SCHEDULE OF ITEMS - BMOHV Trail 3 Trails Maintenance Package 7 - Grandfather RD, Pisgah NF

DESCRIPTION UNIT PRICE QTY Bid Amount QTY Bid Amount QTY Bid Amount

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5

Hazard tree removal Mile 1.5

Aggregate surfacing / Armoring / Geo-grid Mile 1.5

Install Armored water crossings (each water crossing includes armoring of both approaches) Each 5

Restore tread & re-establish positive drainage. Fill & armor; or install s-curves & rehab erosion; or other contractor proposed methods, materials, & technical solutions for deeply incised tread (Submitted in Implementation Plan) LF 1,375 2,405

BID AMOUNT PER TRAIL SEGMENTS - SUBTOTALS

Trail 3 Base Bid (Optional Item not included)

Trail 3 Optional Items (Sect. A & B) Total

Total Trail 3 - Base Bid Plus Optional Items

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor. ` Payment for such work is indirectly included under other pay items shown in the bid

Base Bid Item Bid Optional Items Section A, 0+00 to 13+75 Section B, 91+70 to 115+7513+75 to 91+70

SCHEDULE OF ITEMS - BMOHV Trail 5

UNIT BMOHV Trl 5 DESCRIPTION PRICE QTY 1.5 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5

Hazard tree removal Mile 1.5

Aggregate surfacing / Armoring / Geo-grid Mile 1.5

Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 1.5

BID AMOUNT PER TRAIL

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.

Payment for such work is indirectly included under other pay items shown in the bid

SCHEDULE OF ITEMS - BMOHV Trail 7

UNIT BMOHV Trl 7 DESCRIPTION PRICE QTY 2.1 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 2.1

Hazard tree removal Mile 2.1

Aggregate surfacing / Armoring / Geo-grid Mile 2.1

Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 2.1

BID AMOUNT PER TRAIL

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

SCHEDULE OF ITEMS - BMOHV Trail 9

UNIT BMOHV Trl 9 DESCRIPTION PRICE QTY 5.0 Mile

Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 5.0

Hazard tree removal Mile 5.0

Aggregate surfacing / Armoring / Geo-grid Mile 5.0

Install Armored water crossings (each water crossing includes armoring of both approaches) Each 14

Crib Wall Installation SF 700

BID AMOUNT PER TRAIL

Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.

Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.

All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.

Pkg 7 SOI BMTR3 5-3-10
Sheet1
Schedule of Items Pkg 7 BMOHV 5 Trl 5-3-10
Sheet1
Schedule of Items Pkg 7 BMOHV 7 Trl 5-3-10
Sheet1
Schedule of Items Pkg 7 BMOHV 9 Trl 5-3-10
Sheet1

File details come from the government source that posted it. Updated .