About this file

Maps

View the file

Other files

File Type Posted
DBA_WD_St.Louis.pdf PDF
Schedule of Items.pdf PDF
DBA_WD_Lake.pdf PDF
Specifications.pdf PDF
SF 1442.pdf PDF
SF 1442 Cont_0624.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

B 495

495D

SC24

SC

1 2

3 2

11 11

33 34 35

35 3136

34 32

27 26

2628293026 2527 272828 292527 3026 25

171815 14 1616 13

15 14 13

18 141516 13

Crane Lake

Johnson Lake

Mukooda Lake

Vermilion River

Namakan Lake

Long Lake

Moose Lake

Marion Lake

Chub Lake

Silver Lake

Franklin Lake

Namakan Lake

Gannon Lake

Black Duck Lake

Rollick Creek

Bug Lake

Corner Lake

Bluebird Lake

Marion Creek

Johnson River

Pot Hole Lake

Dixon Creek

Elephant Lake

R17WR18WR19W

R19W R18W R17W

T68N

T68N

T67N T67N

T66N T66N

0 1 2 3 40.5 Miles

Project Area A

Johnson Lake Trail

Franklin Lake Trail

Marion Lake Trail

Long Lake Trail

Legend B Gravel Pit

Trails Roads Sheet

A2

(LaCroix Trails)

Franklin Lake

R.18W.R.18W.

R.18W.R.18W.

T.67N.

T.67N.

T.67N.

T.67N.

0 300 600150 Feet

Franklin Lake Trail

Legend

Trails Roads

0+00 POB

2+50 Begin Surfacing (8' Trail Width) (See Sheet C13)

3+00 Begin 6" Fill

4+00 End 6" Fill

5+30 End Surfacing

8+20 Begin Surfacing

8+50 Begin 6"Fill

9+10 Install French Drain (4LF) (See Sheet D17)

9+80 Replace CMP (17"x13"x16')

11+70 Install French Drain (4LF)

13+10 End 1' Fill

13+40 End Surfacing

15+00 Begin Surfacing

16+50 Begin 1' Fill

16+80 Install French Drain (4 LF) (See Sheet D17)

17+10 End 1' Fill

17+50 End Surfacing

21+00 Begin Surfacing Begin 1' Fill

21+30 Replace CMP (17"x13"x16')

24+70 Begin 6" Fill

29+00 End 6" Fill

29+50 End Surfacing

37+20 Begin Surfacing

37+40 Begin 1' Fill (Left Fill Slope) Begin RipRap (Left Slope)

38+40 End 1' Fill (Left Fill Slope) End RipRap (Left Slope) Begin 6" Fill

38+60 Begin Grid Paving (See Sheets C15, C16 & D18)

38+80 End 6" Fill Begin 1' Fill (Right Fill Slope) Remove and Salvage Concrete Pavers Begin RipRap (Right Slope)

40+40 POE (Lake)

40+20 End Surfacing

39+90 End Grid Paving End 1' Fill (Right Fill Slope) End RipRap (Right Slope)

Sheet A3

8+80 End 6" Fill Begin 1' Fill

10+10 End 1' Fill Begin 6" Fill

11+40 End 6" Fill Begin 1' Fill

21+60 End 1' Fill

39+00 BeginT-Turn & Parking Left (See Sheet D24)

(Project Area A)

39+11 End T-Turn & Parking Left

Johnson Lake

R.17W.

R.17W.

T.67N. T.67N.

0 200 400100 Feet

Johnson Lake Trail

Legend

Trails Roads

0+00 POB

0+10 Begin Sufacing (8' Trail Width) (See Sheet C13)

0+20 Begin 1' Fill

1+00 Begin Special Ditch Right (See Sheet D19)

1+60 Install French Drain (4 LF) (See Sheet D17)

2+20 Install French Drain (4 LF) (See Sheet D17)

3+00 End Special Ditch Right Begin Grid Paving w/Superelevation

3+70 End Grid Paving w/Superelevation

4+50 Begin Grid Paving (See Sheets C15, C16 & D18)

5+30 End Grid Paving Begin 6" Fill (w/geotextile) (See Sheet C14)

6+00 Install French Drain (8 LF) (See Sheet D17)

8+20 Install French Drain (4 LF) (See Sheet D17)

8+30 End 6" Fill (w/geotextile)

11+60 Begin 6" Fill (w/geotextile) (See Sheet C14)

11+70 Install French Drain (4 LF) (See Sheet D17)

13+40 Install French Drain (4 LF) (See Sheet D17)

14+40 Install French Drain (4 LF) (See Sheet D17)

15+00 Install French Drain (4 LF) (See Sheet D17)

15+20 End 6" Fill (w/geotextile)

18+80 Begin 6" Base T-turn (See Sheet D19) Begin Surfacing T-turn (See Sheet D19)

19+25 POE

19+20 End Surfacing

3+40 Remove and salvage concrete planks

12+20 Begin Parking Lot (Left) (See Sheet D20)

12+90 End Parking Lot (Left)

Sheet A4

Marion Lake

Long Lake

R.19W. R.18W. R.18W. R.18W.

R.18W.R.18W.R.19W.

T.67N. T.67N.

T.67N.T.67N.

T.67N.

0 1,000 2,000500 Feet

Long Lake Trail

Legend ! Stockpile

Trails Roads

96+60 Install CMP (17"x13"x18')

96+10 Begin 6" Fill

96+35 End 6" Fill Begin 1' Fill

96+85 End 1' Fill Begin 6" Fill

97+10 End 6" Fill

74+80 Install French Drain (8LF) (See Sheet D17)

74+30 Begin 6" Fill

74+55 End 6" Fill Begin 1' Fill

75+05 End 1' Fill Begin 6" Fill

75+30 End 6" Fill

106+70 Install French Drain (4 LF) (See Sheet D17)

106+20 Begin 6" Fill (See Sheet C14)

106+45 End 6" Fill Begin 1' Fill

106+95 End 1' Fill Begin 6" Fill

107+20 End 6" Fill

96+00 Begin 8' Trail Width Begin Surfacing

115+00 End Grid Paving

114+00 Begin Grid Paving (See Sheets C15, C16 & D18)

127+90 Begin Re-Route Begin 6" Fill

129+50 End 6" Fill End Re-Route

132+70 Begin Re-Route

135+50 End Re-Route

143+60 Begin Grid Paving (See Sheets C15, C16 & D18)

144+20 End Grid Paving

144+50 Begin Grid Paving (See Sheets C15, C16 & D18)

146+50 End Grid Paving Begin 1' Fill

158+50 Begin Parking Lot (Right) (See Sheet D23)

158+98 End Parking Lot (Right) End Surfacing

POE

0+00 POB (10' Trail Width)

0+10 Begin Parking Lot (Left & Right) (See Sheet D22))

1+10 End Parking (Left & Right)

Sheet A5

106+00 Begin Geotextile

128+10 Begin 1' Fill

128+40 Replace CMP (17"x13"x18')

128+70 End 1' Fill Begin 6" Fill

147+00 Install French Drain (4 LF) (See Sheet D17)

147+50 End 1' Fill

107+40 End Geotextile

494A

Marion Lake

R.18W. R.18W.

R.18W.R.18W.

T.67N.

T.67N.

T.67N.

T.67N.

0 500 1,000250 Feet

Marion Lake Trail

±Legend Carry Down Trails Roads

0+50 Begin Surfacing (10' Trail Width)

0+75 Begin V-Ditch Left (See Sheet C13)

1+50 Begin Transition to Out Slope Left

1+65 Begin Full Out Slope Left

3+00 End V-Ditch Left

3+05 End Transition Out Slope Left

3+15 End Surfacing

0+00 POB

14+50 Begin Surfacing

14+85 Begin V-Ditch Left

15+00 Begin Transition to Out Slope Left

15+15 Begin Full Out Slope Left

18+90 Install CMP (17"x13"x18')

19+80 End V-Ditch Left End Full Out Slope Left

19+95 End Transition From Out Slope Left

20+61 Begin 1' Fill (w/geotextile) (See Sheet C14)

21+70 Install French Drain (10 LF) (See Sheet D17)

24+40 End 1' Fill (w/geotextile)

