Section B - Rev Schedule of Items.pdf
PDF 75 KB Posted
- Solicitation number
- AG-4419-S-10-0585
About this file
Section B - Revised Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Specification REV.txt | TXT text file | |
| Exhibit 1 - Map Brown Mtn.pdf | ||
| Section M -Revised- Selection Criteria.doc | DOC document | |
| Attachment 1 - Rev Specifications - SOW supp.pdf | ||
| SF30 - Amendment 1.pdf | ||
| Exhibit 4 - Rev Trail Logs Combined.pdf | ||
| Section B - Schedule of Items.pdf | ||
| Exhibit 1 - Map Brown Mtn.pdf | ||
| Exhibit 2 - Drawings.pdf | ||
| Attachment 1 - Specifications - SOW supp.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Exhibit 4 - Trail Logs Combined.pdf | ||
| Section A - SF1449.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Exhibit 3 - Design Parameters.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS - BMOHV Trail 3 Trails Maintenance Package 7 - Grandfather RD, Pisgah NF
DESCRIPTION UNIT PRICE QTY Bid Amount QTY Bid Amount QTY Bid Amount
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5
Hazard tree removal Mile 1.5
Aggregate surfacing / Armoring / Geo-grid Mile 1.5
Install Armored water crossings (each water crossing includes armoring of both approaches) Each 5
Restore tread & re-establish positive drainage. Fill & armor; or install s-curves & rehab erosion; or other contractor proposed methods, materials, & technical solutions for deeply incised tread (Submitted in Implementation Plan) LF 1,375 2,405
BID AMOUNT PER TRAIL SEGMENTS - SUBTOTALS
Trail 3 Base Bid (Optional Item not included)
Trail 3 Optional Items (Sect. A & B) Total
Total Trail 3 - Base Bid Plus Optional Items
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor. ` Payment for such work is indirectly included under other pay items shown in the bid
Base Bid Item Bid Optional Items Section A, 0+00 to 13+75 Section B, 91+70 to 115+7513+75 to 91+70
SCHEDULE OF ITEMS - BMOHV Trail 5
UNIT BMOHV Trl 5 DESCRIPTION PRICE QTY 1.5 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 1.5
Hazard tree removal Mile 1.5
Aggregate surfacing / Armoring / Geo-grid Mile 1.5
Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 1.5
BID AMOUNT PER TRAIL
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
Work for which a specific bid item is not provided, is a subsidiary obligation of the Contractor.
Payment for such work is indirectly included under other pay items shown in the bid
SCHEDULE OF ITEMS - BMOHV Trail 7
UNIT BMOHV Trl 7 DESCRIPTION PRICE QTY 2.1 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 2.1
Hazard tree removal Mile 2.1
Aggregate surfacing / Armoring / Geo-grid Mile 2.1
Install Armored water crossings (each water crossing includes armoring of both approaches) Mile 2.1
BID AMOUNT PER TRAIL
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
SCHEDULE OF ITEMS - BMOHV Trail 9
UNIT BMOHV Trl 9 DESCRIPTION PRICE QTY 5.0 Mile
Trail restoration, corridor clearing, blow-down removal, root removal, cleaning & restoration of grade dips and other exist. drainage features, installation of new drainage features, trail obliteration Mile 5.0
Hazard tree removal Mile 5.0
Aggregate surfacing / Armoring / Geo-grid Mile 5.0
Install Armored water crossings (each water crossing includes armoring of both approaches) Each 14
Crib Wall Installation SF 700
BID AMOUNT PER TRAIL
Bidders must provide prices on all base bid items & optional items, to be considered for award. One award will be made for this solicitation.
Work shall include site-specific tasks (as described in the trail logs), in addition to all work required to bring all trails up to standard per EM-7720-103, Standard Specifications for Construction and Maintenance of Trails.
All contract work shall be included, either directly or indirectly, under the pay items shown in the bid schedule.
| Pkg 7 SOI BMTR3 5-3-10 |
| Sheet1 |
| Schedule of Items Pkg 7 BMOHV 5 Trl 5-3-10 |
| Sheet1 |
| Schedule of Items Pkg 7 BMOHV 7 Trl 5-3-10 |
| Sheet1 |
| Schedule of Items Pkg 7 BMOHV 9 Trl 5-3-10 |
| Sheet1 |
File details come from the government source that posted it. Updated .