DBA_WD_Lake.pdf
PDF 22 KB Posted
- Solicitation number
- AG-4419-S-10-0624
About this file
Wage Determination_Lake Co.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DBA_WD_St.Louis.pdf | ||
| Schedule of Items.pdf | ||
| Specifications.pdf | ||
| Maps.pdf | ||
| SF 1442.pdf | ||
| SF 1442 Cont_0624.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MN100047 03/12/2010 MN47
Superseded General Decision Number: MN20080047
State: Minnesota
Construction Type: Highway
Counties: Cook and Lake Counties in Minnesota.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 03/12/2010
ELEC0242-009 05/31/2009
Rates Fringes
ELECTRICIAN......................$ 31.24 63.5%
ENGI0049-030 05/01/2009
Power Equipment Operator
GROUP 1.....................$ 31.57 15.25
GROUP 2.....................$ 30.57 15.25
GROUP 3.....................$ 30.02 15.25
GROUP 4.....................$ 29.72 15.25
GROUP 5.....................$ 26.68 15.25
GROUP 6.....................$ 25.47 15.25
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1 - Hydraulic Backhoe and/or other similar equipment with Shovel-type Controls 3 cu. yds. & over Mfg. rated Cap.
GROUP 2 - Hydraulic Backhoe and/or similar equipment with
Shovel-type Controls, up to 3 cu. yds. Mfg. rated cap.;
Front End Loader, 5 cu. yds. & over; Mixer (Paving)
Concrete Paving, Road; Tandem Scraper
GROUP 3 - Scraper - Struck Cap. 32 cu. yds. & over
GROUP 4 - Bituminous Spreader & Finishing (Power); Cat &
Scraper; Crushing Plant (Gravel & Stone) or Gravel Washing, Crushing & Screening Plant; Front End Loader, over 1 cu.
yd.; Rubber- tired Farm Tractor, Backhoe Attach.; Scraper, up to 32 cu. yds.; Tractor, Bulldozer
GROUP 5 - Bituminous Spreader & Bituminous Finishing Machine
Tender (Power); Concrete Distributor & Spreader Finishing
Machine, Longitudinal Float, Joint Machine, & Spray; Self-propelled Chip Spreader (Flaherty or similar); Shouldering
Machine (Power) Apsco or similar type inclu. self-propelled
Sand & Chip Spreader; Tractor Operator, Bulldozer, 50 HP or less
4/13/2010http://www.wdol.gov/wdol/scafiles/davisbacon/MN47.dvb
GROUP 6 - Oiler (Power Shovel, Crane, Dragline); & Truck
Crane Oiler
UNDERGROUND WORK:
TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE -
$ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
LABO1091-007 05/01/2009
Laborers: (Construction
Laborer; Bituminous
Worker-Shoveler, Raker, Floater, Squeegee, Utility)......$ 27.14 11.52
PLAS0633-009 05/01/2009
CEMENT MASON/CONCRETE FINISHER...$ 29.63 15.45
SUMN1999-019 04/13/1999
LABORER: Landscape..............$ 9.13 3.39
* TEAM0160-011 05/01/2009
TRUCK DRIVER (Tandem Axles)......$ 25.10 12.40
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .