Attachment 1 - Rev Specifications - SOW supp.pdf
PDF 49 KB Posted
- Solicitation number
- AG-4419-S-10-0585
About this file
Attachment 1 - Rev Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Specification REV.txt | TXT text file | |
| Exhibit 1 - Map Brown Mtn.pdf | ||
| Section B - Rev Schedule of Items.pdf | ||
| Section M -Revised- Selection Criteria.doc | DOC document | |
| SF30 - Amendment 1.pdf | ||
| Exhibit 4 - Rev Trail Logs Combined.pdf | ||
| Section B - Schedule of Items.pdf | ||
| Exhibit 1 - Map Brown Mtn.pdf | ||
| Exhibit 2 - Drawings.pdf | ||
| Attachment 1 - Specifications - SOW supp.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Exhibit 4 - Trail Logs Combined.pdf | ||
| Section A - SF1449.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Exhibit 3 - Design Parameters.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work:
Brown Mountain OHV Trails: 3, 5, 7, and 9 Location: All trails are located in the Brown Mountain OHV Area on the Grandfather Ranger District, north of Nebo, NC.
Work to be performed: Maintenance is to be performed on 11.1 miles of existing All-Terrain Vehicle and Motorcycle trails to bring them up to current USDA Forest Service trail standards on Brown Mountain Off-Highway Vehicle (OHV) Trails 3, 5, 7, and 9. Work will include, but may not be limited to, restoration of the trail tread, restoring/installing grade dips and other drainage features, installing/extending lead-off ditches, filling/armoring entrenched areas, armoring stream crossings, brushing vegetation, installation of crib walls, and felling hazard trees.
Bid Optional Item: BMOHV Trail #3: Restoration / stabilization of a total of 3,780 linear feet of existing OHV trail as indicated in the trail-log. Trail #3 includes 2 separate optional item sections. Bid Optional Section A is from Station 0+00 to 13+75 (1,375 linear feet). Bid Optional Setion B is from Station 91+70 to 115+75 (2,405 linear feet).
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Scope of Work and Specifications:
Assessment logs identifying maintenance needs are attached for each trail. Trail maps are also included in this package. Design parameters are specified by trail designed use and class. Maintenance work must conform to these parameters and standard specifications unless otherwise specified in the trail assessment logs. Refer to Standard Specifications for Construction and Maintenance of Trails (EM-7720-103), Standard Drawings for Construction and Maintenance of Trails” (EM-7720-104) , and attached drawings and specifications.
· Brown Mountain Trail 3 - is a 2.2-mile Class 3 OHV trail, designed and managed for motorcycle use. Work begins at the intersection of Trail 3 and Trail 1, and continues west until the intersection with Trail 1B. Maintenance needs identified in the attached trail log include brushing, logging-out, and hazard tree removal; cleaning, restoring, and installing grade dips; de-berming, out-sloping, and restoring trail tread; filling incised tread and/or installing rock armoring with geogrid; armoring stream crossings; and obliteration of user-created trails. Portions of Trail 3 are included as bid optional items, as indicated above and in the trail log.
· Brown Mountain Trail 5 - is a 1.6-mile Class 3 trail, designed and managed for motorcycle use. Work begins at the intersection with Trail 6 and continues south until the intersection with Trail 4. Maintenance needs include brushing, logging-out, and hazard tree removal; cleaning, restoring, and installing grade dips; de-berming, out-sloping, and restoring trail tread; filling incised tread and/or installing rock armoring with geogrid; armoring stream crossings; and obliteration of user-created trails
· Brown Mountain Trail 7 - is a 2.3-mile Class 3 trail, designed and managed for motorcycle use. Work begins at the intersection with Trail 8 and at the intersection with Trail 6. Maintenance needs include brushing, logging-out, and hazard tree removal; cleaning, restoring, and installing grade dips; de-berming, out-sloping, and restoring trail tread; filling incised tread and/or installing rock armoring with geogrid; armoring stream crossings; and obliteration of user-created trails
· Brown Mountain Trail 9 - is a 5.0-mile Class 3 trail, designed for ATV use and managed motorcycle and ATV use. Work begins at its northern intersection with Trail 1, and continues south until the Brown Mountain OHV parking area. Maintenance needs identified in the attached trail log include brushing, logging-out, and hazard tree removal; cleaning, restoring, and installing grade dips; de-berming, out-sloping, and restoring trail tread; filling incised tread and/or installing rock armoring with geogrid; armoring stream crossings; installing crib walls; and obliteration of user-created trails In addition to trail specific needs identified in the trail logs, work to be performed includes:
Contractor shall use equipment
· Equipment width shall be limited to 48-inches for all trail work. Use of equipment (on trails) that exceeds this maximum width requirement must be approved by Inspector/COR.
· Restoration or maintenance of trail tread, grade dips, and other drainage features per attached drawings and specifications.
· Establishing an average of 100 grade dips per mile to ensure proper drainage of the entire length of identified trails. Existing dips can be utilized if they produce adequate positive drainage off of the trail.
· Clearing vegetation overhead and on each side of trail. Required clearing height and width vary by designed use and trail class as specified in attached trail design parameters. Standing dead or hazardous trees within this clearing area shall be felled. Dead or hazardous trees within 10 ft. of the edge of the trail shall also be felled.
· Restricting ground disturbing work activities to the current trail-way. Rock and soil can be moved and utilized within this corridor, but not outside.
· Apply Winter Rye seed and straw mulch to cut/fill areas on new trail construction, i.e. re-routes
· Verifying required materials prior to bidding. All imported material is at contractor’s cost and should be included in bid. Material brought in must be approved by the COR or inspector prior to installation.
· Armoring ATV & motorcycle trail tread and stream crossings: Location of areas to be armored are identified in trail logs. Armoring will consist of placing railroad ballast or rip-rap stone to a depth adequate for stabilization, in some cases stone will be placed over compacted fill. On wet soils, or where specified in trail logs, a layer of geo-grid shall be placed underneath stone. Stone armor installation and materials shall be coordinated with and approved by COR or Inspectors.
All trail maintenance required under this contract must be done in accordance with agency standards found in this publications: “Standard Specifications for Construction and Maintenance of Trails” (EM-7720-103) and “Standard Drawings for Construction and Maintenance of Trails” (EM-7720-104). These Specifications and Drawings are available in hardcopy booklet form from the Government printing office. They are also available via internet at the Government Printing Office. Visit at http://www.fs.fed.us/.ftproot/pub/acad/dev/trails/trails.htm for more information. The Contractor shall have a copy of the Standard Specifications and Drawings on the job site.
Contractors shall:
· Review the project site on the ground prior to submitting a bid.
· Lay out and flag dip locations and structures except for those already laid out by the Forest Service. The Forest Service inspector or COR shall approve lay out prior ground disturbing work on the trail.
· Post temporary trail closure signs when maintenance includes felling trees or poses a safety risk to users.
· Post signs indicating that ongoing work is part of the American Recovery and Reinvestment Act. Signs will be provided by the USDA Forest Service.
· If notified, stop work on all or certain sections of the trails due to weather conditions, evidence of archeological sites or sensitive species.