SCHEDULE OF ITEMS - BMOHV Trail 3 Trails Maintenance Package 7 - Grandfather RD, Pisgah NF

UNIT Optional Item BMOHV Trl 3 Segment BMOHV Trl 3

DESCRIPTION PRICE QTY 1.9 Mile QTY Sta.64+40 to 78+76

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.9

Hazard tree removal Mile 1.9

Aggregate surfacing / Armoring / Geo-grid Mile 1.9

Install Armored water crossings (each water crossing includes armoring of both approaches) Each 5

Establish one stable trail , re-establish positive drainage. Contractor to propose methods, materials, design for a difficult area to repair/maintain. LF 1,436

BID AMOUNT PER TRAIL SEGMENTS - SUBTOTALS

Total Trail 3 Base Bid (Optional Item not included)

Total Trail 3 Bid Including Optional Item

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid

SCHEDULE OF ITEMS - BMOHV Trail 5

UNIT BMOHV Trl 5 DESCRIPTION PRICE QTY 1.5 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5

Hazard tree removal Mile 1.5

Aggregate surfacing / Armoring / Geo-grid Mile 1.5

Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 1.5

BID AMOUNT PER TRAIL

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

SCHEDULE OF ITEMS - BMOHV Trail 7

UNIT BMOHV Trl 7 DESCRIPTION PRICE QTY 2.1 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 2.1

Hazard tree removal Mile 2.1

Aggregate surfacing / Armoring / Geo-grid Mile 2.1

Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 2.1

BID AMOUNT PER TRAIL

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

SCHEDULE OF ITEMS - BMOHV Trail 9

UNIT BMOHV Trl 9 DESCRIPTION PRICE QTY 5.0 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 5.0

Hazard tree removal Mile 5.0

Aggregate surfacing / Armoring / Geo-grid Mile 5.0

Install Armored water crossings (each water crossing includes armoring of both approaches) Each 14

Crib Wall Installation SF 700

BID AMOUNT PER TRAIL

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Schedule of Items Pkg 7 BMOHV 3 Trl
Sheet1
Schedule of Items Pkg 7 BMOHV 5 Trl
Sheet1
Schedule of Items Pkg 7 BMOHV 7 Trl
Sheet1
Schedule of Items Pkg 7 BMOHV 9 Trl
Sheet1

File details come from the government source that posted it. Updated .