25+00 End Surfacing

2+90 End Full Out Slope Left

18+40 Begin 6" Fill

18+65 End 6" Fill & Begin 1' Fill

19+15 End 1' Fill Begin 6" Fill

19+40 End 6" Fill

26+00 Begin Spot Fills (8-10 locations, 100CY Borrow) Begin Spot Surfacing (50CY)

45+80 End Spot Fills End Spot Surfacing

46+00 Begin Parking Lot (See Sheet D25)

Sheet A6

46+48 End Parking Lot

54+48 End Spot Fills End Spot Surfacing

POE

46+48 Begin 6' Trtail Width Begin Surfacing Begin Spot Fills (4-5 Locations, 50CY Base)

SC

US53

MN

SC65

SC461

SC68

SC405

257D

SC

SC65

US

US

257SC65 SC65

MN

SC65

SC405

3 2

8 9

24 3 6

2 1

6 5 4 3 2 1 6

18 17

17 16

131416

24 19

34 35

35 36

32 33

3134 3634 3532 3331

363331 3235 36 35

22 19

1920 21 22 2423

Sand Lake

Lake Fourteen

Dark Lake

Lake Leander

Clear Lake

Sandy Lake

Arrowhead Lake

Little Sand Lake

Little Sandy Lake

Moose Lake

Lake Little Fourteen

Knuckey Lake Rat Lake

Mulden Lake

Water Cress Lake

Jutila Lake

Jammer Lake

Beaver Lake

Deepwater Lake Lost Man Lake

Gate Lake

Camp Four Lake

Wheel Lake

Candle Lake

Minnow Lake

Moska Lake

Spring Lake

Severson Lake

Belmont Lake

Tremblon Lake

New Richmond Lake

Horseshoe Lake

Jean Lake

Little Jammer Lake

R20W R19W R18W R17W

R18W R17WR20W R19W

T61N T61N

T60N T60N

T59N T59N

0 1 2 3 40.5 Miles

(Laurentian Trails)

Legend

Roads Trails

Deep Water Trail

Big Aspen Trail System

Project Area B

Sheet A7

!j

!j

!0

!0

C

US53

SC65

SC405

257D

US53

US53

¬«4

¬«5

¬«6

¬«1

¬«3 ¬«2

¬«9

¬«8

¬«7

¬«21 ¬«20

¬«13

¬«19

¬«22

¬«23

¬«17

¬«18

¬«10

¬«25

¬«26

¬«28 ¬«27 ¬«24 ¬«16 ¬«11

¬«12

¬«14

¬«15

9 7 81110

22 23 24

16 18

1921 20

23 614

2628 30 29

Arrowhead Lake

Minnow Lake

R18W

R18W

R17W

R17W

T60N T60N

0 1,800 3,600900 Feet

Big Aspen Trail System

Legend ( Intersection !0 Shelter !j Parking

Roads Trails

83+00 Replace Gate (See Sheet D27)

82+00 Replace Gate (See Sheet D27)

87+00 End Surfacing (Gate) Replace Gate (See Sheet D27)

8+50 Replace Gate (See Sheet D27)

2+00 Begin Reroute Begin 6" Base (10' Trail Width) Begin Surfacing

8+00 Begin Grid Paving (See Sheets C15, C16 & D18)

30+50 Begin Grid Paving (See Sheets C15, C16, D18)

13+80 Begin Grid Paving (See Sheet C15, C16 & D18)

10+00 Begin Grid Paving (See Sheets C15, C16 & D18)

15+00 Begin Grid Paving

0+00 POB (Intersection #1 Thru #3) Begin Surfacing (10' Trail Width) (See Sheet C13)

13+70 Begin Grid Paving (See Sheets C15, C16 & D18)

1+50 Begin Grid Paving (See Sheets C15, C16 & D18)

91+00 Begin Spot Surfacing (50CY)

Sheet A8

22+00 (Intersection #2)

24+70 (Intersection #3)

40+50 End Surfacing (Intersection #1)

1+75 End Grid Paving

14+10 End Grid Paving Begin 6" Fill (10' Trail Width) Begin Surfacing (10' Trail Width)

0+00 POB (Intersection #1 Thru #8)

40+25 End 6" Fill (Intersection #8) End Surfacing (Intersection #8)

