Attachment 1 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 2.pdf | ||
| Revised Section I - Additional Clauses.doc | DOC document | |
| Attachment 3 - Specifications Rev 1.doc | DOC document | |
| SF30 Amendment 1.pdf | ||
| Pre-Bid Sign in Sheet.pdf | ||
| Section B1 - SoI - Supplemental Instruction.doc | DOC document | |
| Section B - Schedule of Items.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Sections C thru M - Solicitation .doc | DOC document | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1449.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL FORESTS IN NORTH CAROLINA
TUSQUITEE RANGER DISTRICT
CHEROKEE COUNTY
FP 03 - SUPPLEMENTAL SPECIFICATIONS
for
Upper Tellico OHV Area
Trail Obliteration
ARRA – CIM-0811-04T
February- 2010
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms.
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government Provided Sources.
105.02(a) Government Provided Sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
107 - Legal Relations and Responsibility to the Public
107.02 Protection and Restoration of Property and Landscape.
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
108 Delete.
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
109.02 Measurement Terms and Definitions
109.04 Receiving Procedures.
155 - Schedules for Construction Contracts
155 Delete.
156 - Public Traffic
156.03 Accommodating Traffic During Work.
156.04 Maintaining Roadways During Work.
156.08 Traffic and Safety Supervisor.
157 - Soil Erosion Control
157.02 Materials.
157.03 General.
157.04 Controls and Limitations on Work.
157.09 Diversions21
157.11 Temporary Turf Establishment
157.12 Inspection and Reporting
157.13 Maintenance & Cleanup.
203 Removal of Strucutres and Obstructions……………………………………………26
622 - Equipment rental…………………………………………………………………27
623 - General Labor
625 - Turf Establishment
625.04 Preparing Seedbed.
625.06 Fertilizing.
625.08 Mulching.
625.09 Protecting and Caring for Seeded Area.
635 Temporary Traffic Control………………………………………………………..33
650 - Road Closure Devices
713 - Roadside Improvement Material
713.03 Fertilizer.
713.04 Seed.
713.05 Mulch.
718 - Traffic Signing and Marking Material
718.02 Reserved.
718.02 Protective Overlay Film and Edge Film.
718.14 (g) Waterborne Traffic Paint - Daylight reflectance
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_02_17_2005
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Delete paragraph (d).
(d). Slope notation (horizontal : vertical)
(e) Symbols:
mp Milepost ppm Parts Per Million
101.04_nat_us_02_22_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
http://www.nist.gov/
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the
“purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal
Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale
Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition
Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure and the contractors offers of a unit price and total bid amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig h t o f
W a y
R o a d s id e R o a d s id e
C le a ri n g W id th
R o a d w a y C le a ri n g L im it
X Y
G ro u n d L in e
T ra v e le d
W a y C L
B e rm S u rf a c e
C o u rs e
B a s e
C o u rs e
F ill
S lo p e
B a c k S lo p e
D ra in a g e
D itc h
G ro u n d L in e
S u b g ra d e
R o a d
B e d
S h a p e s a n d d im e n s io n s w ill v a ry t o f it l o c a l c o n d iti o n s
S e e d ra w in g s f o r ty p ic a l s e c tio n s
X a n d
Y d e n o te c le a ri n g o u ts id e o f ro a d w a y
N o te
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_02_17_2005
Deletions
Delete sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_05_11_2004
105.02 Material Sources.
105.02(a) Government Provided Sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.02_nat_us_02_17_2005
105.02(a) Government Provided Sources.
(a) Government-provided sources. Add the following:
There are no Government-provided sources for this project.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The
Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_03_29_2005
106.01 Conformity with Contract Requirements.
Delete first sentence of 3 rd paragraph.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the
AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the
Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
106.07_nat_us_05_11_20
107 - Legal Relations and Responsibility to the Public
107.02_0811_us_12_14_2004
107.02 Protection and Restoration of Property and Landscape.
Add the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented.
Follow all requirements of Section 157.
Monitor the National Weather Service forecast. Do not commence land disturbing activities if within the next 24 hours there is a fifty percent chance of precipitation with rainfall amounts greater than ¼ inch.
Stabilize all embankments higher than 4 feet vertical and all disturbed areas within 25 feet of protected streams with temporary ground cover at the end of each workday.
Temporary ground cover consists of mulch sufficient to completely cover the disturbed area.
Complete all protected stream culvert installations as soon as possible; preferably within the same day of initial disturbance.
Apply final seeding and fertilizer under section 625 within 10 days of initial disturbance for all fills over 4 feet vertical and within 25 feet of all protected stream courses.
At designated locations place 3 inch rock a minimum 6 inches deep across the road prism for at least 50 feet down the centerline to provide a construction entrance.
Remove sediment from behind temporary silt fences when the depth is greater than 6 inches.
Assure that all temporary erosion control measures are in place prior to suspending work on project suspensions longer than 7 days. During work suspension maintain temporary erosion control measures in a working condition.
Do not work within the wetted perimeter of streams before April 15 th or after October th
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_04_27_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_02_23_2005
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of
15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
109.02 Measurement Terms and Definitions.
Add the following definitions:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
(q) Actual Quantities (AQ). The quantity of the number of units designated in the
Schedule of Items to be paid for at the unit bid price is the number actually measured or counted in the field and accepted as meeting the requirements of the contract.
109.02_0811_us_07_27_2005
109.02 Measurement Terms and Definitions
Add the following under subsection (1) Cubic yard in place:
(d) Compute the quantity by means of a computer generated digital terrain model.
109.04_0811_us_12_14_2004
109.04 Receiving Procedures.
Delete the section and add the following:
When the method of measurement requires weighing in the hauling vehicle, furnish a person to direct the spreading and distribution of material and to record the location and placement of the material on the project. During the placement, maintain a record of each delivery and document it in an acceptable manner. Include the following information:
a) Project identification
b) Truck identification
c) Drivers Name and original signature
d) Date and time weighed
e) Gross and net mass
f) Daily total for each truck
Use an approved format for the delivery record(s). Furnish the original record(s) and a written certification of the delivery of the material at the end of each week.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic
156.03_nat_us_02_24_2005
156.01 Description
The contractor shall address these closure devices in his traffic control plan. At no time shall the contractor leave these sections open during the life on the contract.
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
157 - Soil Erosion Control
157.02 Materials. Add the following:
Coarse Aggregate for Concrete...…………………………………703.02
Watertight Gaskets………………………………………………..712.03
Construction Requirements
157.03 General.
Delete the first two paragraphs and add the following:
Submit a written erosion control plan detailing specific sediment control measures to minimize delivery of soil and turbidity into the streams and to minimize erosion during the construction period. The plan shall be in accordance with the contract specifications, contract permits, Section 107, and this Section. Submit the erosion control plan proposal to the Contracting Officer for approval at least 21 days before ground disturbing operations begin. Contract permits amend the requirements of this Section. Do not modify the type, size, or location of any control or practice without approval. Measures given in the Plans and Supplemental Specifications are minimum requirements.
Erosion control plan reflect special concerns and measures necessary to protect resources and government improvements. It shall include:
(a) The construction activities and sequence of implementation relating to specific erosion control measures.
(b) The location and type of permanent controls to be implemented during construction.
(c) The location and type of temporary controls to be implemented during construction.
(d) For work in stream channels with running water, a detailed dewatering plan.
(e) For work in stream channels without flowing water describe the level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
(f) Describe what monitoring will take place.
The turbidity of the water 150’ feet downstream shall not be visually greater than the turbidity of the water upstream of the project site.
When this turbidity requirement or other erosion control measures are not met, immediately take corrective action. Cease operations that are causing turbidity and pump the stream around the construction site according to this specification and the Plans until the turbidity requirement can be met. When the interpretation of this requirement is in question, measure turbidity using a turbidity meter as approved by the CO, and provide documentation that operations are in compliance with Section 107.01 Laws to be
Observed, Section 107.10 Environmental Protection, and Section 107.11.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Incorporate all erosion control features into the project at the earliest practicable time, as agreed by the CO.
Operate in a manner that will avoid harm to aquatic organisms whenever possible.
Notify the CO of the intention to dewater the stream, at least 72 hours in advance (not including weekends and holidays). Do not re-route a stream until approved by the CO.
Do not release water through a newly constructed simulated streambed until approved by the CO. After approval, release water slowly and incrementally over a period of at least one hour, or as approved by the CO. During this time, treat any water that does not meet the requirements of the turbidity standard stated in this specification.
157.04 Controls and Limitations on Work. Add the following:
When erosion control materials are to be left on site after the project has been completed, construct erosion controls of organic and bio-degradable materials whenever possible.
157.09 Diversions. Add the Following:
Stream diversion, related appurtenances and measures.
(a) Stream Bypass Dam and Pipe. Construct a sandbag dam and bypass pipe as shown on the Plans or as approved by the CO.
(1) Primary Bypass Dam. Construct the Sandbag Dam in a dry condition by first pumping the stream around the dam. Place temporary cofferdams as needed. Remove irregularities from the streambed to form smooth bedding for the bypass dam. Whenever possible, place the dam so that water does not seep from the downstream side of the dam; if seepage occurs, improve the dam by adding sandbags, improving or adding seals, or other means to minimize seepage from the dam. When it is impossible to eliminate seepage, construct a sump and pump clear water to the upstream side of the dam.
(2) Bypass Dam Impermeable Membrane. Place an impermeable membrane within the sandbag dam and entrenched in the streambed as shown on the
Plans or approved by the CO. When approved by the CO, a small amount of granular bentonite may be used along the edges of the membrane to minimize seepage between the membrane and the streambed. Cut a hole in the membrane to fit the bypass pipe and seal the membrane to the
Bypass Pipe or the Bypass Pipe Collar using gaskets, adhesive strips or other approved methods.
(3) Bypass pipe. Place bypass pipe as shown on the Plans or approved by the
CO. Place the upstream invert of the pipe at the lowest point in the stream channel as practical. Install joints and elbows as shown on the Plans and as needed to accommodate the site layout. Use watertight seals meeting the requirements of Section 712.03. Do not place backfill until the pipe joints have be approved by the CO. Allow water to pass through pipe only after a downstream splash apron has been prepared in a manner that will protect the stream from scour and turbidity, and protect fish from harm.
Construct the bypass in a manner that avoids injury to aquatic organisms.
(4) Downstream Dam. When water flows into the work area from downstream, construct a cofferdam as needed to prevent water from entering the work area.
(5) Sandbags. Prior to placing the lower rows of sandbags, remove the larger rocks or other irregularities from the streambed to form a smooth bed. Use only clean sand or coarse concrete aggregate in the sandbags. Loosely fill and tamp the sandbags in place to minimize seepage between, under, and around the bags.
(6) Bypass Pipe Collar. Install and maintain a leak-proof pipe collar as shown on the Plans or approved by the CO.
(b) Pumps. Install pumps as required to re-route stream around construction site and dewater foundations. When failure of a pump would result in movement of sediment or turbidity beyond the work area, provide a back-up pump that is readily available. Use the pumps for installing and removing the gravity bypass pipes and dams, at other times to facilitate construction operations, and during storms to supplement the gravity bypass. Equip the pump with approved fish screens, appropriate suction and discharge hoses, fittings and flow regulation equipment as needed. Insure that the pumps are clean, free of leaks and that the oil used as lubricant in the pump seal systems is food grade mineral oil. Install and operate pumps in a manner that will avoid impingement of small fish against the intake screens.
(1) Pump intakes. Use one of the following methods of screening on all draft hoses:
i. Perforated Plate; screen openings shall not exceed 3/32 or 0.0938-inches
ii. Profile Bar Screen; the narrowest dimension in the screen openings shall not exceed 0.0689-inches in the narrowest direction.
iii. Woven Wire Screen; screen openings shall not exceed 3/32 or
0.0938-inches the narrow direction.
Check intakes frequently and clean as needed with wire brushing, flushing, or any other acceptable method.
(2) Sump Pumps. Supply pumps capable of dewatering the structure foundation. Insure that pumps are clean and free of leaks. Remove sediment and turbidity in the Sump Pump discharge water prior to re-entering the stream.
(c) Sump Water Discharge. Discharge sump water as shown on the Plan or as approved by the CO. Apply one or more methods to remove sediment from sediment-laden water. Apply additional methods as needed to eliminate increase in downstream turbidity. Use the following methods as needed:
(1) Natural Vegetation/Soil Dispersal and Filtration. Discharge sump water onto areas of ground most advantageous for dispersal and filtration of sediment, e.g. flat heavily vegetated soil. When single point discharge does not function adequately, discharge water into a perforated pipe or series of pipes laid approximately level so that the brown water disperses over a wide area.
(2) Silt Bag Filtration. Discharge sump water into one or more Silt Bags.
Use Silt Bags constructed of Mirafi 180N (or approved equal) with sewn seam strengths of 90% efficiency according to ASTM D4632. Construct bag to hold and filter sump water. Place silt bag(s) on level ground having layer of straw one foot thick minimum.
(3) Settling Basin. Discharge sump water into one or more Basins. The
Basins may be pre-manufactured tanks, folding tanks, geotextile or membranes placed over a sandbag or weed-free straw berm, or other similar basins designed to separate sediment from the water.
(4) Suspended Sediment Coagulation Agent. When other methods do not function adequately, add an approved coagulation agent to water prior to discharging the water onto natural vegetation, Silt Bag, or Settling Basin.
Use a flocculation agent such as Chitisan-based Storm-Klear Gel-Floc, or approved equal. Storm-Klear products are manufactured by Vanson
HaloSource, Inc., and distributed by Natural Site Solutions, 16541
Redmond Way 405-C, Redmond, WA 98052, phone: (425) 861-9499.
Use Suspended Sediment Coagulation Agent according to manufacturer’s recommendations.
(d) Sedimats. Place Sedimats across the streambed as shown on the Plans or approved by the CO. The Sedimat is a proprietary product manufactured by
Indian Valley Industries, Inc. and distributed by Columbia Storage Inc., Vancouver Washington, phone: (800) 426-7976. Use Sedimats according to manufacturer’s recommendations.
(d) Simulated Streambed. After placement of the simulated streambed rock materials as shown on the Plans, wash the fines from the surface of the new streambed and remove the sediment using a downstream sump pump. Provide temporary sandbag dam if needed.
157.11 Temporary Turf Establishment
Delete the subsection including table 157-1 and replace with the following:
Apply seed, fertilizer, and mulch for soil erosion protection at the required rates. Protect and care for seeded areas until permanent turf establishment is in place.
157.12 Inspection and Reporting
Delete the first paragraph and replace it with the following:
Inspect all erosion control facilities at least every 7 days, within 24 hours after more than ½ inch of rain in a 24 hour period, as required by the Contractor prepared erosion control plan, and as required by contract permits.
157.13 Maintenance & Cleanup.
Delete the second sentence and add the following:
Clean erosion control measures when sediment is 6 inches deep or when they are half full of sediment, which ever is less.
Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property.
When removing sandbags, spread sand away from the waterway; if coarse concrete aggregate meeting the requirements of Section 703.02 is used in the sandbags, the gravel may be distributed evenly across the waterway.
Remove geotextile and other non-biodegradable materials used in dewatering and sediment control operations from Government property, unless otherwise approved by the CO.
203 - Removal of Structures and Obstructions
203.05 Disposing of Material.
Add the following:.
Gate Removal – At various locations guardrail gates have been installed, contractor shall remove gate system and dispose of all National Forest Lands unless gate is a typical Forest Service gate to be removed. Contractor shall remove Forest Service gates to the Tusquitee Work Center in condition prior to disassembly. Gate removal shall be paid under bid item 203(11)
Placing Slash on Embankment Slopes. Place construction slash on completed recon toured slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope or as directed by the Forest Service.
Disposal of Log Culverts and Other Untreated Timber Structures. Place log culverts, bride material and other untreated timber structures along the obliteration routes to minimize erosion. Removal of bridge components shall be paid under bid item 203(10)
Disposal of metal or plastic pipes – Contractor shall remove all metal culverts alone the routes designated to be obliterated and dispose of off National Forest Lands. Products should be recycled if possible. Payment for removal of pipes shall be paid under bid item
203(09)
622 – Equipment Rental 623.00_0811_us_12_15_2009
622.02 Rental Equipment
Add the following: this project requires 4 track excavators and one bull dozer the 4(four) excavators shall be of the following: two (2) Caterpillar 321size zero turn or equal and two
(2) Caterpillar 314 size machines. The bull dozer shall be a Caterpillar D6 equipment with rippers. Contractor shall provide support resources necessary to get each operator to and from equipment each day.
Each machine shall be supplied with the following:
1. Operator meeting the minimum experience required of 7 years operating a track excavator of size specified.
A. Equipment Operator Performance - Equipment operators shall be experienced and competent in the use of the equipment to which they are assigned. They shall be expected to demonstrate a level of proficiency with the equipment which enables them to be productive in all aspects of trail obliteration.
2. Spill kit, each excavator shall be equipped with absorbent pads, booms capable of absorbing 100% of hydrocarbons due to a hydraulic hose burst.
3. Two-way radio capable of communicating with project superintendent and other work forces within the project area.
Construction Requirements
622.02 Rental Equipment
Add to this section:
Equipment Specifications
(2) Caterpillar 321 or equal - Hydraulic Excavator: Track mounted, hydraulic powered
Excavators:
Min weight – 44,000 lbs
Min. Reach – 26 feet
Min Digging Depth – 20 feet
Min Bucket size – 1.00 Cu Yd.
Min 125 HP
Excavator shall be equipped with hydraulic thumb, with experienced operator as described above.
(More than 1 excavator may be required. Unit price bid should be for one excavator for one hour of running time as recorded on the hour meter of each excavator).
(2) Caterpillar 314 or equal - Hydraulic Excavator: Track mounted, hydraulic powered
Excavators:
Min weight – 30,000 lbs
Min. Reach – 20 feet
Min Digging Depth – 17 feet
Min Bucket size – 0.97 Cu Yd.
Min 85 HP
Excavator shall be equipped with hydraulic thumb, with experienced operator as described above.
(More than 1 excavator may be required. Unit price bid should be for one excavator for one hour of running time as recorded on the hour meter of each excavator).
(1) Caterpillar D6 Bull dozer or equal
Dozer:
Min weight – 34,000 lbs
Min 135 HP
Dozer shall be equipped with hydraulic parallelogram rippers with experienced operator as described above.
Unit price bid should be for one dozer for one hour of running time as recorded on the hour meter of each dozer).
Public Safety and Traffic Control
The contractor shall exercise caution and care while pursuing the work in order to prevent unnecessary conflict with other contractors.
Warning signs shall be posted on each end of work areas or zones. Signs shall be of the size, quantity and colors as required by the current edition of the Manual on Uniform
Traffic Control Devices (MUTCD). Copies of the MUTCD may be viewed at each district ranger station. These signs shall be moved as needed to properly delineate and identify the sections of roads being maintained. In no case shall the signs be farther than
1/2 mile from the equipment operating on the road, or 500 feet from operations alongside the road (i.e. one mile separation of the beginning and ending signs protecting a grader operation and 1,000-foot separation of the beginning and ending signs protecting a culvert cleaning operation or other “point” operation. See also “Maintenance and Control of Traffic” under the Technical Specifications for Road Maintenance.
All personnel working on this contract, including equipment operators, shall wear an
ANSI approved Class II reflective vest, hard hats and meet all OSHA requirements.
Manner of Construction - Excavation will be done in a manner which will minimize sedimentation in the stream channel. Operators will be instructed by the construction inspector as to the desired result of construction activities. Operators will be responsible for determining how best to use equipment to achieve the desired results.
C) Environmental Considerations - Earth moving equipment will cross and operate in the stream flow only when necessary and only when directed to do so by the construction inspector. Equipment shall be new or of low hours and be maintained to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs and lubrication will be performed at a safe distances from the stream and only at locations approved by the construction inspector where water is controlled by runoff control measures.
Note: Equipment older than 15 years, in exceptionally good condition, meeting all current OSHA requirements may be allowed if approved by the Contracting
Officer. Contractor shall submit all pertinent information demonstrating the condition, capabilities, and safety of the equipment as requested in section M of the solicitation.
Keep equipment clean and free of weed seeds. Keep equipment well maintained, free of leaks, capable of operating at least 90% of the time. Meet all state and federal regulations. Operate equipment with a fully trained, qualified, and competent operator at all times.
Equipment meets state and federal regulations.
Operator is trained, qualified and competent and a minimum of five years experience operating a track excavator.
Equipment is clean and free of weed seeds.
Equipment is well-maintained and free of leaks.
622.04 Measurement
Add the following: All work hours shall be documented by the contractor and submitted to the COR at the end of each week. Only hours documented by the hour meter on the equipment will be used for payment. Mobilization to the site will be paid under bid item15101 and no other payment will be made.
Delete: First sentence of the third paragraph of this section
IN
623 - General Labor
623.00_0811_us_12_15_2004
623.02 Workers and Equipment.
Add the following:
a) Faller/Saw:
Experienced faller with at least two saws with minimum 24 inch bars. Sufficient supply of sharpened chains, lube, and fuel for work specified. Provide chokers if necessary for the work to be preformed.
b) General laborer:
General laborer capable of accomplishing a variety of field work such as hand tool work, culvert installation, and the like.
c) Flagger:
Provide a trained qualified flagger and appropriate signing and safety equipment.
625 - Turf Establishment
625.04 Preparing Seedbed.
Modify the 2 nd paragraph to read:
Apply agricultural limestone at 2000 #/ac.
Delete subsection 625.05 in it entirety:
625.06 Fertilizing.
Modify the 1 st sentence to read:
Apply fertilizer at the rate of 400 #/ac by the following methods:
625.08 Mulching.
(a) Dry method. Modify the 2 nd
Apply straw mulch at a rate of 2000 pounds per acre.
625.09 Protecting and Caring for Seeded Area.
Modify 1 st
Protect and care for seeded areas until final acceptance.
635 –Temporary Traffic Control
650.00_nat_us_06_08_2004
Description
650.01 Work:
Add the following: Contractor shall be responsible for submitting a safety plan that details the methods and procedures of dealing with public vehicle traffic as well a pedestrian traffic during the life of the contract. Safety plan shall be submitted to the CO in writing prior to beginning in work.
650 - Road Closure Devices
650.00_nat_us_06_08_2004
Description
650.01 Work. Furnish and install, or install only, road/trail closure devices using fabricated gates and accessories, combination post and rail barriers, and other devices.
Materials
650.02 Requirements. Furnish materials to be used in fabricating gates and barriers.
Ensure that all hardware is galvanized in accordance with AASHTO M 232 and meets the requirements of ASTM A 307. Furnish plain or cut washers that are American Standard
Washers.
Furnish timber posts, rails, and lumber that meet the requirements of AASHTO M 168.
Provide timber of the species and type, with preservative treatment type and retention rate called for in the plans.
Furnish 3,000 psi concrete that meets the requirements of Table 601-1, is furnished by a commercial supplier, or (for posts only) use dry, preproportioned bagged mix meeting requirements of ASTM C 387.
Construct earth mound barriers from excavated material adjacent to the barrier location, or from other designated locations.
Construction
650.03 Performance. Place road closure devices at designated locations. Construct all devices to the required dimensions. In assembling gates, perform required welding in accordance with the best modern practice and the applicable requirements of AWS D1.1.
After assembly, clean non-galvanized steel pipe gates and paint them with one coat of zinc-rich primer and two coats of exterior enamel of the required type and color.
Set all posts vertically and embed them to the required depth. Place concrete for embedment against undisturbed earth within an excavation sized to achieve the embedment dimensions. Compact the backfill in 6 inch layers to finished grade.
