SCHEDULE OF ITEMS - BMOHV Trail 3 Trails Maintenance Package 7 - Grandfather RD, Pisgah NF
UNIT Optional Item BMOHV Trl 3 Segment BMOHV Trl 3
DESCRIPTION PRICE QTY 1.9 Mile QTY Sta.64+40 to 78+76
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.9
Hazard tree removal Mile 1.9
Aggregate surfacing / Armoring / Geo-grid Mile 1.9
Install Armored water crossings (each water crossing includes armoring of both approaches) Each 5
Establish one stable trail , re-establish positive drainage. Contractor to propose methods, materials, design for a difficult area to repair/maintain. LF 1,436
BID AMOUNT PER TRAIL SEGMENTS - SUBTOTALS
Total Trail 3 Base Bid (Optional Item not included)
Total Trail 3 Bid Including Optional Item
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid
SCHEDULE OF ITEMS - BMOHV Trail 5
UNIT BMOHV Trl 5 DESCRIPTION PRICE QTY 1.5 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5
Hazard tree removal Mile 1.5
Aggregate surfacing / Armoring / Geo-grid Mile 1.5
Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 1.5
BID AMOUNT PER TRAIL
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
SCHEDULE OF ITEMS - BMOHV Trail 7
UNIT BMOHV Trl 7 DESCRIPTION PRICE QTY 2.1 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 2.1
Hazard tree removal Mile 2.1
Aggregate surfacing / Armoring / Geo-grid Mile 2.1
Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 2.1
BID AMOUNT PER TRAIL
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
SCHEDULE OF ITEMS - BMOHV Trail 9
UNIT BMOHV Trl 9 DESCRIPTION PRICE QTY 5.0 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 5.0
Hazard tree removal Mile 5.0
Aggregate surfacing / Armoring / Geo-grid Mile 5.0
Install Armored water crossings (each water crossing includes armoring of both approaches) Each 14
Crib Wall Installation SF 700
BID AMOUNT PER TRAIL
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
| Schedule of Items Pkg 7 BMOHV 3 Trl |
| Sheet1 |
| Schedule of Items Pkg 7 BMOHV 5 Trl |