0+00 POB (Intersection #13 Thru #7 to Gate) Begin Surfacing (10' Trail Width)

64+00 Intersection #7

0+00 POB (Intersection #14 to #15)

26+00 Intersection #11

0+00 POB (Intersection #10 to #11)

17+00 End Grid Paving

11+00 End Grid Paving

15+20 End Grid Paving

17+30 Intersection #15

0+00 POB (Intersection #21 to #22)

3+50 End 6" Base & Surfacing End Reroute

0+00 POB (Intersection #21 Thru #28)

8+00 FR 257

82+50 FR 257

85+50 Intersection #28

91+50 End Spot Surfacing

0+00 POB (Intersection #24 Thru #25)

10+70 End Grid Paving

30+00 Intersection #25 32+00 End Grid Paving

(Project Area B)

0+00 POB

12+45 Install CMPs (2-57"x38"x24')

124+80 POE

11+90 Begin Surfacing

12+00 Begin 6" Fill

12+20 Begin 1' Fill

12+70 End 1' Fill Begin 6" Fill

12+90 End 6" Fill End Surfacing

MN

3534 36

Deepwater Lake

R20W

R20W

T60N T60N

T59N T59N

0 800 1,600400 Feet

Deep Water Trail

Legend

Roads Trails

Sheet A9

18+75 Install French Drain (4 LF) (See Sheet D17) Spot Surfacing (5 CY) Spot Fill (5 CY)

24+40 Install French Drain (4 LF) ( See Sheet D17) Spot Surfacing (5 CY) Spot Fill (5 CY)

83+10 Spot Surfacing (20 CY) Spot Fills 20 CY

(Project Area B)

MN1

SC21

LC

LC2

SC623

SC

LC

SC81

LC

SC70

LC703

177D

99 8

4 1

35 3

4 35

18 17

20 22

29 25

14 13

21 21

34 36

282829

4 3

20 2119 222221 23 2420 19 21 22 2320 24 23

1234561

Birch Lake

Bald Eagle Lake

South Kawishiwi River

Johnson Lake

Slate LakeStony River

One Pine Lake

August Lake

North McDougal Lake

Quadga Lake

Stony Lake

Shallow Lake

Lake Gegoka

Stony River

Harris Lake

Grouse Lake

Wampus Lake

White Iron Lake

Gander Lake

Perch Lake

Blueberry Lake

Argo Lake Pike Lake

Dragon Lake

West Chub Lake

Little Lake

Gabbro Lake

Stony River

Bear Island River

Dunnigan Lake

Bogberry Lake

Cat Lake

Chow Lake

East Chub Lake

Shamrock Lake

Flat Horn Lake

Heart Lake

Denley Lake

Middle McDougal Lake

Campers Lake

Gull Lake

Whisper Lake

Pangi Lake

Wadop Lake

Baird Lake

Two Deer Lake

Omaday Lake

Iron Lake Pitcha Lake

Ova Lake

Planted Lake

Phospor Lake

Inga Lake

Beetle Lake

Grass Lake

Tonic Lake

Fran Lake

Nickel Lake Superstition Lake

Bearskin Lake

Kangas Lake

Alsike Lake

Canary Lake

John Lake

Myth Lake

Fishfry Lake

Sun Lake

Highlife Lake

Gunsten Lake

Gypsy Lake

Luster Lake

Pear Lake

Norway Lake

Little Wampus Lake

Moccasin Lake

Jackpot Lake

Gesend Pond

Eikela Lake

Tony Lake

Pearl Lake

Campfire Lake

Little Bear Lake

Peanut Lake

Exploit Lake

Steamhaul Lake

Sphagnum Lake

Starling Lake

Minnow Lake

Little Spring Lake

Bandana Lake

Mayfly Lake

Labrador Pond

Bubbles Lake

Teamster Lake

Dime Lake

T62NR10W T62NR9WT62NR11WT62NR12WT62NR13W

T60NR12WT60NR13W T59NR9WT59NR10WT59NR11W

R9W R13W

R9W

R13W

R9W

R13W

R9W

0 1.5 30.75 Miles

Project Area C

Legend BWCAW Boundary Stony Spur Trail Tomahawk Trail Main Roads

Sheet A10

(Kawishiwi Trails)

7 9

3 12

4 5

1 5

18 17

26 2529

262730 29 2825

5 4 3 2 51 6 42

MN1

SC623

SC21

SC81

LC2

SC70

Birch Lake

Slate Lake Stony River

August Lake Harris Lake

Perch Lake

Iron Lake

Argo Lake West Chub Lake

Little Lake

Blueberry Lake

Stony River

Dunnigan Lake

Bear Island River

Chow Lake

East Chub Lake

Shamrock Lake

Heart Lake

Denley Lake

Whisper Lake

Baird Lake

Pitcha Lake

Fran Lake

South Kawishiwi River

Stony River

Kangas Lake

Sun Lake

Highlife Lake

Gypsy Lake

Canary Lake

Pear Lake

Jackpot Lake

Tony Lake

Pearl Lake

Peanut Lake

Leatherleaf Lake

Minnow Lake

Little Spring Lake

Labrador Pond

Hanson Lake

T61NR10WT61NR11WT61NR12WT61NR13W

T60NR10WT60NR11WT60NR12WT60NR13W

R10W

R13W

R10W

R13W

Legend Stony Spur Trail Main Roads

0 1 20.5 Miles

Stony Spur Trail

MP 0.16 - Begin Surfacing Begin 6" Fill (Base) Begin Cuts & Fills (See Sheets C14 & D25)

MP 0.00 - POB Intersection SC623 (12' Trail Width)

MP 8.50 - Begin Swamp Crossing w/Geoweb (See Sheet C16) Begin 6" Fill (Base) Begin Surfacing

MP 10.36 - Begin Spot Surfacing (356 CY) Begin Spot Fills (356CY)

MP 11.00 - End Spot Fills (356CY) End Spot Surfacing (356CY)

MP 16.93 - Begin Swamp Crossing w/Geoweb (See Sheet C16) Begin 6" Fill (Base) Begin Surfacing

MP 17.11 - Begin Surfacing Begin 6" Fill (Base) Begin Cuts & Fills (See Sheets C14 & D25)

Sheet A11

(Project Area C)

MP 0.18 - Install CMPs (2-28"x20"x28')

MP 0.19 - End Cuts & Fills (See Sheet C14 & D25) End 6" Fill (Base) End Surfacing

MP 8.56 - End Swamp Crossing w/Geoweb (350LF) End 6" Fill (Base) End Surfacing

MP 16.98 - End Swamp Crossing w/Geoweb (225 LF) End 6" Fill (Base) End Surfacing

MP 17.16 End Cuts & Fills (See Sheet C14 & D25)

MP 17.18 - End 6" Fill (Base) End Surfacing

POE

29377

377I

R9W

R9W

R10W

R10W

T61NT61N

Legend Roads Tomahawk Trail0 600 1,200300

Feet

Tomahawk Trail

Sheet A12

MP 0.91 - End 6" Fill w/Geotextile (600LF As Staked) End Surfacing (600LF As Staked)

POE

MP 0.70 - Begin 6" Fills w/Geotextile (12' Trail Width)(See Sheet C15) Begin Surfacing (600 LF As Staked)

(Project Area C)

0.00 POB (Intersection FR 381)

DESIGN:___________________________

DRAWN:____________________________

CHECKED:___________________________

DATE: ___________________________R9

WEST ZONE

SUPERIOR NATIONAL FOREST

FOREST SERVICE

MARION

MARION ATV TRAILS

SUPERIOR NATIONAL FORESTS

1+50 TO 3+00

TRAIL SECTIONS

E x is ti n g C e n te rl in e

E x is ti n g C e n te rl in e

E x is ti n g C e n te rl in e

L-Stn: 1+50 Grd.Nxt. 3.3%

1+50

0 5 1

L-Stn: 2+00 Grd.Nxt. 0.2%

2+00

0 5 1

L-Stn: 2+50 Grd.Nxt. 4.2%

2+50

0 5 1

L-Stn: 3+00 Grd.Nxt. 3.8%

3+00

0 5 1

D 28

Sheet:

CIM-0909-11T-469-0909-01

Project No:

