Revised Section I - Additional Clauses.doc
DOC document 28 KB Posted
- Solicitation number
- AG-4419-S-10-0581
About this file
Revised Section I - Additional Clauses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 2.pdf | ||
| Attachment 3 - Specifications Rev 1.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Pre-Bid Sign in Sheet.pdf | ||
| Section B1 - SoI - Supplemental Instruction.doc | DOC document | |
| Attachment 1 - Specifications.pdf | ||
| Section B - Schedule of Items.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Sections C thru M - Solicitation .doc | DOC document | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1449.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-4419-S-10-0581 Tellico Obliteration Project
Additional clauses to solicitation
52.228-1 -- Bid Guarantee.
Bid Guarantee (Sep 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be _20____ percent of the bid price
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
52.228-2 -- Additional Bond Security.
Additional Bond Security (Oct 1997) The Contractor shall promptly furnish additional security required to protect the Government and persons supplying labor or materials under this contract if --
(a) Any surety upon any bond, or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government;
(b) Any surety fails to furnish reports on its financial condition as required by the Government;
(c) The contract price is increased so that the penal sum of any bond becomes inadequate in the opinion of the Contracting Officer; or
(d) An irrevocable letter of credit (ILC) used as security will expire before the end of the period of required security. If the Contractor does not furnish an acceptable extension or replacement ILC, or other acceptable substitute, at least 30 days before an ILC’s scheduled expiration, the Contracting officer has the right to immediately draw on the ILC.
(End of Clause)
52.228-16 Performance and Payment Bonds—Other Than Construction (Nov 2006)
As prescribed in 28.103-4, insert a clause substantially as follows:
Performance and Payment Bonds—Other Than Construction (Nov 2006)
(a) Definitions. As used in this clause—
“Original contract price” means the award price of the contract or, for requirements contracts, the price payable for the estimated quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) The Contractor shall furnish a performance bond (Standard Form 1418) for the protection of the Government in an amount equal to 50 percent of the original contract price and a payment bond (Standard Form 1416) in an amount equal to 0 percent of the original contract price.
(c) The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within 20 days, but in any event, before starting work.
(d) The Government may require additional performance and payment bond protection if the contract price is increased. The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bonds or to obtain additional bonds.
(e) The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register, or may be obtained from the:
U.S. Department of the Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782.
Or via the internet at http://www.fms.treas.gov/c570/.
(End of clause)
52.229-2 North Carolina State and Local Sales and Use Tax (Apr 1984)