RECOVERY* Tellico Trail Obliteration - Nantahala National Forest, North Carolina
Solicitation number
AG-4419-S-10-0581
Issued by

About this file

Section B - Schedule of Items

View the file

Other files

File Type Posted
SF 30 Amendment 2.pdf PDF
Revised Section I - Additional Clauses.doc DOC document
Attachment 3 - Specifications Rev 1.doc DOC document
SF30 Amendment 1.pdf PDF
Pre-Bid Sign in Sheet.pdf PDF
Section B1 - SoI - Supplemental Instruction.doc DOC document
Attachment 1 - Specifications.pdf PDF
Exhibit 1 - Drawings.pdf PDF
Sections C thru M - Solicitation .doc DOC document
Attachment 2 - Wage Determination.doc DOC document
Section A - SF1449.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPLETE BID SCHEDULE INCLUDES

TRAILS 3,4,5,7,8,9,10,10A,11 12

BID SCHEDULE PAGE 1 OF 10

Contract 420-3

Trail Name 4.15

ITEM NO. DESCRIPTION METHOD OF

MEASURE UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $__________ $__________

203(09) Remove Culverts AQ EA 17 $__________ $__________

203(10) Remove Bridge Structures AQ EA 3.0 $__________ $__________

622(01) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS. AQ Hour 400.0 $__________ $__________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator -operations directed by USFS. AQ Hour 80.0 $__________ $__________

625(27) Seeding, Fertilizing, and Mulching AQ Acre 20.1 $__________ $__________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 1200.0 $__________ $__________

Trail # 3 $__________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 3 BID SCHEDULE

SUB-TOTAL FOR

Length (Miles)Bear Pen

UPPER TELLICO OHV AREA

Trail/Road No.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

TRAILS 3,4,5,7,8,9,10,10A,11, 12

BID SCHEDULE PAGE 2 OF 10

Contract 420-4

Trail Name 2.35

ITEM NO. DESCRIPTION METHOD OF

MEASURE UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $__________ $__________

203(09) Culvert Removal AQ EA 8.0 $________ $_____________

203(10) Remove Bridge Structures AQ EA 2.0 $________ $_____________

622(01) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS. AQ Hour 380.0 $________ $_____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator -operations directed by USFS. AQ Hour 120.0 $________ $_____________

625(27) Seeding, fertilizing, and mulching AQ Acre 11.4 $________ $_____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 660.0 $________ $_____________

TR # 4 $_____________

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 4 BID SCHEDULE

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

UPPER TELLICO OHV AREA

Trail/Road No.

Fain Ford Length (Miles)

COR and Inspector based on the hour meter of each excavator/dozer SUB-TOTAL FOR

BID SCHEDULE PAGE 3 OF 10

Contract Trail - 5

Trail Name 0.43

ITEM NO. DESCRIPTION METHOD OF

MEASURE UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $__________ $__________

203(09) Removal of Culverts AQ EA 2 $________ $___________

622(01) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS. AQ Hour 240.0 $________ $___________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator -operations directed by USFS. AQ Hour 24.0 $________ $___________

625(27) Seeding, fertilizing, and mulching AQ Acre 1.6 $________ $___________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 120.0 $________ $___________

TR # 5 $___________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 5 BID SCHEDULE

UPPER TELLICO OHV AREA

Trail/Road No.

Tellico River Length (Miles)

BID SCHEDULE PAGE 4 OF 10

Contract Trail - 7

Trail Name 0.73

ITEM NO. DESCRIPTION METHOD OF

MEASURE UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $__________ $__________

203(09) Removal of Culverts AQ EA 3 $_________ $_____________

203(10) Remove Bridge AQ EA 1 $_________ $_____________

203(11) Gate Removal AQ EA 2 $_________ $_____________

622(01) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS. AQ Hour 160.0 $_________ $_____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator -operations directed by USFS. AQ Hour 24.0 $_________ $_____________

625(27) Seeding, fertilizing, and mulching AQ Acre 3.5 $_________ $_____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 240.0 $_________ $_____________

TR # 7 $_____________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 7 BID SCHEDULE

UPPER TELLICO OHV AREA

Trail/Road No.

Bob Creek Length (Miles)

COR and Inspector based on the hour meter of each excavator/dozer

BID SCHEDULE PAGE 5 OF 10

Contract Trail - 8

Trail Name 5.97

ITEM NO. DESCRIPTION METHOD OF

MEASURE UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $________ $__________

203(09) Culvert Removal AQ EA 21 $________ $_____________

203(10) Bridge Removal AQ EA 7 $________ $_____________

203(11) Gate Removal AQ EA 2 $________ $_____________

622(01) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by USFS. AQ Hour 220.0 $________ $_____________

622(03) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by USFS. AQ Hour 220.0 $________ $____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by USFS. AQ Hour 60.0 $________ $_____________

625(27) Seeding, fertilizing, and mulching AQ Acre 28.9 $________ $_____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 2080.0 $________ $_____________

TR # 8 $_____________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 8 BID SCHEDULE

Length (Miles)Bob Creek

UPPER TELLICO OHV AREA

BID SCHEDULE PAGE 6 OF 10

Contract Trail - 9

Trail Name 0.73

ITEM NO. DESCRIPTION

METHOD

OF

MEASURE

UNIT QUANTITY UNIT

PRICE TOTAL

151(01) Mobilization LSQ LS 1 $_______ $__________

203(09) Culvert Removal AQ EA 5 $_______ $_____________

203(11) Gate Removal AQ EA 2 $_______ $_____________

622(01) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by USFS.

AQ Hour 140.0 $_______ $_____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by USFS.

AQ Hour 24.0 $_______ $_____________

625(27) Seeding, fertilizing, and mulching AQ Acre 4.4 $_______ $_____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 270.0 $_______ $_____________

TR # 9 $_____________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 9 BID SCHEDULE

UPPER TELLICO OHV AREA

Mistletoe Length (Miles)

BID SCHEDULE PAGE 7 OF 10

Contract Trail - 10 Trail Name 4.48

ITEM NO. DESCRIPTION

METHOD

OF

MEASURE

UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $__________ $__________

203(09) Culvert Removal AQ EA 18 $_________ $___________

203(10) Bridge Removal AQ EA 3 $_________ $___________

6220(01) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by

USFS.

AQ Hour 440.0 $_________ $___________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by

USFS.

AQ Hour 24.0 $_________ $___________

625(27) Seeding, fertilizing, and mulching AQ Acre 24.4 $_________ $___________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 1260.0 $_________ $___________

TR # 10 $___________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 10 BID SCHEDULE

UPPER TELLICO OHV AREA Trail/Road No.

Round Mountain Length (Miles)

BID SCHEDULE PAGE 8 OF 10

Contract Trail - 10A

Trail Name 1.99

ITEM NO. DESCRIPTION

METHOD

OF

MEASURE

UNIT QUANTITY UNIT

PRICE TOTAL

151(01) Mobilization LSQ LS 1 $_______ $__________

203(09) Culvert Removal AQ EA 9 $______ $____________

203(10) Bridge Removal AQ EA 3 $______ $____________

622(01) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by USFS.

AQ Hour 240.0 $______ $____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by USFS.

AQ Hour 40.0 $______ $____________

625(27) Seeding, fertilizing, and mulching AQ Acre 10.9 $______ $____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 720.0 $______ $____________

TR # 10A $____________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 10A BID SCHEDULE

UPPER TELLICO OHV AREA

Round Mountain Spur Length (Miles)

BID SCHEDULE PAGE 9 OF 10

Contract Trail - 11

Trail Name 2.67

ITEM NO. DESCRIPTION

METHOD

OF

MEASURE

UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $________ $__________

203(09) Culvert Removal AQ EA 11 $_______ $_____________

622(01) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator - operations directed by USFS.

AQ Hour 310.0 $_______ $_____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by USFS.

AQ Hour 40.0 $_______ $_____________

625(27) Seeding, fertilizing, and mulching AQ Acre 14.6 $_______ $_____________

713(01) Erosion Control Matting (700 COIR mat w/ Live Stakes included) AQ SY 660.0 $_______ $_____________

TR # 11 $_____________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO OHV TRAIL SYSTEM OBLITERATION

TRAIL 11 BID SCHEDULE

UPPER TELLICO OHV AREA

Chestnut Mount. Length (Miles)

BID SCHEDULE PAGE 10 OF 10

Contract Trail - 12 Trail Name 1.24

ITEM NO. DESCRIPTION

METHOD

OF

MEASURE

UNIT QUANTITY UNIT PRICE TOTAL

151(01) Mobilization LSQ LS 1 $________ $__________

622(01) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS.

AQ Hour 280.0 $________ $____________

622(02) 1-Cat D6 Bull Dozer w/ rippers or equal with Qualified Operator - operations directed by USFS.

AQ Hour 200.0 $________ $____________

625(27) Seeding, fertilizing, and mulching AQ Acre 10.5 $________ $____________

TR # 12 $____________

622(10) 1-Cat 321 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS.

AQ Hour 150.0 $________ $____________

622(10) 1-Cat 314 (Zero Turn) or equal Excavator with Qualified Operator -operations directed by USFS.

AQ Hour 250.0 $________ $____________

**Equipment hours will be documented by the project Contractor, COR and Inspector based on the hour meter of each excavator/dozer

SUB-TOTAL FOR

**RECOVERY** TELLICO TRAIL SYSTEM OBLITERATION

TRAIL 12 BID SCHEDULE

UPPER TELLICO OHV AREA Trail/Road No.

Hawk Knob Length (Miles)

TOTAL BASE BID FOR TRAILS 3,4,5,7,8,9,10,10A,11 &12

TOTAL BID ALTERNATE BID

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

BID ALTERNATES

Trail 3 Bid Schedule
Trail 4 Bid Schedule
Trail 5 Bid Schedule
Trail 7 Bid Schedule
Trail 8 Bid Schedule
Trail 9 Bid Schedule
Trail 10 Bid Schedule
Trail10A Bid Schedule
Trail 11 Bid Schedule
Trail 12 Bid Schedule