About this file

SF30 - Amendment 1

View the file

Other files

File Type Posted
SF 30 Amendment 2.pdf PDF
Revised Section I - Additional Clauses.doc DOC document
Attachment 3 - Specifications Rev 1.doc DOC document
Pre-Bid Sign in Sheet.pdf PDF
Section B1 - SoI - Supplemental Instruction.doc DOC document
Attachment 1 - Specifications.pdf PDF
Section B - Schedule of Items.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Sections C thru M - Solicitation .doc DOC document
Attachment 2 - Wage Determination.doc DOC document
Section A - SF1449.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-4419-S-10-0581

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

AG4419S-10-058105/03/2010000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/19/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide,revise and replace existing specifications in

Attachment 1 of this solicitation and to provide the sign-in sheet from the pre-bid meeting.

1) Provide,revise and replace existing specifications in Attachment 1:

A. Specifications - Section 623 General Labor (experienced faller) - Add the following language: " A general labor may be required to cut trees that can not be taken down by the excavator, the general labor is required to support the equipment when necessary. If the equipment is capable of taking down trees safely then a general labor is not required and

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

GARY S. BABER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-4419-S-10-0581/000001

will not be needed. The general labor cost is incidental to the equipment cost and no other compensation will be made."

B. Specifications - Section 203 - Removal of

Structures and Obstructions - add "Any trash related items such as geo fabric, silt fence, or general trash within the trail corridor (within

30 feet from the trail centerline) will be removed and disposed of off National Forest

System Lands. Payment for this work is incidental to Bid Item 203 removal of culverts or other bid items and no other payment will be made"

C. Specifications - Section 622 Rental Equipment

- Replace the Bull Dozer Specification with the following:

The bull dozer shall be a Caterpillar D5 or D6 equipment with adjustable rippers. Contractor shall provide support resources necessary to get each operator to and from equipment each day.

(1) Caterpillar D5 or D6 Bull dozer or equal

Dozer:

Min weight ¿ 26,000 lbs

Min 120 HP

Dozer shall be equipped with hydraulic parallelogram rippers with experienced operator as described above. Equipment shall be equipment with a blade capable to moving material example would be a "SU" or equivalent - (6-way blade) and

Unit price bid should be for one dozer for one hour of running time as recorded on the hour meter of each dozer).

2) Pre-bid sign in sheet - See Attached

All other terms and conditions remain unchanged.

This project is funded in whole by the American

Recovery and Reinvestment Act (ARRA).