falls Trail are attached.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

MARCIA O’CONNOR

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY: /s/ Marcia O’Connor 2/24/2010

(signature of authorized person) (signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

Solicitation AG-4756-S-10-0003

Site Visit, Conasauga Falls Trail

February 23, 2010 10:00 a.m.

Attending for Government: Nina Barrow, Contract Specialist; Doug Byerly, Landscape Architect; Matt

Henry, Recreation Planner Trainee; Leslie Smith, Tellico District Natural Resource Program Team Leader;

Greg Kirkland, Tellico District Trails Technician.

Contractors Attending: Roger Morgan, Tennessee Valley Construction; Doug Francis, PatRick Corp; Billy

Flowers, Carter Construction; Josh Reeves, J.E. Reeves Co.; Thomas W. Hooper; David Crosby, YRU

Contracting; Russell Harris, DBS Construction & Environmental Services; Darren and Tracy Caughron, Caughron and Company; Richard Stonecipher, CBS Contracting; Dave Brooks, WDB Contracting.

Group convened at Conasauga Falls trailhead. Byerly addressed spec. 915 for Trail Restoration 24”-36”.

If this is ordered, all facets of trail restoration may be included. If only one item is needed for a section of trail (for example, slough and berm removal), then only that item will be ordered.

The other two seed task orders are Gee Creek and Sill Branch Falls. Gee Creek includes both wilderness and non-wilderness items. Organized site visits are not scheduled for these trails; contractors may view on their own.

Question: Is brushing included in the item “Trail Restoration”? Answer – yes.

Henry said that Conasauga Falls trail work is divided into three sections. Upper section is primarily trail restoration work, majority being slough and berm removal, restoring tread and some clearing. Middle section, past the large rock obstruction, is rockier. Last 60’ of work requires installation of rock risers and rock stairways to access bottom of the falls to reroute a user-created trail.

Trail machines up to 36” wide are permitted on the trail. Henry does not think that machinery can be taken past the rock obstruction (see photo).

Item 915(01), Trail Restoration 24”-36” Tread, will change from 2031 LF to 2579 LF. Henry will calculate exact footage.

Group hiked in to first switchback. See trees in trail – will these be removed? Answer – no.

Government will flag any trees to be removed from the trail.

Group hiked to second switchback. Viewed two visitor-created shortcuts to be obliterated. Henry noted that group would see more root and rock removal as trail descends and enters laurel area.

Discussion of hazard trees – any tree that could fall onto the trail is a hazard tree. Government will flag any hazard trees to be removed.

Group hiked to rock barrier in the trail. Barrier is not to be removed. Specifications call for an 8 sq. yd.

rock retaining wall at this point.

Group hiked to falls. Will obliterate/close visitor-created trail and create new access to bottom of falls with rock risers and overlapping rock stairways. Acceptable range of dimensions for tread, rise and width of steps/stairway are noted on drawings 933-1, Stairway, Overlapping Rock, Pinned, and 933-0, Rock Stairways. Government has specified no more than a 2” variance in rise (for example, rise may be

6”/8”/10”, but not 5”/10”/3”). Material on site may be used if suitable. No rock may be harvested from stream. Any commercial source of rock must be approved by project COR. No mortar will be used.

Overlapping rock will be pinned according to drawing 933-1, Stairway, Overlapping Rock, Pinned. Work will begin at bottom of falls at location staked by Government and proceed up along flagged line.

Guardrail to be installed will use treated roundwood 8” posts and 6” rails from commercial source such as Tractor Supply.

Group returned to trailhead for final questions.

Question: what are the clearing limits for this trail? Answer – see drawing 911-1, Clearing Limits, for uphill and downhill dimensions. Clearing limits range is 12” – 48” uphill and downhill from centerline.

Typical is 36” uphill and downhill. Exact dimensions will be directed by CO in response to varying topography and vegetation types. See spec 911.02: clear to dimensions shown in drawings or 12” beyond the fill and backslope catch points.

Question on rock retaining wall at rock obstruction – is it pinned? Structure is offset and batter holds it in place. See Drawing 935-1, Rock Retaining Wall.

Note that final 60’ of trail includes three pay items: clearing and grubbing, stairway overlapping rock pinned, and stairway rock riser.

Question on tree removal – is this included in the specification for trail restoration? Answer – Logging out is included in trail restoration (as an incidental item). Danger tree removal is paid separately;

contractor will be paid for each tree ordered to be removed.

Question – how will post and rail guardrail be secured in the ground? See Drawing 953-4, Post and Rail.

Posts are to be installed in ground every 8’. May have to shift post location if ground is rocky.

Meeting adjourned at 12:00.

Question received after the meeting: Can horses be used as pack animals on any of these three seed task order trails? Answer: Pack stock is permitted on Conasauga Falls Trail and the Sill Branch Falls Trail.

Pack stock is not permitted on Gee Creek Trail.

Typical Gee Creek Stream crossing

Trail Restoration inside Gee Creek Wilderness.

Installation of Rock Culvert Inside Wilderness