General Decision Number: MN100047 03/12/2010 MN47

Superseded General Decision Number: MN20080047

State: Minnesota

Construction Type: Highway

Counties: Cook and Lake Counties in Minnesota.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 03/12/2010

ELEC0242-009 05/31/2009

Rates Fringes

ELECTRICIAN......................$ 31.24 63.5%

ENGI0049-030 05/01/2009

Power Equipment Operator

GROUP 1.....................$ 31.57 15.25

GROUP 2.....................$ 30.57 15.25

GROUP 3.....................$ 30.02 15.25

GROUP 4.....................$ 29.72 15.25

GROUP 5.....................$ 26.68 15.25

GROUP 6.....................$ 25.47 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1 - Hydraulic Backhoe and/or other similar equipment with Shovel-type Controls 3 cu. yds. & over Mfg. rated Cap.

GROUP 2 - Hydraulic Backhoe and/or similar equipment with

Shovel-type Controls, up to 3 cu. yds. Mfg. rated cap.;

Front End Loader, 5 cu. yds. & over; Mixer (Paving)

Concrete Paving, Road; Tandem Scraper

GROUP 3 - Scraper - Struck Cap. 32 cu. yds. & over

GROUP 4 - Bituminous Spreader & Finishing (Power); Cat &

Scraper; Crushing Plant (Gravel & Stone) or Gravel Washing, Crushing & Screening Plant; Front End Loader, over 1 cu.

yd.; Rubber- tired Farm Tractor, Backhoe Attach.; Scraper, up to 32 cu. yds.; Tractor, Bulldozer

GROUP 5 - Bituminous Spreader & Bituminous Finishing Machine

Tender (Power); Concrete Distributor & Spreader Finishing

Machine, Longitudinal Float, Joint Machine, & Spray; Self-propelled Chip Spreader (Flaherty or similar); Shouldering

Machine (Power) Apsco or similar type inclu. self-propelled

Sand & Chip Spreader; Tractor Operator, Bulldozer, 50 HP or less

4/13/2010http://www.wdol.gov/wdol/scafiles/davisbacon/MN47.dvb

GROUP 6 - Oiler (Power Shovel, Crane, Dragline); & Truck

Crane Oiler

UNDERGROUND WORK:

TUNNELS, SHAFTS, ETC. - $ .25 PREMIUM UNDER AIR PRESSURE -

$ .50 PREMIUM

HAZARDOUS WASTE PROJECTS (PPE Required):

LEVEL A - $1.25 PREMIUM

LEVEL B - $ .90 PREMIUM

LEVEL C - $ .60 PREMIUM

LABO1091-007 05/01/2009

Laborers: (Construction

Laborer; Bituminous

Worker-Shoveler, Raker, Floater, Squeegee, Utility)......$ 27.14 11.52

PLAS0633-009 05/01/2009

CEMENT MASON/CONCRETE FINISHER...$ 29.63 15.45

SUMN1999-019 04/13/1999

LABORER: Landscape..............$ 9.13 3.39

* TEAM0160-011 05/01/2009

TRUCK DRIVER (Tandem Axles)......$ 25.10 12.40

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION