B
B 495
495D
SC24
SC
1 2
3 2
11 11
33 34 35
35 3136
34 32
27 26
2628293026 2527 272828 292527 3026 25
171815 14 1616 13
15 14 13
18 141516 13
Crane Lake
Johnson Lake
Mukooda Lake
Vermilion River
Namakan Lake
Long Lake
Moose Lake
Marion Lake
Chub Lake
Silver Lake
Franklin Lake
Namakan Lake
Gannon Lake
Black Duck Lake
Rollick Creek
Bug Lake
Corner Lake
Bluebird Lake
Marion Creek
Johnson River
Pot Hole Lake
Dixon Creek
Elephant Lake
R17WR18WR19W
R19W R18W R17W
T68N
T68N
T67N T67N
T66N T66N
0 1 2 3 40.5 Miles
Project Area A
Johnson Lake Trail
Franklin Lake Trail
Marion Lake Trail
Long Lake Trail
Legend B Gravel Pit
Trails Roads Sheet
A2
(LaCroix Trails)
Franklin Lake
R.18W.R.18W.
R.18W.R.18W.
T.67N.
T.67N.
T.67N.
T.67N.
0 300 600150 Feet
Franklin Lake Trail
Legend
Trails Roads
0+00 POB
2+50 Begin Surfacing (8' Trail Width) (See Sheet C13)
3+00 Begin 6" Fill
4+00 End 6" Fill
5+30 End Surfacing
8+20 Begin Surfacing
8+50 Begin 6"Fill
9+10 Install French Drain (4LF) (See Sheet D17)
9+80 Replace CMP (17"x13"x16')
11+70 Install French Drain (4LF)
13+10 End 1' Fill
13+40 End Surfacing
15+00 Begin Surfacing
16+50 Begin 1' Fill
16+80 Install French Drain (4 LF) (See Sheet D17)
17+10 End 1' Fill
17+50 End Surfacing
21+00 Begin Surfacing Begin 1' Fill
21+30 Replace CMP (17"x13"x16')
24+70 Begin 6" Fill
29+00 End 6" Fill
29+50 End Surfacing
37+20 Begin Surfacing
37+40 Begin 1' Fill (Left Fill Slope) Begin RipRap (Left Slope)
38+40 End 1' Fill (Left Fill Slope) End RipRap (Left Slope) Begin 6" Fill
38+60 Begin Grid Paving (See Sheets C15, C16 & D18)
38+80 End 6" Fill Begin 1' Fill (Right Fill Slope) Remove and Salvage Concrete Pavers Begin RipRap (Right Slope)
40+40 POE (Lake)
40+20 End Surfacing
39+90 End Grid Paving End 1' Fill (Right Fill Slope) End RipRap (Right Slope)
Sheet A3
8+80 End 6" Fill Begin 1' Fill
10+10 End 1' Fill Begin 6" Fill
11+40 End 6" Fill Begin 1' Fill
21+60 End 1' Fill
39+00 BeginT-Turn & Parking Left (See Sheet D24)
(Project Area A)
39+11 End T-Turn & Parking Left
Johnson Lake
R.17W.
R.17W.
T.67N. T.67N.
0 200 400100 Feet
Johnson Lake Trail
Legend
Trails Roads
0+00 POB
0+10 Begin Sufacing (8' Trail Width) (See Sheet C13)
0+20 Begin 1' Fill
1+00 Begin Special Ditch Right (See Sheet D19)
1+60 Install French Drain (4 LF) (See Sheet D17)
2+20 Install French Drain (4 LF) (See Sheet D17)
3+00 End Special Ditch Right Begin Grid Paving w/Superelevation
3+70 End Grid Paving w/Superelevation
4+50 Begin Grid Paving (See Sheets C15, C16 & D18)
5+30 End Grid Paving Begin 6" Fill (w/geotextile) (See Sheet C14)
6+00 Install French Drain (8 LF) (See Sheet D17)
8+20 Install French Drain (4 LF) (See Sheet D17)
8+30 End 6" Fill (w/geotextile)
11+60 Begin 6" Fill (w/geotextile) (See Sheet C14)
11+70 Install French Drain (4 LF) (See Sheet D17)
13+40 Install French Drain (4 LF) (See Sheet D17)
14+40 Install French Drain (4 LF) (See Sheet D17)
15+00 Install French Drain (4 LF) (See Sheet D17)
15+20 End 6" Fill (w/geotextile)
18+80 Begin 6" Base T-turn (See Sheet D19) Begin Surfacing T-turn (See Sheet D19)
19+25 POE
19+20 End Surfacing
3+40 Remove and salvage concrete planks
12+20 Begin Parking Lot (Left) (See Sheet D20)
12+90 End Parking Lot (Left)
Sheet A4
Marion Lake
Long Lake
R.19W. R.18W. R.18W. R.18W.
R.18W.R.18W.R.19W.
T.67N. T.67N.
T.67N.T.67N.
T.67N.
0 1,000 2,000500 Feet
Long Lake Trail
Legend ! Stockpile
Trails Roads
96+60 Install CMP (17"x13"x18')
96+10 Begin 6" Fill
96+35 End 6" Fill Begin 1' Fill
96+85 End 1' Fill Begin 6" Fill
97+10 End 6" Fill
74+80 Install French Drain (8LF) (See Sheet D17)
74+30 Begin 6" Fill
74+55 End 6" Fill Begin 1' Fill
75+05 End 1' Fill Begin 6" Fill
75+30 End 6" Fill
106+70 Install French Drain (4 LF) (See Sheet D17)
106+20 Begin 6" Fill (See Sheet C14)
106+45 End 6" Fill Begin 1' Fill
106+95 End 1' Fill Begin 6" Fill
107+20 End 6" Fill
96+00 Begin 8' Trail Width Begin Surfacing
115+00 End Grid Paving
114+00 Begin Grid Paving (See Sheets C15, C16 & D18)
127+90 Begin Re-Route Begin 6" Fill
129+50 End 6" Fill End Re-Route
132+70 Begin Re-Route
135+50 End Re-Route
143+60 Begin Grid Paving (See Sheets C15, C16 & D18)
144+20 End Grid Paving
144+50 Begin Grid Paving (See Sheets C15, C16 & D18)
146+50 End Grid Paving Begin 1' Fill
158+50 Begin Parking Lot (Right) (See Sheet D23)
158+98 End Parking Lot (Right) End Surfacing
POE
0+00 POB (10' Trail Width)
0+10 Begin Parking Lot (Left & Right) (See Sheet D22))
1+10 End Parking (Left & Right)
Sheet A5
106+00 Begin Geotextile
128+10 Begin 1' Fill
128+40 Replace CMP (17"x13"x18')
128+70 End 1' Fill Begin 6" Fill
147+00 Install French Drain (4 LF) (See Sheet D17)
147+50 End 1' Fill
107+40 End Geotextile
494A
Marion Lake
R.18W. R.18W.
R.18W.R.18W.
T.67N.
T.67N.
T.67N.
T.67N.
0 500 1,000250 Feet
Marion Lake Trail
±Legend Carry Down Trails Roads
0+50 Begin Surfacing (10' Trail Width)
0+75 Begin V-Ditch Left (See Sheet C13)
1+50 Begin Transition to Out Slope Left
1+65 Begin Full Out Slope Left
3+00 End V-Ditch Left
3+05 End Transition Out Slope Left
3+15 End Surfacing
0+00 POB
14+50 Begin Surfacing
14+85 Begin V-Ditch Left
15+00 Begin Transition to Out Slope Left
15+15 Begin Full Out Slope Left
18+90 Install CMP (17"x13"x18')
19+80 End V-Ditch Left End Full Out Slope Left
19+95 End Transition From Out Slope Left
20+61 Begin 1' Fill (w/geotextile) (See Sheet C14)
21+70 Install French Drain (10 LF) (See Sheet D17)
24+40 End 1' Fill (w/geotextile)
25+00 End Surfacing
2+90 End Full Out Slope Left
18+40 Begin 6" Fill
18+65 End 6" Fill & Begin 1' Fill
19+15 End 1' Fill Begin 6" Fill
19+40 End 6" Fill
26+00 Begin Spot Fills (8-10 locations, 100CY Borrow) Begin Spot Surfacing (50CY)
45+80 End Spot Fills End Spot Surfacing
46+00 Begin Parking Lot (See Sheet D25)
Sheet A6
46+48 End Parking Lot
54+48 End Spot Fills End Spot Surfacing
POE
46+48 Begin 6' Trtail Width Begin Surfacing Begin Spot Fills (4-5 Locations, 50CY Base)
SC
US53
MN
SC65
SC461
SC68
SC405
257D
SC
SC65
US
US
257SC65 SC65
MN
SC65
SC405
3 2
8 9
24 3 6
2 1
6 5 4 3 2 1 6
18 17
17 16
131416
24 19
34 35
35 36
32 33
3134 3634 3532 3331
363331 3235 36 35
22 19
1920 21 22 2423
Sand Lake
Lake Fourteen
Dark Lake
Lake Leander
Clear Lake
Sandy Lake
Arrowhead Lake
Little Sand Lake
Little Sandy Lake
Moose Lake
Lake Little Fourteen
Knuckey Lake Rat Lake
Mulden Lake
Water Cress Lake
Jutila Lake
Jammer Lake
Beaver Lake
Deepwater Lake Lost Man Lake
Gate Lake
Camp Four Lake
Wheel Lake
Candle Lake
Minnow Lake
Moska Lake
Spring Lake
Severson Lake
Belmont Lake
Tremblon Lake
New Richmond Lake
Horseshoe Lake
Jean Lake
Little Jammer Lake
R20W R19W R18W R17W
R18W R17WR20W R19W
T61N T61N
T60N T60N
T59N T59N
0 1 2 3 40.5 Miles
(Laurentian Trails)
Legend
Roads Trails
Deep Water Trail
Big Aspen Trail System
Project Area B
Sheet A7
!j
!j
!0
!0
C
US53
SC65
SC405
257D
US53
US53
¬«4
¬«5
¬«6
¬«1
¬«3 ¬«2
¬«9
¬«8
¬«7
¬«21 ¬«20
¬«13
¬«19
¬«22
¬«23
¬«17
¬«18
¬«10
¬«25
¬«26
¬«28 ¬«27 ¬«24 ¬«16 ¬«11
¬«12
¬«14
¬«15
9 7 81110
22 23 24
16 18
1921 20
23 614
2628 30 29
Arrowhead Lake
Minnow Lake
R18W
R18W
R17W
R17W
T60N T60N
0 1,800 3,600900 Feet
Big Aspen Trail System
Legend ( Intersection !0 Shelter !j Parking
Roads Trails
83+00 Replace Gate (See Sheet D27)
82+00 Replace Gate (See Sheet D27)
87+00 End Surfacing (Gate) Replace Gate (See Sheet D27)
8+50 Replace Gate (See Sheet D27)
2+00 Begin Reroute Begin 6" Base (10' Trail Width) Begin Surfacing
8+00 Begin Grid Paving (See Sheets C15, C16 & D18)
30+50 Begin Grid Paving (See Sheets C15, C16, D18)
13+80 Begin Grid Paving (See Sheet C15, C16 & D18)
10+00 Begin Grid Paving (See Sheets C15, C16 & D18)
15+00 Begin Grid Paving
0+00 POB (Intersection #1 Thru #3) Begin Surfacing (10' Trail Width) (See Sheet C13)
13+70 Begin Grid Paving (See Sheets C15, C16 & D18)
1+50 Begin Grid Paving (See Sheets C15, C16 & D18)
91+00 Begin Spot Surfacing (50CY)
Sheet A8
22+00 (Intersection #2)
24+70 (Intersection #3)
40+50 End Surfacing (Intersection #1)
1+75 End Grid Paving
14+10 End Grid Paving Begin 6" Fill (10' Trail Width) Begin Surfacing (10' Trail Width)
0+00 POB (Intersection #1 Thru #8)
40+25 End 6" Fill (Intersection #8) End Surfacing (Intersection #8)
0+00 POB (Intersection #13 Thru #7 to Gate) Begin Surfacing (10' Trail Width)
64+00 Intersection #7
0+00 POB (Intersection #14 to #15)
26+00 Intersection #11
0+00 POB (Intersection #10 to #11)
17+00 End Grid Paving
11+00 End Grid Paving
15+20 End Grid Paving
17+30 Intersection #15
0+00 POB (Intersection #21 to #22)
3+50 End 6" Base & Surfacing End Reroute
0+00 POB (Intersection #21 Thru #28)
8+00 FR 257
82+50 FR 257
85+50 Intersection #28
91+50 End Spot Surfacing
0+00 POB (Intersection #24 Thru #25)
10+70 End Grid Paving
30+00 Intersection #25 32+00 End Grid Paving
(Project Area B)
0+00 POB
12+45 Install CMPs (2-57"x38"x24')
124+80 POE
11+90 Begin Surfacing
12+00 Begin 6" Fill
12+20 Begin 1' Fill
12+70 End 1' Fill Begin 6" Fill
12+90 End 6" Fill End Surfacing
MN
3534 36
Deepwater Lake
R20W
R20W
T60N T60N
T59N T59N
0 800 1,600400 Feet
Deep Water Trail
Legend
Roads Trails
Sheet A9
18+75 Install French Drain (4 LF) (See Sheet D17) Spot Surfacing (5 CY) Spot Fill (5 CY)
24+40 Install French Drain (4 LF) ( See Sheet D17) Spot Surfacing (5 CY) Spot Fill (5 CY)
83+10 Spot Surfacing (20 CY) Spot Fills 20 CY
(Project Area B)
MN1
SC21
LC
LC2
SC623
SC
LC
SC81
LC
SC70
LC703
177D
99 8
4 1
35 3
4 35
18 17
20 22
29 25
14 13
21 21
34 36
282829
4 3
20 2119 222221 23 2420 19 21 22 2320 24 23
1234561
Birch Lake
Bald Eagle Lake
South Kawishiwi River
Johnson Lake
Slate LakeStony River
One Pine Lake
August Lake
North McDougal Lake
Quadga Lake
Stony Lake
Shallow Lake
Lake Gegoka
Stony River
Harris Lake
Grouse Lake
Wampus Lake
White Iron Lake
Gander Lake
Perch Lake
Blueberry Lake
Argo Lake Pike Lake
Dragon Lake
West Chub Lake
Little Lake
Gabbro Lake
Stony River
Bear Island River
Dunnigan Lake
Bogberry Lake
Cat Lake
Chow Lake
East Chub Lake
Shamrock Lake
Flat Horn Lake
Heart Lake
Denley Lake
Middle McDougal Lake
Campers Lake
Gull Lake
Whisper Lake
Pangi Lake
Wadop Lake
Baird Lake
Two Deer Lake
Omaday Lake
Iron Lake Pitcha Lake
Ova Lake
Planted Lake
Phospor Lake
Inga Lake
Beetle Lake
Grass Lake
Tonic Lake
Fran Lake
Nickel Lake Superstition Lake
Bearskin Lake
Kangas Lake
Alsike Lake
Canary Lake
John Lake
Myth Lake
Fishfry Lake
Sun Lake
Highlife Lake
Gunsten Lake
Gypsy Lake
Luster Lake
Pear Lake
Norway Lake
Little Wampus Lake
Moccasin Lake
Jackpot Lake
Gesend Pond
Eikela Lake
Tony Lake
Pearl Lake
Campfire Lake
Little Bear Lake
Peanut Lake
Exploit Lake
Steamhaul Lake
Sphagnum Lake
Starling Lake
Minnow Lake
Little Spring Lake
Bandana Lake
Mayfly Lake
Labrador Pond
Bubbles Lake
Teamster Lake
Dime Lake
T62NR10W T62NR9WT62NR11WT62NR12WT62NR13W
T60NR12WT60NR13W T59NR9WT59NR10WT59NR11W
R9W R13W
R9W
R13W
R9W
R13W
R9W
0 1.5 30.75 Miles
Project Area C
Legend BWCAW Boundary Stony Spur Trail Tomahawk Trail Main Roads
Sheet A10
(Kawishiwi Trails)
7 9
3 12
4 5
1 5
18 17
26 2529
262730 29 2825
5 4 3 2 51 6 42
MN1
SC623
SC21
SC81
LC2
SC70
Birch Lake
Slate Lake Stony River
August Lake Harris Lake
Perch Lake
Iron Lake
Argo Lake West Chub Lake
Little Lake
Blueberry Lake
Stony River
Dunnigan Lake
Bear Island River
Chow Lake
East Chub Lake
Shamrock Lake
Heart Lake
Denley Lake
Whisper Lake
Baird Lake
Pitcha Lake
Fran Lake
South Kawishiwi River
Stony River
Kangas Lake
Sun Lake
Highlife Lake
Gypsy Lake
Canary Lake
Pear Lake
Jackpot Lake
Tony Lake
Pearl Lake
Peanut Lake
Leatherleaf Lake
Minnow Lake
Little Spring Lake
Labrador Pond
Hanson Lake
T61NR10WT61NR11WT61NR12WT61NR13W
T60NR10WT60NR11WT60NR12WT60NR13W
R10W
R13W
R10W
R13W
Legend Stony Spur Trail Main Roads
0 1 20.5 Miles
Stony Spur Trail
MP 0.16 - Begin Surfacing Begin 6" Fill (Base) Begin Cuts & Fills (See Sheets C14 & D25)
MP 0.00 - POB Intersection SC623 (12' Trail Width)
MP 8.50 - Begin Swamp Crossing w/Geoweb (See Sheet C16) Begin 6" Fill (Base) Begin Surfacing
MP 10.36 - Begin Spot Surfacing (356 CY) Begin Spot Fills (356CY)
MP 11.00 - End Spot Fills (356CY) End Spot Surfacing (356CY)
MP 16.93 - Begin Swamp Crossing w/Geoweb (See Sheet C16) Begin 6" Fill (Base) Begin Surfacing
MP 17.11 - Begin Surfacing Begin 6" Fill (Base) Begin Cuts & Fills (See Sheets C14 & D25)
Sheet A11
(Project Area C)
MP 0.18 - Install CMPs (2-28"x20"x28')
MP 0.19 - End Cuts & Fills (See Sheet C14 & D25) End 6" Fill (Base) End Surfacing
MP 8.56 - End Swamp Crossing w/Geoweb (350LF) End 6" Fill (Base) End Surfacing
MP 16.98 - End Swamp Crossing w/Geoweb (225 LF) End 6" Fill (Base) End Surfacing
MP 17.16 End Cuts & Fills (See Sheet C14 & D25)
MP 17.18 - End 6" Fill (Base) End Surfacing
POE
29377
377I
R9W
R9W
R10W
R10W
T61NT61N
Legend Roads Tomahawk Trail0 600 1,200300
Feet
Tomahawk Trail
Sheet A12
MP 0.91 - End 6" Fill w/Geotextile (600LF As Staked) End Surfacing (600LF As Staked)
POE
MP 0.70 - Begin 6" Fills w/Geotextile (12' Trail Width)(See Sheet C15) Begin Surfacing (600 LF As Staked)
(Project Area C)
0.00 POB (Intersection FR 381)
DESIGN:___________________________
DRAWN:____________________________
CHECKED:___________________________
DATE: ___________________________R9
WEST ZONE
SUPERIOR NATIONAL FOREST
FOREST SERVICE
MARION
MARION ATV TRAILS
SUPERIOR NATIONAL FORESTS
1+50 TO 3+00
TRAIL SECTIONS
E x is ti n g C e n te rl in e
E x is ti n g C e n te rl in e
E x is ti n g C e n te rl in e
L-Stn: 1+50 Grd.Nxt. 3.3%
1+50
0 5 1
L-Stn: 2+00 Grd.Nxt. 0.2%
2+00
0 5 1
L-Stn: 2+50 Grd.Nxt. 4.2%
2+50
0 5 1
L-Stn: 3+00 Grd.Nxt. 3.8%
3+00
0 5 1
D 28
Sheet:
CIM-0909-11T-469-0909-01
Project No:
TO
DRAWN:____________________________
CHECKED:___________________________
DATE: ___________________________R9
WEST ZONE
SUPERIOR NATIONAL FOREST
FOREST SERVICE
MARION
MARION ATV TRAILS
SUPERIOR NATIONAL FORESTS
19+8015+00
L-Stn: 15+00 Grd.Nxt. -11
15+00
0 5 1
L-Stn: 15+50 Grd.Nxt. -7
15+50
0 5 1
L-Stn: 16+00 Grd.Nxt. -6
16+00
0 5 1
L-Stn: 16+50 Grd.Nxt. -7
16+50
0 5 1
L-Stn: 17+00 Grd.Nxt. -1
17+00
0 5 1
L-Stn: 17+50 Grd.Nxt. -2
17+50
0 5 1
L-Stn: 18+50 Grd.Nxt. -2
18+50
0 5 1
L-Stn: 19+00 Grd.Nxt. 2
19+00
0 5 1
L-Stn: 19+80 Grd.Nxt. -2
19+80
0 5 1
TRAIL SECTIONS
CIM-0909-11T-469-0909-01
Project No:
D 29
Sheet:
DRAWN:____________________________
CHECKED:___________________________
DATE: ___________________________R9
WEST ZONE
SUPERIOR NATIONAL FOREST
FOREST SERVICE
MARION
MARION ATV TRAILS
SUPERIOR NATIONAL FORESTS
24+4021+00
L-Stn: 21+00 Grd.Nxt. -2
21+00
0 5 1
L-Stn: 21+50 Grd.Nxt. -1
21+50
0 5 1
L-Stn: 22+00 Grd.Nxt. 1
22+00
0 5 1
L-Stn: 22+50 Grd.Nxt. 1
22+50
0 5 1
L-Stn: 23+00 Grd.Nxt. 4
23+00
0 5 1
L-Stn: 23+50 Grd.Nxt. 3
23+50
0 5 1
L-Stn: 24+00 Grd.Nxt. 5
24+00
0 5 1
L-Stn: 24+40 Grd.Nxt. 5
24+40
0 5 1
TRAIL SECTIONS
D 30
Sheet:
CIM-0909-11T-469-0909-01
Project No:
DRAWN:____________________________
CHECKED:___________________________
DATE: ___________________________R9
WEST ZONE
SUPERIOR NATIONAL FOREST
FOREST SERVICE
2+30
STONEY M.P. 0.19
STONEY ATV TRAILS
SUPERIOR NATIONAL FOREST
0+50
2 - 28"x20"x28' CMP
E x is ti n g C e n te rl in e
E x is ti n g C e n te rl in e
E x is ti n g C e n te rl in e
L-Stn: 0+50 Grd.Nxt. -1
0+50
0 5 1
L-Stn: 0+81 Grd.Nxt. 0
0+81
0 5 1
L-Stn: 1+00 Grd.Nxt. 0
1+00
0 5 1
L-Stn: 1+50 Grd.Nxt. 1
1+50
0 5 1
L-Stn: 2+00 Grd.Nxt. 1
2+00
0 5 1
L-Stn: 2+30 Grd.Nxt. 2
2+30
0 5 1
TRAIL SECTIONS
CIM-0909-11T-469-0909-01
Project No:
D 31
DRAWN:____________________________
CHECKED:___________________________
DATE: ___________________________R9
13+50 14+70
WEST ZONE
SUPERIOR NATIONAL FOREST
FOREST SERVICE
Stoney M.P. 17.11
STONEY ATV TRAILS
SUPERIOR NATIONAL FOREST
L-Stn: 13+50 Grd.Nxt. 10
BRIDGE 13+50
0 5 1
L-Stn: 13+80 Grd.Nxt. 18
13+80
0 5 1 0 85
L-Stn: 14+00 Grd.Nxt. 10
14+00
0 5 1
L-Stn: 14+20 Grd.Nxt. -1
14+20
0 5 1
L-Stn: 14+40 Grd.Nxt. -12
14+40
0 5 1
L-Stn: 14+60 Grd.Nxt. -13
14+60
0 5 1
L-Stn: 14+70 Grd.Nxt. -14
BRIDGE 14+70
0 5 1
TRAIL SECTIONS
CIM-0909-11T-469-0909-01
Project No:
D 32