TO

DRAWN:____________________________

CHECKED:___________________________

DATE: ___________________________R9

WEST ZONE

SUPERIOR NATIONAL FOREST

FOREST SERVICE

MARION

MARION ATV TRAILS

SUPERIOR NATIONAL FORESTS

19+8015+00

L-Stn: 15+00 Grd.Nxt. -11

15+00

0 5 1

L-Stn: 15+50 Grd.Nxt. -7

15+50

0 5 1

L-Stn: 16+00 Grd.Nxt. -6

16+00

0 5 1

L-Stn: 16+50 Grd.Nxt. -7

16+50

0 5 1

L-Stn: 17+00 Grd.Nxt. -1

17+00

0 5 1

L-Stn: 17+50 Grd.Nxt. -2

17+50

0 5 1

L-Stn: 18+50 Grd.Nxt. -2

18+50

0 5 1

L-Stn: 19+00 Grd.Nxt. 2

19+00

0 5 1

L-Stn: 19+80 Grd.Nxt. -2

19+80

0 5 1

TRAIL SECTIONS

CIM-0909-11T-469-0909-01

Project No:

D 29

Sheet:

DRAWN:____________________________

CHECKED:___________________________

DATE: ___________________________R9

WEST ZONE

SUPERIOR NATIONAL FOREST

FOREST SERVICE

MARION

MARION ATV TRAILS

SUPERIOR NATIONAL FORESTS

24+4021+00

L-Stn: 21+00 Grd.Nxt. -2

21+00

0 5 1

L-Stn: 21+50 Grd.Nxt. -1

21+50

0 5 1

L-Stn: 22+00 Grd.Nxt. 1

22+00

0 5 1

L-Stn: 22+50 Grd.Nxt. 1

22+50

0 5 1

L-Stn: 23+00 Grd.Nxt. 4

23+00

0 5 1

L-Stn: 23+50 Grd.Nxt. 3

23+50

0 5 1

L-Stn: 24+00 Grd.Nxt. 5

24+00

0 5 1

L-Stn: 24+40 Grd.Nxt. 5

24+40

0 5 1

TRAIL SECTIONS

D 30

Sheet:

CIM-0909-11T-469-0909-01

Project No:

DRAWN:____________________________

CHECKED:___________________________

DATE: ___________________________R9

WEST ZONE

SUPERIOR NATIONAL FOREST

FOREST SERVICE

2+30

STONEY M.P. 0.19

STONEY ATV TRAILS

SUPERIOR NATIONAL FOREST

0+50

2 - 28"x20"x28' CMP

E x is ti n g C e n te rl in e

E x is ti n g C e n te rl in e

E x is ti n g C e n te rl in e

L-Stn: 0+50 Grd.Nxt. -1

0+50

0 5 1

L-Stn: 0+81 Grd.Nxt. 0

0+81

0 5 1

L-Stn: 1+00 Grd.Nxt. 0

1+00

0 5 1

L-Stn: 1+50 Grd.Nxt. 1

1+50

0 5 1

L-Stn: 2+00 Grd.Nxt. 1

2+00

0 5 1

L-Stn: 2+30 Grd.Nxt. 2

2+30

0 5 1

TRAIL SECTIONS

CIM-0909-11T-469-0909-01

Project No:

D 31

DRAWN:____________________________

CHECKED:___________________________

DATE: ___________________________R9

13+50 14+70

WEST ZONE

SUPERIOR NATIONAL FOREST

FOREST SERVICE

Stoney M.P. 17.11

STONEY ATV TRAILS

SUPERIOR NATIONAL FOREST

L-Stn: 13+50 Grd.Nxt. 10

BRIDGE 13+50

0 5 1

L-Stn: 13+80 Grd.Nxt. 18

13+80

0 5 1 0 85

L-Stn: 14+00 Grd.Nxt. 10

14+00

0 5 1

L-Stn: 14+20 Grd.Nxt. -1

14+20

0 5 1

L-Stn: 14+40 Grd.Nxt. -12

14+40

0 5 1

L-Stn: 14+60 Grd.Nxt. -13

14+60

0 5 1

L-Stn: 14+70 Grd.Nxt. -14

BRIDGE 14+70

0 5 1

TRAIL SECTIONS

CIM-0909-11T-469-0909-01

Project No:

D 32

File details come from the government source that posted it. Updated .