Furnish and install all signs and/or reflective warning markers accessory to the road closure device.
650.04 Acceptance. Construction of road closure devices will be evaluated under
Subsections 106.02 and 106.04.
Measurement
650.05 Measure the items listed in the bid schedule according to Subsection 109.02.
Payment
650.06 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 650 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
713 - Roadside Improvement Material
713.04_0811_us_08_12_2005
713.03 Fertilizer.
Fertilizer shall have the following minimum percentages of available nutrients:
17% Nitrogen; 17% Phosphorus; 17% Potassium
713.04 Seed.
Add the following:
Seed mix shall be applied at the following rate (lbs/acre):
Dates shown are general guidelines. If weather conditions are abnormal, CO will consult with Forest Service specialists for revised seeding times. All seed must have a 85% germination rate stamped on the seed label.
Scientific Name Common Name Planting Density
Elymus virginicus Virginia wild rye 22 lbs/acre
Festuca rubra Creeping red fescue 15 lbs/acre
Uniola latifolia (Chasmanthium latifolium)
River oats 1 lbs/acre
Dichanthelium clandestinum
Deertongue 2 lbs/acre
Temporary Seeding:
Foxtail (German) millet: 30
Partridge Pea: 5
Winter Seeding :
Small Grain Cereal Rye: 35
Furnish a product certification for each kind or type of seed, certifying that the seed was tested by a recognized laboratory within 6 months of the date of delivery. Include the following:
(1) Name and address of testing laboratory
(2) Date of test
(3) Seed identification
(4) Test results showing the percentages of purity, germination, and weed content
(5) Certified weed-free seed.
713.05_nat_us_03_02_2005
713.05 Mulch.
Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use. If certified noxious weed free straw in unavailable contractor may request in writing that wheat straw be used.
Materials
All materials shall meet the approval of the Designer and include Coir fiber mat 700, hardwood stakes, and live stakes (see “Planting” Specs).
Installation
Coir fiber mat 700 shall be used on upper and lower stream banks (above and below the bankfull elevation). The matting shall be fastened in place using hardwood stakes. During the following plant dormant season, live stakes shall be planted in the matting from water’s edge to just above bankfull. Species include silky dogwood (Cornus ammonum), black willow (Salix nigra), silky willow (Salix sericea), and common elderberry
(Sambucus canadensis) from a local source.
Provide stakes made of hardwood to anchor the matting. Stakes shall be installed to no less than 1 foot deep for use on side slopes and no less than 2 feet deep at the toe of the slope and along the top edge of matting.
Place the matting upon final grading, following seed and mulch application. Provide a smooth soil surface free from stones, clods, or debris which will prevent the contact of the matting with the soil. Unroll the matting on the contour, starting at the bottom of the slope and apply without stretching such that it will lie smoothly but loosely on the soil surface. Bury the top end of each piece of matting in a narrow trench at least 6 in. (150
mm) deep and tamp firmly after staking with evenly spaced stakes. Stake the matting according to the manufactures recommended pattern for specific product and slope.
Where one roll of matting ends and a second roll begins, install matting end-over-end with approximately 6 inches of overlap. Stake through overlapped area using 5 stakes.
Install stakes across the matting at ends, junctions, and trenches approximately 1.3 feet apart.
718 - Traffic Signing and Marking Material
718.02_nat_us_03_02_2005
718.02 Reserved.
Replace this section with the following:
718.02 Protective Overlay Film and Edge Film.
Protective overlay film will be a high performance flouropolymer film such as 3M
Scotchlite Premium Protective Overlay Film Series 1160 or approved equal.
Edge film will be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3 inches wide vinyl film.
718.14_nat_us_03_02_2005
718.14 (g) Waterborne Traffic Paint - Daylight reflectance
Delete the existing subsection and substitute the following:
(g) Daylight reflectance. (Without glass beads)
(1) White, ASTM E 1347 84% relative to magnesium oxide standard
(2) Yellow, ASTM E 1347 55% relative to magnesium oxide standard